Water Purification Demonstration Project
Project Reports
Water Purification Demonstration Project – Report Overview
Water Purification Demonstration Project – Project Report (Final Draft)
Click here for the entire Water Purification Demonstration Project - Project Report (Final Draft) (73MB)
- Table of Contents and Introductory Materials (PDF)
- Section A: Introduction and Summary of Findings (PDF)
- Section B: Advanced Water Purification Facility (PDF)
- Section C: San Vicente Reservoir Study (PDF)
- Section D: Regulatory Coordination (PDF)
- Section E: Public Outreach and Education (PDF)
- Section F: Full-Scale Project Considerations (PDF)
- Section G: Summary and Conclusions (PDF)
- References and Contacts (PDF)
- Appendix A: Proposal to CDPH to Augment San Vicente Reservoir with Purified Recycled Water (PDF)
- Appendix B: California Department of Public Health Concept Approval Letter (PDF)
- Appendix C: San Diego Regional Water Quality Control Board Resolution of Support (PDF)
- Appendix D: Proposed Regional Water Quality Control Board Compliance Approach (PDF)
- Appendix E: San Diego Regional Water Quality Control Board Letter of Concurrence (PDF)
- Appendix F: Independent Advisory Panel Findings (PDF)
- Appendix G: Summary of Cost Assumptions (Section 8.4 of the City of San Diego 2012 Recycled Water Study) (PDF)
- Appendix H: Public Outreach and Education
- Introduction (PDF)
- Section 1: Planning, Research and Monitoring (PDF)
- Section 2: Education and Outreach Materials and Tools (PDF)
- Section 3: Community Outreach and Tours (PDF)
- Section 4: Social Media, Conferences and Awards (PDF)
- Section 5: Media Outreach (PDF)
- Section 6: Speakers Bureau (PDF)
- Section 7: Internal Department Communications (PDF)
Water Purification Demonstration Project – Testing & Monitoring
Advanced Water Purification Facility Study Report
Click here for the entire Advanced Water Purification Facility Study Report (40MB)
- Table of Contents and Introductory Materials (PDF)
- Executive Summary (PDF)
- Section 1: Introduction (PDF)
- Section 2: Demonstration Facility Description and Observations (PDF)
- Section 3: Full-Scale Facility Considerations (PDF)
- Section 4: Full-Scale Facility Conceptual Design (PDF)
- Section 5: Full-Scale Facility Estimated Costs (PDF)
- Section 6: References (PDF)
- Appendix A: Testing and Monitoring Plan (PDF)
- Appendix B: Quarterly Testing Report No. 4 (PDF)
- Appendix C: Full-Scale Reservoir Augmentation Capacity Analysis Technical Memorandum (PDF)
- Appendix D: Estimated Construction Cost Process Area Breakdown (PDF)
- Appendix E: Estimated O&M Cost Process Area Breakdown (PDF)
- Appendix F: Demonstration Facility Power Consumption (PDF)
Limnology and Reservoir Detention Study of San Vicente Reservoir
Click here for the entire Limnology and Reservoir Detention Study of San Vicente Reservoir (18MB)
- Introduction and Contents (PDF)
- Technical Memorandum #1: Calibration of the Water Quality Model (PDF)
- Technical Memorandum #2: Hydrodynamic Modeling Study (PDF)
- Technical Memorandum #3: Nutrient and Algae Modeling Results (PDF)
- Technical Memorandum #4: Proposed Water Quality Monitoring Program (PDF)





