1 |
MYF Electrical System Upgrade |
B18034 |
Airports Department |
Design Bid Build |
$252,440 |
$420,000 |
2019 |
Q3 |
2020 |
Q1 |
2 |
Fire-Rescue Air Ops Facility - PH II |
S18007 |
Fire-Rescue Department |
Design Build |
$11,000,000 |
$12,750,000 |
2020 |
Q1 |
2020 |
Q3 |
3 |
San Diego Central Library-Boiler Replac |
B17103 |
Library Department |
Design Bid Build |
$1,003,000 |
$1,600,000 |
2020 |
Q1 |
2020 |
Q2 |
4 |
SCRIPPS MIRAMAR RANCH LIB |
S00811 |
Library Department |
Design Bid Build |
$4,270,000 |
$6,076,377 |
2020 |
Q3 |
2020 |
Q4 |
5 |
Balboa Pk Bud Kearns Aquatic Complex Imp |
S17000 |
Parks and Recreation Department |
Design Bid Build |
$2,332,000 |
$3,033,299 |
2020 |
Q1 |
2020 |
Q2 |
6 |
Bonita Cove West Comfort Station Improve |
B18230 |
Parks and Recreation Department |
Design Bid Build |
$918,388 |
$1,500,000 |
2020 |
Q1 |
2020 |
Q2 |
7 |
Bonita Cove West Playground Improvements |
B18229 |
Parks and Recreation Department |
Design Bid Build |
$3,468,768 |
$4,500,000 |
2020 |
Q1 |
2020 |
Q2 |
8 |
Cañon Street Pocket Park |
S16047 |
Parks and Recreation Department |
Design Bid Build |
$1,076,319 |
$1,941,615 |
2020 |
Q2 |
2020 |
Q4 |
9 |
Carmel Del Mar NP Comfort Station - Dev |
S16034 |
Parks and Recreation Department |
Design Bid Build |
$1,583,564 |
$2,330,564 |
2020 |
Q2 |
2020 |
Q3 |
10 |
Carmel Grove NP-Comfort Station |
S16038 |
Parks and Recreation Department |
Design Bid Build |
$941,000 |
$1,561,532 |
2020 |
Q2 |
2020 |
Q4 |
11 |
Carmel Knoll NP-Comfort Station |
S16033 |
Parks and Recreation Department |
Design Bid Build |
$572,500 |
$978,729 |
2020 |
Q2 |
2020 |
Q4 |
12 |
Carmel Mission NP Comfort Station Develo |
S16039 |
Parks and Recreation Department |
Design Bid Build |
$572,499 |
$978,729 |
2020 |
Q2 |
2020 |
Q4 |
13 |
City Heights Pool Reconstruction |
B19068 |
Parks and Recreation Department |
Design Bid Build |
$2,673,600 |
$4,188,782 |
2020 |
Q1 |
2020 |
Q2 |
14 |
Clay Street Mini Park Improvement |
L16000.5 |
Parks and Recreation Department |
Design Bid Build |
$663,000 |
$1,228,930 |
2020 |
Q1 |
2020 |
Q3 |
15 |
Egger/South Bay Comm Pk ADA Improvements |
S15031 |
Parks and Recreation Department |
Design Bid Build |
$1,678,886 |
$2,439,886 |
2020 |
Q4 |
2020 |
Q4 |
16 |
FAIRBROOK NEIGHBORHOOD PARK - DEVELOPMEN |
S01083 |
Parks and Recreation Department |
Design Bid Build |
$4,366,673 |
$6,045,539 |
2020 |
Q2 |
2020 |
Q4 |
17 |
Gamma Street Mini-Park ADA Improvements |
L16000.1 |
Parks and Recreation Department |
Design Bid Build |
$607,649 |
$1,488,291 |
2020 |
Q1 |
2020 |
Q3 |
18 |
Hickman Fields Athletic Area |
S00751 |
Parks and Recreation Department |
Design Bid Build |
$7,321,598 |
$9,560,312 |
2020 |
Q2 |
2020 |
Q4 |
19 |
Island Ave Mini Park Improvements |
L16000.2 |
Parks and Recreation Department |
Design Bid Build |
$1,135,000 |
$2,231,850 |
2020 |
Q1 |
2020 |
Q3 |
20 |
J Street Mini Park Improvement |
L16000.6 |
Parks and Recreation Department |
Design Bid Build |
$546,000 |
$1,171,670 |
2020 |
Q1 |
2020 |
Q3 |
21 |
La Jolla Pkwy/Mt Soledad Erosion Control |
B10089 |
Parks and Recreation Department |
Design Bid Build |
$1,519,920 |
$2,584,523 |
2020 |
Q2 |
2020 |
Q4 |
22 |
La Paz Mini Park |
S11103 |
Parks and Recreation Department |
Design Bid Build |
$1,502,338 |
$2,603,754 |
2020 |
Q2 |
2020 |
Q4 |
23 |
MBGC Clbhouse Demo/Prtbl Building Instl |
S01090 |
Parks and Recreation Department |
Design Bid Build |
$4,770,578 |
$6,463,816 |
2020 |
Q3 |
2020 |
Q4 |
24 |
MBGC Irrigation & Electrical Upgrades |
S11010 |
Parks and Recreation Department |
Design Bid Build |
$3,182,970 |
$4,460,000 |
2020 |
Q3 |
2020 |
Q4 |
25 |
North Park Mini-park and Streetscape Imp |
S10050 |
Parks and Recreation Department |
Design Bid Build |
$1,998,884 |
$3,484,003 |
2020 |
Q1 |
2020 |
Q3 |
26 |
Olive Grove Community Park ADA Improvements |
S15028 |
Parks and Recreation Department |
Design Bid Build |
$2,300,000 |
$1,617,849 |
2020 |
Q2 |
2020 |
Q3 |
27 |
Playa Pacifica No Parking Lot Imprvemts |
B19162 |
Parks and Recreation Department |
Design Bid Build |
$1,868,543 |
$2,819,000 |
2020 |
Q2 |
2020 |
Q3 |
28 |
Rose Marie Starns Parking Lot Imprvemts |
B19163 |
Parks and Recreation Department |
Design Bid Build |
$1,921,178 |
$2,898,000 |
2020 |
Q2 |
2020 |
Q3 |
29 |
Sage Canyon NP Concession Bldg-Develop |
S16035 |
Parks and Recreation Department |
Design Bid Build |
$767,500 |
$1,310,500 |
2020 |
Q2 |
2020 |
Q4 |
30 |
Salk Neighborhood Park & Joint Use Devel |
S14007 |
Parks and Recreation Department |
Design Bid Build |
$4,376,686 |
$6,036,686 |
2020 |
Q1 |
2020 |
Q3 |
31 |
Santa Clara Pt South Prkng Lot Imprvemts |
B19161 |
Parks and Recreation Department |
Design Bid Build |
$842,160 |
$1,290,000 |
2020 |
Q2 |
2020 |
Q3 |
32 |
Sherman Heights Com Center Playground |
B18006 |
Parks and Recreation Department |
Design Bid Build |
$366,700 |
$620,000 |
2020 |
Q1 |
2020 |
Q3 |
33 |
Solana Highlands NP-Comfort Station |
S16032 |
Parks and Recreation Department |
Design Bid Build |
$967,000 |
$1,650,266 |
2020 |
Q2 |
2020 |
Q4 |
34 |
Sunset Point Parking Lot Improvements |
B19159 |
Parks and Recreation Department |
Design Bid Build |
$181,500 |
$305,000 |
2020 |
Q2 |
2020 |
Q3 |
35 |
Torrey Highlands Neighborhood Park Upgra |
S16036 |
Parks and Recreation Department |
Design Bid Build |
$660,000 |
$785,000 |
2020 |
Q1 |
2020 |
Q3 |
36 |
Torrey Pines Gf-Repr Storm Drain Outfall |
B17152 |
Parks and Recreation Department |
Design Bid Build |
$2,135,000 |
$3,360,000 |
2020 |
Q2 |
2020 |
Q3 |
37 |
Villa Monserate Neigh Park Upgrades |
S16048 |
Parks and Recreation Department |
Design Bid Build |
$1,062,580 |
$1,695,462 |
2020 |
Q1 |
2020 |
Q3 |
38 |
Wangenheim Joint Use Facility |
S15007 |
Parks and Recreation Department |
Design Bid Build |
$6,386,396 |
$9,195,353 |
2020 |
Q1 |
2020 |
Q3 |
39 |
Police Range Refurbishment Phase II |
S18005 |
Police Department |
Design Bid Build |
$10,998,313 |
$12,160,337 |
2019 |
Q4 |
2020 |
Q1 |
40 |
30th Street Pipeline Replacement A |
B19100 |
Public Utilities Department |
Job Order Contract |
$1,000,000 |
$1,395,000 |
2019 |
Q4 |
2020 |
Q1 |
41 |
AC Water & Sewer Group 1023 (W) |
B15120 |
Public Utilities Department |
Design Bid Build |
$3,456,240 |
$5,712,000 |
2020 |
Q3 |
2020 |
Q4 |
42 |
AC Water & Sewer Group 1044 (S) |
B17185 |
Public Utilities Department |
Design Bid Build |
$475,804 |
$604,013 |
2020 |
Q1 |
2020 |
Q2 |
43 |
AC Water & Sewer Group 1044 (W) |
B17186 |
Public Utilities Department |
Design Bid Build |
$3,569,532 |
$4,217,574 |
2020 |
Q1 |
2020 |
Q2 |
44 |
AC Water & Sewer Group 1053 (S) |
B18099 |
Public Utilities Department |
Multiple Award Construction Contract |
$4,821,300 |
$5,523,300 |
2020 |
Q2 |
2020 |
Q4 |
45 |
AC Water & Sewer Group 1053 (W) |
B18093 |
Public Utilities Department |
Multiple Award Construction Contract |
$5,384,300 |
$6,443,300 |
2020 |
Q2 |
2020 |
Q4 |
46 |
AC Water Group 1038 |
B17153 |
Public Utilities Department |
Design Bid Build |
$19,637,160 |
$25,779,866 |
2019 |
Q4 |
2020 |
Q1 |
47 |
AC Water Group 1059 |
B18196 |
Public Utilities Department |
Design Bid Build |
$2,957,000 |
$4,392,000 |
2020 |
Q2 |
2020 |
Q4 |
48 |
Accelerated Pipeline Rehab Ref Group 846 |
B18185 |
Public Utilities Department |
Design Bid Build |
$1,005,500 |
$1,226,200 |
2020 |
Q3 |
2020 |
Q4 |
49 |
Accelerated Trunk Sewer Referral Group 1 |
B19150 |
Public Utilities Department |
Job Order Contract |
$400,000 |
$550,000 |
2019 |
Q4 |
2020 |
Q2 |
50 |
Alvarado Trunk Sewer Phase IV |
S15019 |
Public Utilities Department |
Design Bid Build |
$47,030,009 |
$54,329,009 |
2020 |
Q2 |
2020 |
Q4 |
51 |
Alvarado TS Water Main Relocations |
B18104 |
Public Utilities Department |
Design Bid Build |
$1,225,100 |
$1,663,500 |
2020 |
Q2 |
2020 |
Q4 |
52 |
Balboa Park Pipeline Repl Ph III (S) |
B17134 |
Public Utilities Department |
Design Bid Build |
$1,213,000 |
$1,998,500 |
2020 |
Q2 |
2020 |
Q3 |
53 |
Balboa Park Pipeline Repl Ph III (W) |
B17141 |
Public Utilities Department |
Design Bid Build |
$3,010,000 |
$5,004,135 |
2020 |
Q2 |
2020 |
Q3 |
54 |
Bonita Direct Transfer PS |
B15073 |
Public Utilities Department |
Design Bid Build |
$4,599,099 |
$6,321,396 |
2020 |
Q2 |
2020 |
Q3 |
55 |
Green Infrastructure Group 1027 |
B15103 |
Public Utilities Department |
Design Bid Build |
$1,105,000 |
$1,609,000 |
2020 |
Q2 |
2020 |
Q3 |
56 |
Harbor Drive Trunk Sewer |
S18006 |
Public Utilities Department |
Design Bid Build |
$14,700,000 |
$21,045,000 |
2020 |
Q1 |
2020 |
Q3 |
57 |
Hotel Circle CI & AC Accelerated Repl |
B18235 |
Public Utilities Department |
Design Bid Build |
$2,555,264 |
$3,657,503 |
2019 |
Q4 |
2020 |
Q1 |
58 |
Manzana Water Replacement |
B18109 |
Public Utilities Department |
Design Bid Build |
$660,000 |
$928,995 |
2019 |
Q3 |
2020 |
Q1 |
59 |
Market Street Sewer Pipe Replacement |
B17054 |
Public Utilities Department |
Design Bid Build |
$321,700 |
$518,000 |
2020 |
Q1 |
2020 |
Q3 |
60 |
Market Street Water Pipe Replacement |
B17052 |
Public Utilities Department |
Design Bid Build |
$1,605,000 |
$2,060,000 |
2020 |
Q1 |
2020 |
Q3 |
61 |
MBC Equipment Upgrades |
S17013 |
Public Utilities Department |
Design Bid Build |
$30,631,000 |
$39,560,000 |
2019 |
Q4 |
2020 |
Q2 |
62 |
Mission Beach Water & Sewer Repl (S) |
B17170 |
Public Utilities Department |
Design Bid Build |
$1,365,022 |
$1,751,000 |
2020 |
Q3 |
2020 |
Q4 |
63 |
Mission Beach Water & Sewer Repl (W) |
B17169 |
Public Utilities Department |
Design Bid Build |
$9,856,500 |
$12,833,000 |
2020 |
Q3 |
2020 |
Q4 |
64 |
Montezuma PPL/Mid City Pipeline Ph 2 |
S11026 |
Public Utilities Department |
Design Bid Build |
$40,337,000 |
$52,700,000 |
2019 |
Q4 |
2020 |
Q1 |
65 |
Morena Conveyance Middle Segment - B2 |
B15141 |
Public Utilities Department |
Design Bid Build |
$44,564,193 |
$55,705,241 |
2020 |
Q2 |
2020 |
Q4 |
66 |
Morena Conveyance Southern Segment - B1 |
B15141 |
Public Utilities Department |
Design Bid Build |
$56,551,939 |
$70,689,924 |
2020 |
Q1 |
2020 |
Q4 |
67 |
Morena Conveyance Northern Segment - B3 |
B15141 |
Public Utilities Department |
Design Bid Build |
$98,047,703 |
$122,559,629 |
2019 |
Q4 |
2020 |
Q3 |
68 |
Morena Pipeline |
S16027 |
Public Utilities Department |
Design Bid Build |
$29,200,000 |
$38,173,392 |
2020 |
Q1 |
2020 |
Q3 |
69 |
MOUNTAIN VIEW ACCELERATED (S) |
B19076 |
Public Utilities Department |
Design Bid Build |
$411,100 |
$529,200 |
2020 |
Q2 |
2020 |
Q4 |
70 |
MOUNTAIN VIEW ACCELERATED (W) |
B19075 |
Public Utilities Department |
Design Bid Build |
$859,500 |
$1,106,500 |
2020 |
Q2 |
2020 |
Q4 |
71 |
NC Morena Blvd Pump Stations & Pipelines |
B15141 |
Public Utilities Department |
Design Bid Build |
$93,975,000 |
$117,468,750 |
2019 |
Q4 |
2020 |
Q2 |
72 |
NC-MBC Improvements |
B17006 |
Public Utilities Department |
Design Bid Build |
$2,392,000 |
$39,560,000 |
2020 |
Q1 |
2020 |
Q2 |
73 |
NCPWF Influent Pump Station and Pipeline |
B16140 |
Public Utilities Department |
Design Bid Build |
$18,939,000 |
$23,958,000 |
2019 |
Q4 |
2020 |
Q2 |
74 |
NCWRP Expansion (Pkg. 1) |
B15142 |
Public Utilities Department |
Design Bid Build |
$9,734,000 |
$12,313,000 |
2019 |
Q4 |
2020 |
Q1 |
75 |
NCWRP Expansion (Pkg. 2) |
B15142 |
Public Utilities Department |
Design Bid Build |
$148,292,000 |
$191,787,000 |
2019 |
Q4 |
2020 |
Q2 |
76 |
North City Pure Water Facility (Pkg. 2) |
B15139 |
Public Utilities Department |
Design Bid Build |
$383,821,000 |
$489,368,000 |
2019 |
Q3 |
2020 |
Q2 |
77 |
North City Pure Water Pipeline & Dechlorination Facility (Package 1) |
B16035 |
Public Utilities Department |
Design Bid Build |
$87,678,917 |
$109,598,646 |
2019 |
Q4 |
2020 |
Q1 |
78 |
North City Pure Water Pump Station |
B15140 |
Public Utilities Department |
Design Bid Build |
$13,000,000 |
$17,617,145 |
2019 |
Q3 |
2020 |
Q2 |
79 |
North City Water Reclamation Plant Electrical Upgrades |
S17012 |
Public Utilities Department |
Design Bid Build |
$26,450,000 |
$26,450,000 |
2019 |
Q4 |
2020 |
Q2 |
80 |
Otay 1st/2nd PPL West of Highland Avenue |
S12016 |
Public Utilities Department |
Design Bid Build |
$24,529,454 |
$33,677,271 |
2019 |
Q3 |
2020 |
Q1 |
81 |
Otay 2nd Pipeline Phase 1 |
B14092 |
Public Utilities Department |
Design Bid Build |
$9,960,000 |
$13,767,000 |
2019 |
Q4 |
2020 |
Q1 |
82 |
Pipeline Rehabilitation AQ-1 |
B17151 |
Public Utilities Department |
Design Bid Build |
$4,838,000 |
$5,900,000 |
2019 |
Q4 |
2020 |
Q1 |
83 |
Pipeline Rehabilitation AR-1 |
B17150 |
Public Utilities Department |
Design Bid Build |
$3,947,000 |
$4,813,000 |
2020 |
Q2 |
2020 |
Q4 |
84 |
PIPELINE REHABILITATION AV-1 |
B18062 |
Public Utilities Department |
Design Bid Build |
$4,325,000 |
$5,275,000 |
2020 |
Q2 |
2020 |
Q4 |
85 |
PIPELINE REHABILITATION AX-1 |
B18203 |
Public Utilities Department |
Design Bid Build |
$4,754,000 |
$5,798,000 |
2020 |
Q2 |
2020 |
Q4 |
86 |
Plaza De Panama Pipeline Replacements (S |
B17132 |
Public Utilities Department |
Design Bid Build |
$517,360 |
$822,250 |
2019 |
Q3 |
2020 |
Q2 |
87 |
Plaza De Panama Pipeline Replacements (W |
B17139 |
Public Utilities Department |
Design Bid Build |
$706,600 |
$1,039,261 |
2019 |
Q3 |
2020 |
Q2 |
88 |
Pressure Reducing Stations Upgrades Phs1 |
B16017 |
Public Utilities Department |
Design Bid Build |
$3,740,000 |
$6,290,000 |
2020 |
Q2 |
2020 |
Q3 |
89 |
Rancho Penasquitos Improv 1(W) |
B19093 |
Public Utilities Department |
Multiple Award Construction Contract |
$4,277,500 |
$4,544,041 |
2020 |
Q2 |
2020 |
Q4 |
90 |
Remaining Small Diameter CI Water Ph 3 |
B17091 |
Public Utilities Department |
Design Bid Build |
$2,720,490 |
$3,400,000 |
2020 |
Q1 |
2020 |
Q3 |
91 |
Remaining Small Diameter CI Water Ph2 |
B16023 |
Public Utilities Department |
Design Bid Build |
$7,779,750 |
$11,312,800 |
2020 |
Q1 |
2020 |
Q2 |
92 |
Sewer & AC Water Crown Point West (S) |
B16145 |
Public Utilities Department |
Design Bid Build |
$10,436,000 |
$17,438,691 |
2020 |
Q1 |
2020 |
Q2 |
93 |
Sewer & AC Water Crown Point West (W) |
B16144 |
Public Utilities Department |
Design Bid Build |
$6,403,000 |
$8,586,547 |
2020 |
Q1 |
2020 |
Q2 |
94 |
Sewer & AC Water Group 841(S) |
B16037 |
Public Utilities Department |
Design Bid Build |
$1,007,342 |
$1,464,842 |
2020 |
Q1 |
2020 |
Q3 |
95 |
Sewer & AC Water Group 841(W) |
B18072 |
Public Utilities Department |
Design Bid Build |
$947,528 |
$1,702,028 |
2020 |
Q1 |
2020 |
Q3 |
96 |
Sewer and AC Water Group 765 (S) |
B00369 |
Public Utilities Department |
Design Bid Build |
$1,798,516 |
$2,757,630 |
2020 |
Q2 |
2020 |
Q4 |
97 |
Sewer and AC Water Group 765 (W) |
B17167 |
Public Utilities Department |
Design Bid Build |
$1,754,818 |
$2,589,260 |
2020 |
Q2 |
2020 |
Q4 |
98 |
SEWER GJ 798C |
B00409 |
Public Utilities Department |
Design Bid Build |
$212,420 |
$484,380 |
2020 |
Q2 |
2020 |
Q3 |
99 |
Sewer Group 806 |
B00406 |
Public Utilities Department |
Design Bid Build |
$1,224,989 |
$1,941,558 |
2020 |
Q2 |
2020 |
Q4 |
100 |
South Mission Beach GI |
B18118 |
Public Utilities Department |
Design Bid Build |
$2,000,000 |
$2,796,000 |
2020 |
Q3 |
2020 |
Q4 |
101 |
South Mission Beach Storm Drain Replacement |
B18117 |
Public Utilities Department |
Design Bid Build |
$8,000,000 |
$10,000,000 |
2020 |
Q3 |
2020 |
Q4 |
102 |
Ultraviolet Disinfection System Replace |
B18031 |
Public Utilities Department |
Design Bid Build |
$3,391,636 |
$4,520,000 |
2019 |
Q3 |
2020 |
Q1 |
103 |
Water Group 968 |
B14099 |
Public Utilities Department |
Design Bid Build |
$2,152,300 |
$3,167,500 |
2020 |
Q3 |
2020 |
Q4 |
104 |
Water Group 970 CI |
B18075 |
Public Utilities Department |
Design Bid Build |
$4,500,000 |
$5,500,000 |
2020 |
Q1 |
2020 |
Q3 |
105 |
25th (SB) Street UUP (Coronado-SB to Gro |
B15088 |
Transportation & Storm Water Department |
Job Order Contract |
$30,600 |
$36,000 |
2019 |
Q4 |
2020 |
Q1 |
106 |
31st Street UUD (Market St - L St) |
B13143 |
Transportation & Storm Water Department |
Job Order Contract |
$14,000 |
$18,000 |
2019 |
Q4 |
2020 |
Q1 |
107 |
32nd & Norman Scott Rd TS Upgrade |
B15005 |
Transportation & Storm Water Department |
Job Order Contract |
$320,000 |
$475,000 |
2019 |
Q4 |
2020 |
Q1 |
108 |
70th-Alvarado to Saranac-Sidewalk |
B17065 |
Transportation & Storm Water Department |
Design Bid Build |
$275,000 |
$720,701 |
2019 |
Q3 |
2020 |
Q2 |
109 |
Abbot Street Series Circuit |
B17145 |
Transportation & Storm Water Department |
Design Bid Build |
$275,000 |
$422,500 |
2020 |
Q2 |
2020 |
Q3 |
110 |
ADA APS GROUP 2E - Washington St |
B16099 |
Transportation & Storm Water Department |
Job Order Contract |
$349,622 |
$488,664 |
2019 |
Q4 |
2020 |
Q1 |
111 |
ADA Curb Ramp Winder and McKee |
B16108 |
Transportation & Storm Water Department |
Design Bid Build |
$363,300 |
$649,000 |
2020 |
Q2 |
2020 |
Q4 |
112 |
ADA SW Group 4E College |
B16107 |
Transportation & Storm Water Department |
Design Bid Build |
$1,205,000 |
$1,736,000 |
2020 |
Q1 |
2020 |
Q3 |
113 |
ADACA Crown Point Missing Sidewalks GF 16 |
B16095 |
Transportation & Storm Water Department |
Design Bid Build |
$577,500 |
$921,000 |
2019 |
Q4 |
2020 |
Q1 |
114 |
Adams Ave & 49th St Splitter Islands |
B17025 |
Transportation & Storm Water Department |
Design Bid Build |
$263,650 |
$584,000 |
2020 |
Q2 |
2020 |
Q4 |
115 |
Alamo, Salvation, 68th Street Basins LID |
B14120 |
Transportation & Storm Water Department |
Design Bid Build |
$2,334,726 |
$3,342,392 |
2020 |
Q1 |
2020 |
Q2 |
116 |
Ashley Falls Lg Scale Storm Flow Storage |
B14007 |
Transportation & Storm Water Department |
Design Bid Build |
$761,567 |
$1,700,000 |
2019 |
Q3 |
2020 |
Q1 |
117 |
Asphalt Resurfacing Group 1702 (Option C |
B17095 |
Transportation & Storm Water Department |
Design Bid Build |
$4,756,087 |
$5,500,000 |
2019 |
Q4 |
2020 |
Q1 |
118 |
Baker St/Shawnee Rd UUP (Morena to Shawn |
B15090 |
Transportation & Storm Water Department |
Job Order Contract |
$91,800 |
$108,000 |
2020 |
Q1 |
2020 |
Q2 |
119 |
Bernardo Hts Py @ Calle Pueblito TS |
B17018 |
Transportation & Storm Water Department |
Design Bid Build |
$319,600 |
$438,100 |
2020 |
Q1 |
2020 |
Q2 |
120 |
Beyer Bl @ Smythe Ave Traffic Signal |
B14015 |
Transportation & Storm Water Department |
Job Order Contract |
$414,900 |
$500,000 |
2019 |
Q3 |
2020 |
Q3 |
121 |
Block 4-J1 UUD (Mid City) |
B13152 |
Transportation & Storm Water Department |
Job Order Contract |
$324,000 |
$405,000 |
2019 |
Q4 |
2020 |
Q1 |
122 |
Block 4Y UUP - CIP |
B15087 |
Transportation & Storm Water Department |
Design Bid Build |
$564,000 |
$733,200 |
2019 |
Q4 |
2020 |
Q2 |
123 |
Block 6H UUP |
B15086 |
Transportation & Storm Water Department |
Job Order Contract |
$359,550 |
$423,000 |
2020 |
Q1 |
2020 |
Q2 |
124 |
Block 8C UUD (Greater Golden Hill) |
B13155 |
Transportation & Storm Water Department |
Job Order Contract |
$480,000 |
$680,000 |
2020 |
Q2 |
2020 |
Q3 |
125 |
Block 8R UUP - CIP |
B15097 |
Transportation & Storm Water Department |
Design Bid Build |
$500,000 |
$650,000 |
2020 |
Q1 |
2020 |
Q2 |
126 |
Cass St (Grand-Pacific) SL UU143 - 6 lights |
B17007 |
Transportation & Storm Water Department |
Job Order Contract |
$64,800 |
$72,000 |
2019 |
Q4 |
2020 |
Q1 |
127 |
Citywide Street Lights 1950 |
B19125 |
Transportation & Storm Water Department |
Design Bid Build |
$1,365,000 |
$1,570,000 |
2020 |
Q2 |
2020 |
Q2 |
128 |
Citywide Street Lights Group 1601 |
B16007 |
Transportation & Storm Water Department |
Design Bid Build |
$363,620 |
$500,000 |
2019 |
Q3 |
2020 |
Q2 |
129 |
Citywide Street Lights Group 1602 |
B16008 |
Transportation & Storm Water Department |
Design Bid Build |
$363,620 |
$500,000 |
2019 |
Q3 |
2020 |
Q2 |
130 |
Concrete Panel Replacement Group 1940 |
B19002 |
Transportation & Storm Water Department |
Design Bid Build |
$4,025,000 |
$5,025,000 |
2020 |
Q2 |
2020 |
Q2 |
131 |
Coronado SB (27th-Madden) SL UU193 - 5 lights |
B17008 |
Transportation & Storm Water Department |
Job Order Contract |
$54,000 |
$60,000 |
2020 |
Q1 |
2020 |
Q2 |
132 |
Curb Ramp improvement Group 1701 |
B17114 |
Transportation & Storm Water Department |
Design Bid Build |
$3,138,800 |
$4,137,600 |
2020 |
Q3 |
2020 |
Q4 |
133 |
District 1 Block 1-J UUD |
B00836 |
Transportation & Storm Water Department |
Job Order Contract |
$137,536 |
$161,808 |
2020 |
Q1 |
2020 |
Q2 |
134 |
Downtown Complete St Impl Phase 2 |
B19143 |
Transportation & Storm Water Department |
Design Bid Build |
$2,500,000 |
$3,375,000 |
2020 |
Q1 |
2020 |
Q3 |
135 |
Downtown Complete Streets Implementation |
B17056 |
Transportation & Storm Water Department |
Design Bid Build |
$2,500,000 |
$3,375,000 |
2019 |
Q4 |
2020 |
Q2 |
136 |
Fanuel St III (Grand-PB Dr) Rd Imp UU188 |
B17071 |
Transportation & Storm Water Department |
Job Order Contract |
$106,912 |
$144,329 |
2020 |
Q2 |
2020 |
Q3 |
137 |
Fanuel St PI Archer to Tourmaline UUD |
B00721 |
Transportation & Storm Water Department |
Job Order Contract |
$69,740 |
$82,047 |
2020 |
Q1 |
2020 |
Q2 |
138 |
Golfcrest(Jackson-Wandermere)Rd ImpUU584 |
B18149 |
Transportation & Storm Water Department |
Job Order Contract |
$221,987 |
$299,682 |
2020 |
Q2 |
2020 |
Q3 |
139 |
Highland & Monroe Aves Storm Drain Repl |
B12096 |
Transportation & Storm Water Department |
Design Bid Build |
$2,000,000 |
$2,500,000 |
2020 |
Q2 |
2020 |
Q3 |
140 |
Hilltop PH I(Boundary-Toyne)Rd Imp UU617 |
B18153 |
Transportation & Storm Water Department |
Job Order Contract |
$235,393 |
$317,781 |
2020 |
Q2 |
2020 |
Q3 |
141 |
Howard PHI-II(Park-Texas) Rd Imp UU71-72 |
B18136 |
Transportation & Storm Water Department |
Job Order Contract |
$367,070 |
$488,202 |
2020 |
Q2 |
2020 |
Q3 |
142 |
Hughes St (58th St-Jodi St) SL UU101 - 11 lights |
B17010 |
Transportation & Storm Water Department |
Job Order Contract |
$118,800 |
$132,000 |
2020 |
Q1 |
2020 |
Q2 |
143 |
India St at West Palm St Hybrid Beacon |
B17100 |
Transportation & Storm Water Department |
Design Bid Build |
$237,500 |
$395,400 |
2020 |
Q2 |
2020 |
Q4 |
144 |
Logan Heights LID (South) |
B15051 |
Transportation & Storm Water Department |
Design Bid Build |
$3,000,000 |
$4,316,000 |
2020 |
Q1 |
2020 |
Q3 |
145 |
Loma Palisades SL Series Circuit Conv |
B16118 |
Transportation & Storm Water Department |
Design Bid Build |
$824,800 |
$1,297,000 |
2020 |
Q2 |
2020 |
Q4 |
146 |
Manzana Storm Drain Replacement |
B17079 |
Transportation & Storm Water Department |
Design Bid Build |
$853,000 |
$1,250,000 |
2019 |
Q3 |
2020 |
Q1 |
147 |
Market St-47th ST to Euclid Complete St |
S16061 |
Transportation & Storm Water Department |
Design Bid Build |
$6,497,000 |
$9,781,000 |
2020 |
Q1 |
2020 |
Q3 |
148 |
Mira Mesa South Storm Drain Replacement |
B16175 |
Transportation & Storm Water Department |
Design Bid Build |
$810,000 |
$1,200,000 |
2020 |
Q1 |
2020 |
Q2 |
149 |
Miramar Road I-805 Easterly Ramps |
S00880 |
Transportation & Storm Water Department |
Design Bid Build |
$1,275,603 |
$6,061,627 |
2019 |
Q3 |
2020 |
Q1 |
150 |
Mission Bl(Loring-Turquoise) Rd Imp UU30 |
B18140 |
Transportation & Storm Water Department |
Job Order Contract |
$372,323 |
$495,190 |
2020 |
Q2 |
2020 |
Q3 |
151 |
Nimitz Bridge at NTC Rehabilitation |
B15198 |
Transportation & Storm Water Department |
Design Bid Build |
$653,000 |
$1,021,600 |
2020 |
Q1 |
2020 |
Q3 |
152 |
Off FHWA System Bridge Rehabilitation |
B15127 |
Transportation & Storm Water Department |
Design Bid Build |
$265,233 |
$492,063 |
2019 |
Q2 |
2020 |
Q2 |
153 |
On System Bridge Rehabilitation |
B15128 |
Transportation & Storm Water Department |
Design Bid Build |
$1,686,909 |
$2,301,072 |
2019 |
Q2 |
2020 |
Q2 |
154 |
Otay Mesa Truck Route Phase 4 |
S11060 |
Transportation & Storm Water Department |
Design Bid Build |
$7,155,174 |
$14,600,000 |
2020 |
Q1 |
2020 |
Q4 |
155 |
Palm Avenue Storm Drain Replacement |
B17163 |
Transportation & Storm Water Department |
Design Bid Build |
$300,000 |
$530,434 |
2020 |
Q1 |
2020 |
Q2 |
156 |
Plumosa Park Series Circuit |
B17101 |
Transportation & Storm Water Department |
Design Bid Build |
$765,000 |
$1,100,000 |
2020 |
Q3 |
2020 |
Q4 |
157 |
Regional Arterial Guardrail Group 2 |
B17155 |
Transportation & Storm Water Department |
Job Order Contract |
$256,612 |
$381,800 |
2020 |
Q2 |
2020 |
Q2 |
158 |
San Vicente PH I-II Rd Imp UU505-UU506 |
B17098 |
Transportation & Storm Water Department |
Job Order Contract |
$359,482 |
$485,301 |
2020 |
Q2 |
2020 |
Q3 |
159 |
Seminole Drive UUP (Stanley to Estelle) |
B15093 |
Transportation & Storm Water Department |
Design Bid Build |
$38,250 |
$45,000 |
2019 |
Q4 |
2020 |
Q1 |
160 |
Sidewalk Replacement Group 1604 |
B16030 |
Transportation & Storm Water Department |
Design Bid Build |
$820,594 |
$1,418,000 |
2019 |
Q4 |
2020 |
Q1 |
161 |
Sidewalk Replacement Group 1901-NP & OB |
B19012 |
Transportation & Storm Water Department |
Design Bid Build |
$1,450,000 |
$1,643,215 |
2020 |
Q1 |
2020 |
Q2 |
162 |
Sidewalk Replacement Group 1902-CM & LJ |
B19013 |
Transportation & Storm Water Department |
Design Bid Build |
$1,450,000 |
$1,648,793 |
2020 |
Q2 |
2020 |
Q3 |
163 |
Sidewalk Replacement Group 1903-SE & CH |
B19014 |
Transportation & Storm Water Department |
Design Bid Build |
$1,450,000 |
$1,649,007 |
2020 |
Q3 |
2020 |
Q4 |
164 |
SP17 JOC North Task 1 - Scripps Poway Parkway |
B19007 |
Transportation & Storm Water Department |
Job Order Contract |
$5,000,000 |
$5,500,000 |
2019 |
Q4 |
2020 |
Q1 |
165 |
SP17 JOC North Task 2 - Pomerado/Poway Rd/Clairemont |
B19007 |
Transportation & Storm Water Department |
Job Order Contract |
$5,000,000 |
$5,500,000 |
2020 |
Q1 |
2020 |
Q2 |
166 |
SP17 JOC South Task 1 - Fairmount Ave/Montezuma |
B19008 |
Transportation & Storm Water Department |
Job Order Contract |
$5,000,000 |
$5,500,000 |
2019 |
Q4 |
2020 |
Q1 |
167 |
SP17 JOC South Task 2 - Harbor Dr/Picador |
B19008 |
Transportation & Storm Water Department |
Job Order Contract |
$5,000,000 |
$5,500,000 |
2020 |
Q1 |
2020 |
Q2 |
168 |
Storm Drain Group 968 |
B15028 |
Transportation & Storm Water Department |
Design Bid Build |
$131,000 |
$281,000 |
2020 |
Q3 |
2020 |
Q4 |
169 |
Street Paving Group 1901 |
B18134 |
Transportation & Storm Water Department |
Design Bid Build |
$11,000,000 |
$12,550,000 |
2020 |
Q2 |
2020 |
Q2 |
170 |
Street Paving Group 1902 |
B18135 |
Transportation & Storm Water Department |
Design Bid Build |
$11,000,000 |
$12,550,000 |
2020 |
Q2 |
2020 |
Q2 |
171 |
Street Paving Group 1903 |
B19211 |
Transportation & Storm Water Department |
Design Bid Build |
$11,000,000 |
$12,550,000 |
2020 |
Q2 |
2020 |
Q3 |
172 |
Street Resurfacing Mission Bay |
B19195 |
Transportation & Storm Water Department |
Design Bid Build |
$5,000,000 |
$6,500,000 |
2020 |
Q2 |
2020 |
Q3 |
173 |
University Avenue Mobility |
S00915 |
Transportation & Storm Water Department |
Design Bid Build |
$4,000,000 |
$7,430,000 |
2020 |
Q1 |
2020 |
Q2 |
174 |
Wightman (Chamoune -Euclid) Rd Imp UU388 |
B18138 |
Transportation & Storm Water Department |
Job Order Contract |
$152,383 |
$202,669 |
2020 |
Q2 |
2020 |
Q3 |