San Diego Standard Drawings
Updates Approved for Use
This site includes updates or new Standard Drawings in transition to the next edition of the City of San Diego Standard Drawings that have been approved for use. The inclusion of these drawings in the Contract Documents is the responsibility of the Engineer of Record either by reference or placing the details on the Plans where needed. For the City Public Works construction contracts, the Engineer of Record must determine if the design is not substantially complete e.g., past 60% and has no significant budgetary implications. Otherwise, case by case review to assess the implications is necessary. When included in the Contract Documents, these drawings will control over the current edition of the City of San Diego Standard Drawings when a conflict arises.
- SDD-110 Pipe Bedding and Trench Backfill for Storm Drains (PDF)
- SDG-107 Trench Resurfacing for Asphalt Concrete Surfaced Streets (PDF)
- SDG-108 Trench Resurfacing for PCC Surfaced Streets (PDF)
- SDG-130 General Curb Ramp Notes and Supplemental Details (PDF)
- SDG-132 Curb Ramp Type A and B (PDF)
- SDG-134 Curb Ramp Type C1 (PDF)
- SDG-135 Curb Ramp Type C2 (PDF)
- SDG-136 Curb Ramp Type D (PDF)
- SDM-117 Accessible Parking (PDF)
- SDS-110 Pipe Bedding and Trench Backfill for Sewers (PDF)
- SDS-120 Sewer Manhole Base (PDF)
- SDW-104 Fire Hydrant Installation (PDF)
- SDW-150 1" Water Service Installation (PDF)
- SDW-153 Gate Well Cap & Can Installation for Valves 4" and Larger (PDF)
- SDW-162 Pipe Support for Undercut AC Water Main (PDF)