Harbor Drive Trunk Sewer
Benefits
This replacement project will eliminate future sewer main stoppages and sewer spills, while bringing the existing sewer mains up to current City standards.
The project will replace approximately 4,700 linear feet (0.9 miles) of existing 39-inch concrete sewer main, with a 48-inch plastic lined concrete pipe. Curb ramps will be installed within the project area and streets impacted by construction will be slurry sealed.
- Fact Sheet (PDF)
- Project Location Map (PDF)
Schedule
Construction Start: April 2012
Construction Finish: January 2013
Cost
The total cost of the project is approximately $9,000,000 million.