This page contains all Capital Improvements Program (CIP) projects anticipated to be advertised and awarded for construction in the current fiscal year listed initially in the City'sAdopted CIP budget. This page is updated throughout the year with the current cost estimates and new projects to list. It also identifies which projects werealready awardedto a construction contractor. In addition, some projects from the original list may roll-over to the first quarter of next fiscal year and possibly beyond due to unforeseen conditions. SeeConstruction Contract Typesfor more information about delivery methods. Also, visitBid and Contract Opportunitiesfor projects currently in the bid and award phase For more information about this report, call (619) 533-4207 or emailengineering@sandiego.gov.

PDF iconPRINT - Forecast of Projects to be Awarded in Fiscal Year 2022 (Third Quarter Update)

FileDOWNLOAD - Forecast of Projects to be Awarded in Fiscal Year 2022 (Third Quarter Update)

Asummary by asset-managing departmentsis listed at the bottom of this page.

*To sort on a column, click on its heading. To sort on multiple columns, hold the Shift key while clicking.

Line
Number
Project
Name
Project
Number
Asset Managing
Department
Contract
Type
Estimated
Contract
Cost ($)
Estimated
Total Project
Cost ($)
Fiscal Year
Advertising
Quarter
Advertising
Fiscal Year
Awarding
Quarter
Awarding
1 MBC Equipment Upgrades S17013 Public Utilities Design Bid Build $37,187,542 $47,645,194 FY21 Q3 FY22 Q1
2 Balboa Park Botanical Bldg Improvements S20005 Parks & Recreation Design Build $14,261,647 $21,453,000 FY21 Q2 FY22 Q1
3 PWP NCWRP Flow Equalization Basin B21059 Public Utilities Design Bid Build $11,886,000 $18,350,052 FY21 Q4 FY22 Q2
4 MBGC Irrigation & Electrical Upgrades S11010 Parks & Recreation Design Bid Build $9,199,700 $10,661,700 FY21 Q4 FY22 Q2
5 AC Water & Sewer Group 1056 (W) B18181 Public Utilities Design Bid Build $8,466,401 $10,976,801 FY21 Q3 FY22 Q1
6 RIVIERA DEL SOL NEIGHBORHOOD PARK S00999 Parks & Recreation Design Bid Build $5,524,537 $9,570,838 FY22 Q1 FY22 Q2
7 Clairemont Mesa E Improv 1 (W) B18200 Public Utilities Design Bid Build $5,222,770 $7,083,977 FY22 Q1 FY22 Q3
8 MBGC Clubhouse Demo/Prtbl Building Instl S01090 Parks & Recreation Design Bid Build $5,161,700 $7,685,084 FY21 Q4 FY22 Q2
9 San Diego NC-MBC Improvements B17006 Public Utilities Design Bid Build $2,899,148 $10,038,088 FY21 Q3 FY22 Q1
10 Clairemont Mesa E Improv 1 (S) B18202 Public Utilities Design Bid Build $2,777,959 $3,971,060 FY22 Q1 FY22 Q3
11 Tierrasanta Improv 1 (s) B21003 Public Utilities Design Bid Build $1,567,000 $2,977,429 FY22 Q2 FY22 Q4
12 Santa Clara Playground Improvements B19029 Parks & Recreation Design Bid Build $819,242 $1,989,500 FY21 Q4 FY22 Q2
13 Damon Ave Water Main Extension & AC Repl B18215 Public Utilities Job Order Contract $818,438 $1,590,707 FY22 Q3 FY22 Q3
14 El Cajon Bl-Highland-58th Improv B17003 Transportation Design Bid Build $573,647 $1,316,448 FY21 Q4 FY22 Q2
15 Santa Clara Comfort Station Improvements B19032 Parks & Recreation Design Bid Build $561,646 $1,289,500 FY21 Q4 FY22 Q2
16 Kearny Mesa Pipeline Manway B20072 Public Utilities Job Order Contract $492,786 $1,027,425 FY22 Q2 FY22 Q3
17 AC Water & Sewer Group 1056 (S) B18182 Public Utilities Design Bid Build $368,705 $428,605 FY21 Q3 FY22 Q1
18 El Cajon Blvd (Highland Ave - Chamoune Ave) streetlights B21065 Transportation Design Bid Build $311,658 $361,658 FY21 Q4 FY22 Q2
19 Governor Dr @ Lakewood St Traffic Signal B17016 Transportation Design Bid Build $306,925 $558,784 FY21 Q4 FY22 Q2
20 Reo Drive New Streetlights B19079 Transportation Job Order Contract $272,223 $413,023 FY22 Q2 FY22 Q3
21 Marlesta/Beagle (Gen-B/M-Ashf) SL UU465 B18127 Transportation Job Order Contract $217,666 $350,000 FY22 Q2 FY22 Q3
22 Mt Acadia (Mt Alifan-Mt Burnham)SL UU621 B17012 Transportation Job Order Contract $205,200 $298,000 FY21 Q4 FY22 Q1
23 Talmadge Traffic Calming Infrastructure S17001 Parks & Recreation Design Bid Build $167,100 $355,000 FY21 Q3 FY22 Q1
24 Linda Vista Skate Park Phase 2 B19062 Parks & Recreation Job Order Contract $145,000 $429,769 FY21 Q4 FY22 Q2
25 Balboa Park Golf Course - Bathroom Remod B20064 Parks & Recreation City Forces $109,600 $217,600 FY22 Q2 FY22 Q2
26 Cchavez Pkwy (I5-Comml) UU27 B21092 Transportation Design Bid Build $103,000 $148,000 FY21 Q4 FY22 Q3
27 Redwood St (Pershing-Boundary) SL UU611 B20095 Transportation Job Order Contract $23,119 $152,319 FY21 Q4 FY22 Q2
28 Wangenheim Joint Use Facility S15007 Parks & Recreation Design Bid Build $6,834,000 $9,517,667 FY21 Q2 FY22 Q2
29 AC Water & Sewer Group 1036 (W) B18121 Public Utilities Design Bid Build $4,617,986 $6,198,913 FY21 Q3 FY22 Q3
30 4182 60th St & 5973 Alta Mesa Wy Emer B22052 Stormwater Emergency (As-needed) $2,700,000 $3,500,000 FY22 Q1 FY22 Q3
31 5604 Campanile Way SD Repair Emergency B21126 Stormwater Emergency (As-needed) $1,500,000 $1,765,770 FY21 Q4 FY22 Q2
32 3405 Kite Street SD Emergency B21153 Stormwater Emergency (As-needed) $1,500,000 $2,000,000 FY22 Q1 FY22 Q3
33 AC Water & Sewer Group 1036 (S) B18123 Public Utilities Design Bid Build $1,411,352 $2,192,632 FY21 Q3 FY22 Q3
34 Talmadge AC Water Main Replacement B18197 Public Utilities Design Bid Build $1,317,345 $2,001,660 FY21 Q3 FY22 Q1
35 4617 Antioch Pl CMP SD Emergency B21127 Stormwater Emergency (As-needed) $1,200,000 $1,750,000 FY21 Q3 FY22 Q2
36 Cajon Way CMP Storm Drain Emergency B21115 Stormwater Emergency (As-needed) $1,100,000 $1,950,000 FY21 Q3 FY22 Q1
37 Accelerated MH Referral Group 1 B19097 Public Utilities Design Bid Build $1,026,647 $2,047,033 FY21 Q4 FY22 Q2
38 Mississippi St CMP SD Emergency B21137 Stormwater Emergency (As-needed) $526,000 $506,316 FY21 Q4 FY22 Q2
39 3505 Udall St (CMP) SD Emergency B21138 Stormwater Emergency (As-needed) $500,000 $1,250,000 FY21 Q4 FY22 Q2
40 Ocean Beach Pier Improvements S20011 Parks & Recreation Design Build $450,000 $1,132,907 FY22 Q2 FY22 Q2
41 Crest Canyon Park Emergency SD Replace B20019 Stormwater Emergency (As-needed) $439,000 $9,615,495 FY20 Q3 FY22 Q2
42 3984 Pacific Hwy Pump StationL Emergency B22013 Stormwater Emergency (As-needed) $425,000 $650,000 FY21 Q4 FY22 Q2
43 Palm Avenue Storm Drain Replacement B17163 Stormwater Job Order Contract $185,476 $564,208 FY22 Q2 FY22 Q2
44 Morena Conveyance Southern B15141.4 Public Utilities Design Bid Build $60,077,353 $73,727,680 FY22 Q2 FY22 Q4
45 Morena Conveyance Middle B15141.3 Public Utilities Design Bid Build $56,719,052 $71,351,280 FY22 Q2 FY22 Q4
46 Kearny Mesa Facility Improvements S20009 Citywide Design Bid Build $14,864,176 $16,421,600 FY22 Q3 FY22 Q4
47 AC Water & Sewer Group 1052 (W) B18092 Public Utilities Design Bid Build $7,106,852 $10,022,594 FY22 Q2 FY22 Q4
48 Sewer & AC Water Group 794 (S) B00395 Public Utilities Design Bid Build $6,263,573 $7,001,267 FY22 Q3 FY22 Q4
49 AC Water & Sewer Group 1050 (W) B18090 Public Utilities Design Bid Build $5,121,200 $7,511,200 FY22 Q3 FY22 Q4
50 AC Water & Sewer Group 1052 (S) B18096 Public Utilities Design Bid Build $2,796,599 $4,062,797 FY22 Q2 FY22 Q4
51 AC Water & Sewer Group 1050 (S) B18094 Public Utilities Design Bid Build $2,346,300 $3,441,200 FY22 Q3 FY22 Q4
52 MISSION CTR CNYN A SMR B00431 Public Utilities Design Bid Build $2,075,492 $3,197,185 FY22 Q3 FY22 Q4
53 Otay WTP-Basin #1 Concrete Restoration B17092 Public Utilities Design Bid Build $1,979,470 $4,747,270 FY20 Q4 FY22 Q4
54 Curb Ramp Improvement Group 1701 B17114 Transportation Design Bid Build $1,500,000 $3,426,585 FY22 Q2 FY22 Q4
55 Sewer & AC Water Group 794 (W) B16041 Public Utilities Design Bid Build $1,147,000 $1,428,000 FY22 Q3 FY22 Q4
56 Torrey Pines Gf-Repr Storm Drain Outfall B17152 Stormwater Job Order Contract $1,082,035 $3,360,000 FY22 Q3 FY22 Q4
57 Miramar Valves Replacement B20015 Public Utilities Job Order Contract $721,267 $1,398,500 FY22 Q3 FY22 Q4
58 Adams Avenue (1620) Storm Drain Replacement B13102 Stormwater Design Bid Build $547,890 $1,695,934 FY22 Q3 FY22 Q4
59 Howard Avenue- Village Pine to iris Avenue Sidewalk B18019 Transportation Design Bid Build $435,000 $1,130,060 FY22 Q3 FY22 Q4
60 Miramar Landfill Fee Booth Truck Scale #3 Replacement & Miramar Landfill Outbound Scale #5 Replacement B22086 Environmental Services Sole Source $380,000 $440,000 FY22 Q4 FY22 Q4
61 Morena Improv 3 (W) B21056 Public Utilities Job Order Contract $1,109,622 $1,637,238 FY21 Q4 FY22 Q4
62 Balboa Park Federal Bldg Improvements B20066 Parks & Recreation Design Bid Build $1,079,850 $2,293,000 FY22 Q1 FY22 Q4
63 Ocean Beach Improv 1A (W) B21152 Public Utilities Job Order Contract $1,019,252 $1,688,819 FY22 Q3 FY22 Q4
64 Oak Park Improvements 1 (W) B21024 Public Utilities Job Order Contract $892,772 $1,434,555 FY22 Q2 FY22 Q4
65 Storm Drain CMP Lining III B20087 Stormwater Job Order Contract $482,663 $604,263 FY22 Q3 FY22 Q4
66 Chollas Lake Electrical Upgrade L18001.1 Parks & Recreation Department Design Bid Build $424,000 $850,000 FY22 Q4 FY22 Q4
67 Regional Arterial Guardrail Group 2a B18201 Transportation Job Order Contract $240,032 $457,850 FY22 Q4 FY22 Q4
68 Soledad Pressure Reducing Stn Hatch (w) B21040 Public Utilities Job Order Contract $227,865 $472,931 FY22 Q3 FY22 Q3

Summary By Asset-Managing Departments

Asset-Managing Department Estimated Construction Contract Award Estimated Total Project Cost
Parks & Recreation Department $424,000 $850,000
Parks & Recreation $44,314,022 $66,595,565
Public Utilities $229,663,750 $309,652,094
Citywide $14,864,176 $16,421,600
Environmental Services $380,000 $440,000
Stormwater $12,188,064 $29,211,987
Transportation $4,188,469 $8,612,727
FY 2022 Total $306,022,481 $431,783,973

*Estimated Advertise and Award Dates for Pure Water projects are to be determined

Archive of Anticipated CIP Projects

Edit Notes
To create the print version set the font-size:0.5em on both tables. Save as PDF in Chrome; More Settings - Margins:None and Scale:85. Also change link on https://www.sandiego.gov/cip/reports to match the year if starting with quarter 1.