Fire Stations
Fire Station 28
Fire Station 28 was originally built in 1958 as Station 26 at a cost of $68,100, it became Fire Station 28 in July 1958.
Fire Station 28 serves Kearny Mesa/Montgomery Field and its surrounding areas.
Speciality Station - Pump Testing
Fire Station 28 is responsible for testing the pumping capacity of each new fire engine before it is placed into a station. Fire Station 28 ensures the engines actually pump the amount of water the manufacturer specifies.
Apparatus
- Engine 28
- Truck 28
- Water Tender 28
- Foam 28
- Crash 28
Incident Runs (FY 12)
| Engine 28 | Truck 28 | |
|---|---|---|
| Total | 2,419 | 709 |
| Fire | 151 | 127 |
| Medical/Rescue | 1,931 | 445 |
| Other | 337 | 137 |
| Average Response Time | 5:57 | 6:39 |

