Community Planning Group Recommendations for Development Projects
Grading Permit for ADU at 12984 Via Grimaldi
Project Number:
PRJ 1088659
Community:
Torrey Pines
Vote:
Approve: 9-0-0
Conditions or Recommendations:
Approved as proposed.
Concerns Expressed
o Visibility triangle on the Via Grimaldi
o Hardscape / softscape percentages per code
o 16’ driveway width and second driveway allowed on lot and within parking impact overlay zone
Distribution Date:
Lazy Dog Restaurant
Project Number:
PRJ-1072780
Community:
Mira Mesa
Vote:
Approve: 14-0-0
Conditions or Recommendations:
N/A
Distribution Date:
Pinewood Drive
Project Number:
PRJ-1107304
Community:
Torrey Pines
Vote:
Approve: 9-0-0
Conditions or Recommendations:
Approve project as proposed.
Distribution Date:
634 Rosecrans Street
Project Number:
PJ-1073441
Community:
Peninsula
Vote:
Approve: 9-0-0
Conditions or Recommendations:
Distribution Date:
920-922 Moana Drive
Project Number:
PRJ-1105250
Community:
Peninsula
Vote:
Approve: 9-0-0
Conditions or Recommendations:
Distribution Date:
10 on Grand
Project Number:
109855
Community:
Pacific Beach
Vote:
Deny: 2-6-0
Conditions or Recommendations:
Include handicapped parking space on site.
Include more on-site parking as neighborhood is already short of onstreet parking.
Distribution Date:
3445 Riviera ADU
Project Number:
1109653
Community:
Pacific Beach
Vote:
Approve: 8-0-0
Conditions or Recommendations:
Ensure ADU not used as a short term rental.
Distribution Date:
3445 Riviera ADU
Project Number:
1109653
Community:
Pacific Beach
Vote:
Approve: 8-0-0
Conditions or Recommendations:
Ensure ADU not used as a short term rental.
Distribution Date:
East Falls View Drive Easeemnt Vacation
Project Number:
PRJ-1107754
Community:
College Area
Vote:
Approve: 11-0-3
Conditions or Recommendations:
Concern that the engineer of record said that the intent is to file for a lot line adjustment to allow for the creation of another new lot on the back side taking access from Montezuma Road. The concern is that this allow for additional constuction which may be ministerial and not require CPG input.
No Action Reason:
Not Applicable
Distribution Date:
Chollas Creek Apartments - easements
Project Number:
PRJ-1102562
Community:
Encanto Neighborhoods
Vote:
Approve: 11-0-0
Conditions or Recommendations:
PRJ-1102562 – 4970 Market St., Chollas Creek Apartments, parcel 7 (Process 5) Easement vacations for slope, storm drain, and flowage, NE corner will be 600-700 SF of children’s play area options. Soft play area, water play area, wooden boat-type structure. More focused amenity for the toddlers and families. Talked to landscape architect, there is not a safe space for a basketball court. Affordable units on site vs. off site. Plan to do three inclusionary items on site. Dolvin: Easements: Removal of three easements. (1) storm drain easements. This will be relocated and infrastructure updated, concrete, realigned for cleaning, etc. (2) slope easement to be vacated, which should have been removed. If not, it is placed on the property owner. It serves no purpose. (3) Flowage easement. When Walgreens and adjacent property was completed, there was a flowage easement to complete work. It was removed from Walgreens but not the remaining lot. Because the parcel was not part of the development, it was not removed from the property. It doesn’t serve any purpose and is a constraint for the owner to proceed. Brian: (1) what is on the other side of 4970 Market Street? Bus Yard. (2) who was the previous developer? Unknown. Leslie: (1) Writerz Blok artwork: not in the plan. (2) Leslie suggested a spray lot. (3) Parking lot made with reflective material vs. black asphalt. Canopy trees will be on the property. Open to a spray lot on the tot lot. (4) Chollas Creek Park. (did a project in Vista Village, was homeless encampment, gangs, etc. Eyes and people on/in the park and became a community asset. Rob Campbell: Thanked for inclusive housing. Asked if they not be located next to one another if possible. Likely dispersed, one of each bedroom type (1, 2, 3). 24-36 inch box trees, LandLabs is the landscaper. Children’s play area. Mix of items 1 and 2. Slide and swing, under a canopy. Maybe put the kids near the BBQ area and adult area on the northeast part. (Broke ground on Jamba Juice at Euclid and Naranja.) Marry thanked them for hearing what we suggested and incorporating our suggestions into the plan. Leslie: Number of parking spots? Sheila: 111 spots mentioned at last meeting. Controlled access gate.
9. M/S/C: Andrea, Marry to grant vacation of easements. All in favor. *2 members online also gave approval
Distribution Date: