Steps to Getting Connected to Recycled Water

Photo of Water Pipe
  1. Site Assessment

    City of San Diego staff conducts on-site preliminary assessment of the existing water systems. Call (619) 533-7595 to make an appointment.
  2. Prepare Design

    Customer prepares plans according to State and County health regulations and the City of San Diego Recycled Water System Guidelines and Standards. Refer to the City of San Diego Recycled Water Rules & Regulations for specifics.
  3. Design Review and Plan Check

    Plans must be reviewed and approved by the City of San Diego and the County of San Diego.

    City of San Diego review –

    • Fill out a general application form and a Deposit Account/Financial Responsible Party form and submit with three (3) sets of recycled water plans, site plans, public improvement drawings and a plan review deposit of $2,400 to:

      Water Department/Recycled Water Program
      600 B Street, 6th floor,
      San Diego, CA 92101.

      Office hours are Monday through Friday 8 a.m. to 4:30 p.m. Call for an appointment at (619) 533-7595. Checks and money orders payable to City Treasurer.

    • For cooling tower, industrial or dual plumbing (toilet/urinals) plan review – three sets of plumbing plans and an engineering report are required in addition to the site plans and deposit noted above.
    • If the site does not have an assigned address, contact the Development Services Department address coordinator at (619) 446-5411 to have an address assigned.
    • Plan check process is conducted by city staff and takes approximately 14 business days to complete. Customers are notified upon plan approval.

    For information on plan requirements refer to the Recycled Water Plan Check List (PDF: 25K). For additional information call (619) 533-7595.

    County of San Diego review -
    Complete County application form and submit two sets of plans to:

    County of San Diego Department of Environmental Health
    5201 Ruffin Road, Suite C
    San Diego, CA 92123

    For assistance call (858) 694-2121 or (858) 694-2145.

  4. Pre-Construction Inspection

    Following plan approval and prior to the start of construction a pre-construction inspection must be scheduled with the City of San Diego's Water Department Recycled Water Program. Call (619) 533-7595 to schedule. Construction cannot begin until inspection has been completed.
  5. Meter Service Request

    Customer initiates meter request by calling (619) 533-7595. Following meter service request processing, meter fees will be calculated and customer will be notified. Recycled water meter, service and inspection fees are payable to:

    City of San Diego
    Development Services Department
    1222 First Avenue, 4th floor
    San Diego, CA 92101

    Business hours: Monday, Tuesday, Thursday, Friday – 7 a.m. to 4 p.m.
    Wednesday – 9 a.m. to 4 p.m.

    Schedule cross-connection shutdown test with Water Department staff (619) 533- 7595. Test will be conducted by City of San Diego staff following completion of construction.

  6. Pre-connection Inspection and System Shutdown Test

    Once on-site construction is completed and prior to the final connection to the recycled water system, Water Department staff, in conjunction with the County Department of Environmental health, conducts a system shutdown test. Call (619) 533-7595 to schedule appointment.
  7. Initiate Service

    Call Water Department Customer Service to initiate service (619) 515-3500.
  8. Required Training

    Authorized customer representative is required to attend the Recycled Water Site Supervisor Course offered by the City of San Diego and the San Diego County Water Authority.
  9. Annual Inspections/Shutdown Test/Cross-Connection Control Test

    Annual recycled water system inspections are performed by the City of San Diego Water Department. Every fours year a cross-connection test is conducted by the City of San Diego and the County Department of Environmental Health.
  10. Information

    For more information call (619) 533-7572 or visit the City's web site at www.sandiego.gov/water/recycled.
| Water Home | General Information | City Lakes and Recreation | Water & Sewer Bill/Rates | Top of Page |
| Water Conservation | Recycled Water | Water Quality | Infrastructure/Capital Improvements |
Site Map Privacy Notice Disclaimers