61°

San Diego
Weather

Accessibility Tools

  • Check if your spelling is correct, or try removing filters.
  • Remove quotes around phrases to match each word individually: "blue drop" will match less than blue drop.
  • You can require or exclude terms using + and -: big +blue drop will require a match on blue while big blue -drop will exclude results that contain drop.

PTS Portal

You can schedule an inspection for most permits in the Project Tracking System (PTS) Portal.

Exceptions:

  • Residential Rooftop-Mounted Solar Photovoltaic (PV) Permit submitted after Jan. 15, 2018
  • Simple Permit - MEP (No-plan Mechanical, Electrical and Plumbing permits) submitted after April 30, 2018

For these permits, schedule an inspection in the Citizen Portal.


Need help with PTS?

Try our helpful PDF icon step-by-step instructions for PTS (opens in a new tab).

You must have Javascript enabled to use this form.