1 |
Sewer & AC Water Group 794 (S) |
B00395 |
Public Utilities |
Design Bid Build |
$6,263,573 |
$9,031,869 |
FY23 |
Q1 |
FY23 |
Q3 |
2 |
Sewer Group 806 |
B00406 |
Public Utilities |
Design Bid Build |
$1,224,989 |
$1,941,558 |
FY23 |
Q1 |
FY23 |
Q4 |
3 |
Bannock Ave Streetscape Enhancements |
B10027 |
Stormwater |
Design Bid Build |
$2,349,225 |
$4,311,965 |
FY23 |
Q1 |
FY23 |
Q3 |
4 |
Water Group Job 952 |
B11048 |
Public Utilities |
Design Bid Build |
$8,600,407 |
$11,080,627 |
FY23 |
Q1 |
FY23 |
Q2 |
5 |
Maple Canyon Restoration - Phases 1 & 2 |
B12040 |
Stormwater |
Design Bid Build |
$9,504,293 |
$16,876,997 |
FY23 |
Q1 |
FY23 |
Q3 |
6 |
Highland & Monroe Aves Storm Drain Repl |
B12096 |
Stormwater |
Design Bid Build |
$1,930,000 |
$3,908,645 |
FY23 |
Q1 |
FY23 |
Q3 |
7 |
Signal Mods in Barrio Logan |
B13010 |
Transportation |
Design Bid Build |
$509,000 |
$698,400 |
FY23 |
Q2 |
FY23 |
Q3 |
8 |
Sewer Group 836 |
B13232 |
Public Utilities |
Design Bid Build |
$4,500,000 |
$8,636,485 |
FY23 |
Q2 |
FY23 |
Q4 |
9 |
31st St & Market St School Traffic Sgnal |
B15014 |
Transportation |
Design Bid Build |
$438,900 |
$777,000 |
FY23 |
Q1 |
FY23 |
Q3 |
10 |
Morena Bl & W. Bernardo Medians |
B15015 |
Transportation |
Multiple |
$213,500 |
$433,261 |
FY23 |
Q1 |
FY23 |
Q3 |
11 |
Logan Heights LID (South) |
B15051 |
Stormwater |
Design Bid Build |
$3,705,000 |
$5,700,000 |
FY23 |
Q1 |
FY23 |
Q3 |
12 |
Pacific Beach TS Interconnect Upgrade |
B15065 |
Transportation |
Job Order Contract |
$933,030 |
$1,841,619 |
FY23 |
Q3 |
FY23 |
Q3 |
13 |
Morena Conveyance Middle |
B15141.3 |
Public Utilities |
Design Bid Build |
$56,719,052 |
$71,351,280 |
FY22 |
Q2 |
FY23 |
Q1 |
14 |
Morena Conveyance Southern |
B15141.4 |
Public Utilities |
Design Bid Build |
$60,077,353 |
$73,727,680 |
FY22 |
Q2 |
FY23 |
Q1 |
15 |
Tecolote Cyn GC Water Conn |
B15203 |
Public Utilities |
Design Bid Build |
$450,000 |
$525,500 |
FY23 |
Q1 |
FY23 |
Q3 |
16 |
College Areas Swr & AC Wtr Main Repl (W) |
B16022 |
Public Utilities |
Design Bid Build |
$1,438,500 |
$1,990,000 |
FY22 |
Q3 |
FY23 |
Q1 |
17 |
College Areas Swr & AC Wtr Main Repl (S) |
B16025 |
Public Utilities |
Design Bid Build |
$11,974,030 |
$13,036,155 |
FY22 |
Q3 |
FY23 |
Q1 |
18 |
Sewer & AC Water Group 794 (W) |
B16041 |
Public Utilities |
Design Bid Build |
$2,750,698 |
$3,031,698 |
FY23 |
Q1 |
FY23 |
Q2 |
19 |
Southcrest Green Infrastructure (GI) |
B16112 |
Stormwater |
Design Bid Build |
$2,646,000 |
$4,000,000 |
FY23 |
Q1 |
FY23 |
Q3 |
20 |
Mira Mesa South Storm Drain Replacement |
B16175 |
Stormwater |
Design Bid Build |
$604,000 |
$1,495,000 |
FY22 |
Q4 |
FY23 |
Q2 |
21 |
Murphy Canyon Trunk Sewer Repair/Rehab |
B17005 |
Public Utilities |
Design Bid Build |
$29,600,000 |
$39,072,000 |
FY23 |
Q1 |
FY23 |
Q3 |
22 |
Citywide Street Lights Group 1701 |
B17050 |
Transportation |
Design Bid Build |
$419,500 |
$705,600 |
FY21 |
Q4 |
FY23 |
Q2 |
23 |
Citywide Street Lights Group 1702 |
B17051 |
Transportation |
Design Bid Build |
$458,844 |
$749,144 |
FY21 |
Q4 |
FY23 |
Q1 |
24 |
70th-Alvarado to Saranac-Sidewalk |
B17065 |
Transportation |
Design Bid Build |
$304,425 |
$647,825 |
FY23 |
Q1 |
FY23 |
Q2 |
25 |
Fanuel St III (Grand-PB Dr) Rd Imp UU188 |
B17071 |
Transportation |
Design Bid Build |
$167,553 |
$390,064 |
FY23 |
Q1 |
FY23 |
Q3 |
26 |
San Vicente PH I-II Rd Imp UU505-UU506 |
B17098 |
Transportation |
Design Bid Build |
$829,053 |
$1,175,516 |
FY23 |
Q1 |
FY23 |
Q3 |
27 |
North Park Mini Park Ped Improvements |
B17102 |
Transportation |
Design Bid Build |
$1,897,373 |
$2,995,600 |
FY23 |
Q1 |
FY23 |
Q3 |
28 |
Kensington Hts #2 Series Circuit Upgrade |
B17146 |
Transportation |
Design Bid Build |
$2,321,000 |
$2,800,000 |
FY23 |
Q1 |
FY23 |
Q1 |
29 |
Street Reconstruction Group 1801 |
B17188 |
Transportation |
Design Bid Build |
$8,200,000 |
$12,710,000 |
FY23 |
Q1 |
FY23 |
Q3 |
30 |
Miramar PS Improvement |
B17190 |
Public Utilities |
Design Bid Build |
$9,024,353 |
$14,621,623 |
FY22 |
Q3 |
FY23 |
Q1 |
31 |
John F Kennedy Neighborhood Park Improve |
B18005 |
Parks & Recreation |
Design Bid Build |
$1,859,668 |
$3,802,774 |
FY23 |
Q1 |
FY23 |
Q3 |
32 |
Foothill Blvd & Loring St Roundabout |
B18008 |
Transportation |
Design Bid Build |
$1,823,563 |
$2,859,700 |
FY23 |
Q1 |
FY23 |
Q3 |
33 |
Citywide Street Lights Group 1801 |
B18012 |
Transportation |
Design Bid Build |
$162,762 |
$250,000 |
FY23 |
Q1 |
FY23 |
Q3 |
34 |
Howard Ave-Village Pine to Iris Sidewalk |
B18019 |
Transportation |
Design Bid Build |
$380,000 |
$1,135,060 |
FY23 |
Q1 |
FY23 |
Q1 |
35 |
MYF Electrical System Upgrade |
B18034 |
Airports |
Design Bid Build |
$864,846 |
$1,190,062 |
FY22 |
Q1 |
FY23 |
Q2 |
36 |
ADA Mid-City MS TSW-1 |
B18054 |
Transportation |
Design Bid Build |
$873,000 |
$1,362,800 |
FY23 |
Q1 |
FY23 |
Q3 |
37 |
ADA Torrey Pines APS PROW-S25 |
B18061 |
Transportation |
Design Bid Build |
$122,094 |
$322,933 |
FY22 |
Q4 |
FY23 |
Q1 |
38 |
AC Water & Sewer Group 1040 (S) |
B18066 |
Public Utilities |
Design Bid Build |
$1,568,500 |
$2,278,800 |
FY23 |
Q2 |
FY23 |
Q4 |
39 |
AC Water & Sewer Group 1040 (W) |
B18068 |
Public Utilities |
Design Bid Build |
$5,050,700 |
$7,539,300 |
FY23 |
Q2 |
FY23 |
Q4 |
40 |
Sewer & AC Water Group 765A (W) |
B18071 |
Public Utilities |
Design Bid Build |
$7,018,230 |
$9,260,223 |
FY22 |
Q4 |
FY23 |
Q2 |
41 |
Sewer & AC Water Group 765A (S) |
B18073 |
Public Utilities |
Design Bid Build |
$7,018,230 |
$9,232,230 |
FY23 |
Q1 |
FY23 |
Q2 |
42 |
AC Water & Sewer Group 1048 (W) |
B18088 |
Public Utilities |
Design Bid Build |
$1,231,700 |
$1,806,500 |
FY23 |
Q1 |
FY23 |
Q3 |
43 |
AC Water & Sewer Group 1048 (S) |
B18095 |
Public Utilities |
Design Bid Build |
$4,537,800 |
$6,655,500 |
FY23 |
Q1 |
FY23 |
Q3 |
44 |
Asphalt Resurfacing Group 1901 |
B18134 |
Transportation |
Design Bid Build |
$9,053,597 |
$12,566,636 |
FY22 |
Q3 |
FY23 |
Q1 |
45 |
Howard PHI-II(Park-Texas) Rd Imp UU71-72 |
B18136 |
Transportation |
Design Bid Build |
$351,052 |
$736,105 |
FY23 |
Q1 |
FY23 |
Q3 |
46 |
Coronado SB (27th SB-Madden)Rd Imp UU193 |
B18137 |
Transportation |
Design Bid Build |
$451,500 |
$636,146 |
FY23 |
Q1 |
FY23 |
Q3 |
47 |
Wightman (Chamoune -Euclid) Rd Imp UU388 |
B18138 |
Transportation |
Design Bid Build |
$430,964 |
$674,512 |
FY23 |
Q1 |
FY23 |
Q3 |
48 |
Mission Bl(Loring-Turquoise) Rd Imp UU30 |
B18140 |
Transportation |
Design Bid Build |
$928,763 |
$1,249,201 |
FY23 |
Q1 |
FY23 |
Q3 |
49 |
32nd St PHII (Market-Imp.) Rd Imp UU17 |
B18141 |
Transportation |
Design Bid Build |
$630,000 |
$910,450 |
FY23 |
Q1 |
FY23 |
Q3 |
50 |
Block 6DD1 (Clairemont Mesa)Rd Imp UU410 |
B18142 |
Transportation |
Design Bid Build |
$1,475,215 |
$1,959,764 |
FY23 |
Q1 |
FY23 |
Q3 |
51 |
32nd St PH I (Market-F St) Rd Imp UU386 |
B18144 |
Transportation |
Design Bid Build |
$288,750 |
$435,346 |
FY23 |
Q1 |
FY23 |
Q3 |
52 |
31st Street (Market-L St) Rd Imp UU11 |
B18147 |
Transportation |
Design Bid Build |
$614,250 |
$890,846 |
FY23 |
Q1 |
FY23 |
Q3 |
53 |
Cass (Grand-Pacific Bch Dr) Rd Imp UU143 |
B18148 |
Transportation |
Design Bid Build |
$603,750 |
$815,674 |
FY23 |
Q1 |
FY23 |
Q3 |
54 |
Golfcrest(Jackson-Wandermere)Rd ImpUU584 |
B18149 |
Transportation |
Design Bid Build |
$335,328 |
$546,046 |
FY23 |
Q1 |
FY23 |
Q3 |
55 |
25th (SB) (Coronado-Grove) Rd Imp UU995 |
B18150 |
Transportation |
Design Bid Build |
$165,000 |
$287,463 |
FY23 |
Q1 |
FY23 |
Q3 |
56 |
Hughes St (58th St-Jodi St) Rd Imp UU101 |
B18151 |
Transportation |
Design Bid Build |
$509,250 |
$738,463 |
FY23 |
Q1 |
FY23 |
Q3 |
57 |
Hilltop PH I(Boundary-Toyne)Rd Imp UU617 |
B18153 |
Transportation |
Design Bid Build |
$460,701 |
$699,035 |
FY23 |
Q1 |
FY23 |
Q3 |
58 |
Block 1M (La Jolla 4) Rd Imp UU659_RP |
B18155 |
Transportation |
Design Bid Build |
$1,292,380 |
$1,787,182 |
FY23 |
Q1 |
FY23 |
Q3 |
59 |
54th-Market to Santa Margarita Sidwlk |
B18158 |
Transportation |
Design Bid Build |
$559,900 |
$1,068,600 |
FY23 |
Q1 |
FY23 |
Q3 |
60 |
Mountain View Sports Courts |
B18192 |
Parks & Recreation |
Job Order Contract |
$900,000 |
$2,005,000 |
FY21 |
Q1 |
FY23 |
Q1 |
61 |
Scripps Ranch Improv 1 (S) |
B18204 |
Public Utilities |
Design Bid Build |
$2,035,300 |
$3,052,500 |
FY22 |
Q4 |
FY23 |
Q2 |
62 |
Scripps Ranch Improv 1 (W) |
B18208 |
Public Utilities |
Design Bid Build |
$2,313,800 |
$3,517,000 |
FY22 |
Q4 |
FY23 |
Q2 |
63 |
DeAnza North Parking Lot Improvements |
B18220 |
Parks & Recreation |
Design Bid Build |
$914,610 |
$1,450,802 |
FY22 |
Q3 |
FY23 |
Q2 |
64 |
North Cove Comfort Station Imp |
B18234 |
Parks & Recreation |
Design Bid Build |
$1,378,334 |
$2,300,000 |
FY23 |
Q1 |
FY23 |
Q2 |
65 |
MLK Rec Center Moisture Intrusion |
B19001 |
Parks & Recreation |
Design Bid Build |
$1,020,093 |
$2,515,168 |
FY21 |
Q1 |
FY23 |
Q2 |
66 |
Sidewalk Replacement Group 1902-CM & LJ |
B19013 |
Transportation |
Design Bid Build |
$2,790,000 |
$4,165,315 |
FY23 |
Q1 |
FY23 |
Q3 |
67 |
Sidewalk Replacement Group 1903-SE & CH |
B19014 |
Transportation |
Design Bid Build |
$1,240,000 |
$1,809,007 |
FY23 |
Q1 |
FY23 |
Q4 |
68 |
Morena Improv1 (S) |
B19025 |
Public Utilities |
Design Bid Build |
$2,935,420 |
$4,486,811 |
FY23 |
Q2 |
FY23 |
Q4 |
69 |
Morena Improv 1 (W) |
B19028 |
Public Utilities |
Design Bid Build |
$6,277,458 |
$8,585,196 |
FY23 |
Q2 |
FY23 |
Q4 |
70 |
Camino Del Rio West & Moore St Median |
B19049 |
Transportation |
Design Bid Build |
$1,189,000 |
$1,828,200 |
FY23 |
Q1 |
FY23 |
Q3 |
71 |
Citywide Street Lights 1901 |
B19052 |
Transportation |
Design Bid Build |
$124,310 |
$285,461 |
FY23 |
Q2 |
FY23 |
Q3 |
72 |
Aquarius & Camino Ruiz Traff. Signal |
B19057 |
Transportation |
Design Bid Build |
$299,000 |
$499,400 |
FY23 |
Q2 |
FY23 |
Q3 |
73 |
Accelerated Sewer Referral Group 851 |
B19063 |
Public Utilities |
Design Bid Build |
$4,900,773 |
$6,217,408 |
FY23 |
Q2 |
FY23 |
Q4 |
74 |
Traffic Signal Mods Grp 19-02 |
B19071 |
Transportation |
Design Bid Build |
$380,350 |
$700,000 |
FY23 |
Q1 |
FY23 |
Q3 |
75 |
Castle Neighborhood New Streetlights |
B19080 |
Transportation |
Design Bid Build |
$375,500 |
$549,965 |
FY23 |
Q2 |
FY23 |
Q3 |
76 |
Miramar Reservoir PS New Generator & Upg |
B19099 |
Public Utilities |
Design Bid Build |
$2,660,874 |
$4,235,874 |
FY22 |
Q3 |
FY23 |
Q1 |
77 |
La Jolla Improv 2 (S) |
B19105 |
Public Utilities |
Design Bid Build |
$2,766,300 |
$4,161,700 |
FY23 |
Q2 |
FY23 |
Q4 |
78 |
La Jolla Improv 2 (W) |
B19117 |
Public Utilities |
Design Bid Build |
$5,732,500 |
$8,268,200 |
FY23 |
Q2 |
FY23 |
Q4 |
79 |
La Jolla Improv 1 (W) |
B19120 |
Public Utilities |
Design Bid Build |
$5,083,600 |
$7,492,800 |
FY23 |
Q2 |
FY23 |
Q3 |
80 |
Citywide Street Lights 1950 |
B19125 |
Transportation |
Job Order Contract |
$2,546,731 |
$2,936,226 |
FY23 |
Q1 |
FY23 |
Q1 |
81 |
Bay Ho Improv 3 (W) |
B19134 |
Public Utilities |
Design Build |
$2,820,200 |
$3,869,500 |
FY23 |
Q3 |
FY23 |
Q4 |
82 |
Lake Murray Improv 2 (W) |
B19135 |
Public Utilities |
Design Bid Build |
$10,200,000 |
$13,228,375 |
FY23 |
Q2 |
FY23 |
Q4 |
83 |
Redwood Village/Rolando Park Improv 1(S) |
B19139 |
Public Utilities |
Design Bid Build |
$3,470,636 |
$4,723,636 |
FY23 |
Q2 |
FY23 |
Q4 |
84 |
Lake Murray Improv 2 (S) |
B19140 |
Public Utilities |
Design Bid Build |
$400,000 |
$743,738 |
FY23 |
Q2 |
FY23 |
Q4 |
85 |
Redwood Village/Rolando Park Improv 1(W) |
B19141 |
Public Utilities |
Design Bid Build |
$3,913,000 |
$5,234,000 |
FY23 |
Q2 |
FY23 |
Q4 |
86 |
Downtown Complete St Impl Phase 3A1 |
B19144 |
Transportation |
Design Bid Build |
$3,530,000 |
$5,500,000 |
FY23 |
Q1 |
FY23 |
Q2 |
87 |
Sewer & AC Water Group 793A (S) |
B19155 |
Public Utilities |
Design Bid Build |
$4,877,200 |
$7,153,300 |
FY23 |
Q2 |
FY23 |
Q4 |
88 |
Sewer & AC Water Group 793A (W) |
B19160 |
Public Utilities |
Design Bid Build |
$1,705,700 |
$2,501,700 |
FY23 |
Q2 |
FY23 |
Q4 |
89 |
Hospitality Point Comfort Station Imp |
B19179 |
Parks & Recreation |
Design Bid Build |
$1,245,500 |
$2,235,000 |
FY23 |
Q1 |
FY23 |
Q3 |
90 |
Mission Valley West Improv 1 (W) |
B19196 |
Public Utilities |
Design Bid Build |
$5,249,300 |
$7,970,300 |
FY23 |
Q2 |
FY23 |
Q4 |
91 |
STORM DRAIN DIVERSION AT THE MBC |
B19197 |
Public Utilities |
Design Bid Build |
$6,500,000 |
$7,721,000 |
FY22 |
Q4 |
FY23 |
Q3 |
92 |
AC Water and Sewer Group 1023B (S) |
B19204 |
Public Utilities |
Design Bid Build |
$200,000 |
$326,000 |
FY23 |
Q2 |
FY23 |
Q4 |
93 |
AC Water and Sewer Group 1023B (W) |
B19205 |
Public Utilities |
Design Bid Build |
$2,000,000 |
$2,941,000 |
FY23 |
Q2 |
FY23 |
Q4 |
94 |
Mission Valley West Improv 1 (S) |
B19206 |
Public Utilities |
Design Bid Build |
$425,400 |
$631,700 |
FY23 |
Q1 |
FY23 |
Q4 |
95 |
STORM WATER DIVERSION AT THE SBWRP |
B20002 |
Public Utilities |
Design Bid Build |
$2,537,900 |
$3,908,100 |
FY22 |
Q4 |
FY23 |
Q1 |
96 |
Clairemont Mesa East Improv 2 (S) |
B20004 |
Public Utilities |
Design Bid Build |
$843,931 |
$1,023,931 |
FY23 |
Q1 |
FY23 |
Q3 |
97 |
Clairemont Mesa East Improv 2 (W) |
B20005 |
Public Utilities |
Design Bid Build |
$16,034,612 |
$19,093,281 |
FY23 |
Q1 |
FY23 |
Q2 |
98 |
Miramar Valves Replacement |
B20015 |
Public Utilities |
Job Order Contract |
$721,267 |
$1,398,500 |
FY23 |
Q1 |
FY23 |
Q1 |
99 |
Paradise Hills Improv 1 (S) |
B20024 |
Public Utilities |
Design Bid Build |
$2,986,536 |
$4,403,200 |
FY23 |
Q1 |
FY23 |
Q2 |
100 |
Paradise Hills Improv 1 (W) |
B20025 |
Public Utilities |
Design Bid Build |
$1,341,364 |
$1,880,900 |
FY23 |
Q1 |
FY23 |
Q2 |
101 |
Clairemont Mesa West Improv 1 (W) |
B20032 |
Public Utilities |
Design Bid Build |
$187,600 |
$309,900 |
FY23 |
Q2 |
FY23 |
Q4 |
102 |
Clairemont Mesa West Improv 1 (S) |
B20033 |
Public Utilities |
Design Bid Build |
$3,334,300 |
$4,768,200 |
FY23 |
Q2 |
FY23 |
Q4 |
103 |
Kellogg Comfort Station Improvements |
B20120 |
General Services |
Job Order Contract |
$79,500 |
$227,855 |
FY22 |
Q4 |
FY23 |
Q1 |
104 |
MBC Gas Detect Syst Replace |
B20121 |
Public Utilities |
Design Bid Build |
$1,980,000 |
$3,049,000 |
FY22 |
Q4 |
FY23 |
Q3 |
105 |
Mountain View Improv 1 |
B20149 |
Public Utilities |
Design Bid Build |
$453,800 |
$720,799 |
FY23 |
Q2 |
FY23 |
Q3 |
106 |
PQPS Oxygenation Sys |
B21001 |
Public Utilities |
Design Bid Build |
$2,575,217 |
$3,617,799 |
FY23 |
Q1 |
FY23 |
Q2 |
107 |
Alvarado WTP Basins Baffle Wall Doors |
B21054 |
Public Utilities |
Job Order Contract |
$116,641 |
$255,800 |
FY22 |
Q2 |
FY23 |
Q1 |
108 |
AC Water Group 1027A |
B21055 |
Public Utilities |
Design Bid Build |
$2,742,060 |
$3,042,060 |
FY22 |
Q4 |
FY23 |
Q2 |
109 |
Morena Improv 3 (S) |
B21064 |
Public Utilities |
Design Build |
$426,684 |
$648,862 |
FY21 |
Q4 |
FY23 |
Q3 |
110 |
Asphalt Overlay Group 2110 |
B21089 |
Transportation |
Design Bid Build |
$9,402,239 |
$12,060,000 |
FY22 |
Q4 |
FY23 |
Q1 |
111 |
Asphalt Overlay Group 2111 |
B21090 |
Transportation |
Design Bid Build |
$6,969,420 |
$9,031,500 |
FY22 |
Q3 |
FY23 |
Q1 |
112 |
Paradise Mesa Crosstie PL CP Improv |
B21110 |
Public Utilities |
Job Order Contract |
$278,400 |
$431,400 |
FY23 |
Q1 |
FY23 |
Q1 |
113 |
PWP Central Facility |
B21151 |
Public Utilities |
Design Bid Build |
$44,200,000 |
$56,120,000 |
FY23 |
Q1 |
FY23 |
Q3 |
114 |
Miramar Place CNG Facility Upgrades |
B22041 |
Environmental Services |
Design Build |
$3,540,000 |
$4,248,000 |
FY23 |
Q1 |
FY23 |
Q3 |
115 |
Landfill Gas Collection System Improvements - South Miramar |
B22079 |
Environmental Services |
Design Build |
$2,000,000 |
$2,500,000 |
FY23 |
Q2 |
FY23 |
Q4 |
116 |
Asphalt Resurfacing Group 1901 (SS) |
B22115 |
Transportation |
Design Bid Build |
$4,328,403 |
$5,922,664 |
FY22 |
Q3 |
FY23 |
Q1 |
117 |
Asphalt Overlay Group 2110 (SS) |
B22116 |
Transportation |
Design Bid Build |
$8,587,520 |
$9,600,000 |
FY22 |
Q4 |
FY23 |
Q1 |
118 |
Asphalt Overlay Group 2111 (SS) |
B22117 |
Transportation |
Design Bid Build |
$4,645,129 |
$5,746,000 |
FY22 |
Q3 |
FY23 |
Q1 |
119 |
2870 Mobley St SD Replacement |
B22153 |
Stormwater |
Job Order Contract |
$1,000,000 |
$1,300,000 |
FY23 |
Q1 |
FY23 |
Q2 |
120 |
Chollas Paint Booth |
L14002.5 |
Fleet Services |
Design Bid Build |
$303,000 |
$666,000 |
FY21 |
Q2 |
FY23 |
Q1 |
121 |
Clay Ave Mini Park |
L16000.5 |
Parks & Recreation |
Design Bid Build |
$943,910 |
$1,857,152 |
FY20 |
Q1 |
FY23 |
Q2 |
122 |
Organics Processing Facility |
L17000.2 |
Environmental Services |
Design Build |
$17,500,000 |
$85,000,000 |
FY22 |
Q3 |
FY23 |
Q2 |
123 |
Miramar Landfill Office Trailers |
L17000.7 |
Environmental Services |
Multiple |
$900,000 |
$1,000,000 |
FY23 |
Q1 |
FY23 |
Q3 |
124 |
Chollas Lake Electrical Upgrade |
L18001.1 |
Parks & Recreation |
Design Bid Build |
$980,530 |
$1,406,530 |
FY23 |
Q1 |
FY23 |
Q1 |
125 |
Miramar Landfill Storm Water Basin Improvements |
L18002.3 |
Environmental Services |
Design Bid Build |
$1,540,800 |
$2,193,000 |
FY22 |
Q4 |
FY23 |
Q1 |
126 |
EMTS Boat Dock Esplanade |
S00319 |
Public Utilities |
Design Bid Build |
$2,160,380 |
$3,430,851 |
FY23 |
Q1 |
FY23 |
Q3 |
127 |
Beyer Park Development |
S00752 |
Parks & Recreation |
Design Bid Build |
$23,906,000 |
$33,636,000 |
FY23 |
Q2 |
FY23 |
Q4 |
128 |
SCRIPPS MIRAMAR RANCH LIB |
S00811 |
Library |
Design Bid Build |
$4,709,105 |
$7,254,384 |
FY23 |
Q1 |
FY23 |
Q3 |
129 |
El Monte Pipeline No. 2 |
S10008 |
Public Utilities |
Design Bid Build |
$15,867,067 |
$24,999,951 |
FY23 |
Q2 |
FY23 |
Q4 |
130 |
Olive St Park Acquisition and Develpment |
S10051 |
Parks & Recreation |
Design Bid Build |
$2,094,200 |
$5,155,585 |
FY23 |
Q1 |
FY23 |
Q3 |
131 |
Montezuma PPL/Mid City Pipeline Ph 2 |
S11026 |
Public Utilities |
Design Bid Build |
$50,507,824 |
$62,870,199 |
FY23 |
Q1 |
FY23 |
Q2 |
132 |
Salk Neighborhood Park & Joint Use Devel |
S14007 |
Parks & Recreation |
Design Bid Build |
$6,567,888 |
$8,787,298 |
FY21 |
Q1 |
FY23 |
Q1 |
133 |
Fire Station 48 |
S15015 |
Fire-Rescue |
Design Build |
$17,137,500 |
$21,091,000 |
FY22 |
Q3 |
FY23 |
Q2 |
134 |
Tecolote Canyon Trunk Sewer Improvement |
S15020 |
Public Utilities |
Design Bid Build |
$40,394,050 |
$48,000,000 |
FY22 |
Q3 |
FY23 |
Q3 |
135 |
Olive Grove Community Park ADA Improveme |
S15028 |
Parks & Recreation |
Design Bid Build |
$2,498,814 |
$3,702,464 |
FY23 |
Q1 |
FY23 |
Q3 |
136 |
Morena Pipeline |
S16027 |
Public Utilities |
Design Bid Build |
$33,444,875 |
$39,609,023 |
FY23 |
Q1 |
FY23 |
Q2 |
137 |
Carmel Valley CP - Turf Upgrades |
S16029 |
Parks & Recreation |
Design Bid Build |
$3,468,542 |
$4,774,121 |
FY23 |
Q1 |
FY23 |
Q3 |
138 |
Ocean Air CP Comfort Station & Park Impr |
S16031 |
Parks & Recreation |
Design Bid Build |
$1,223,021 |
$2,181,793 |
FY23 |
Q1 |
FY23 |
Q3 |
139 |
Solana Highlands NP-Comfort Station |
S16032 |
Parks & Recreation |
Design Bid Build |
$1,564,900 |
$2,444,542 |
FY23 |
Q1 |
FY23 |
Q3 |
140 |
Carmel Knoll NP-Comfort Station |
S16033 |
Parks & Recreation |
Design Bid Build |
$587,000 |
$1,409,332 |
FY23 |
Q1 |
FY23 |
Q3 |
141 |
Carmel Grove NP-Comfort Station |
S16038 |
Parks & Recreation |
Design Bid Build |
$971,019 |
$2,004,242 |
FY23 |
Q1 |
FY23 |
Q3 |
142 |
Carmel Mission NP Comfort Station Develo |
S16039 |
Parks & Recreation |
Design Bid Build |
$647,900 |
$1,409,733 |
FY23 |
Q1 |
FY23 |
Q3 |
143 |
Canon Street Pocket Park |
S16047 |
Parks & Recreation |
Design Bid Build |
$1,574,350 |
$3,199,315 |
FY23 |
Q1 |
FY23 |
Q3 |
144 |
University Avenue Complete Street Phase1 |
S18001 |
Transportation |
Design Bid Build |
$6,921,000 |
$10,874,460 |
FY21 |
Q3 |
FY23 |
Q2 |
145 |
Harbor Drive Trunk Sewer |
S18006 |
Public Utilities |
Design Bid Build |
$30,987,399 |
$44,200,000 |
FY22 |
Q1 |
FY23 |
Q1 |
146 |
Jerabek Park Improvements |
S20007 |
Parks & Recreation |
Design Bid Build |
$4,901,192 |
$7,326,450 |
FY23 |
Q1 |
FY23 |
Q3 |
147 |
Kearny Mesa Facility Improvements |
S20009 |
Citywide |
Design Bid Build |
$14,864,176 |
$16,421,600 |
FY23 |
Q1 |
FY23 |
Q1 |
148 |
Lakeside Valve Station Replacement |
S22003 |
Public Utilities |
Design Bid Build |
$29,472,882 |
$42,397,105 |
FY23 |
Q1 |
FY23 |
Q3 |
149 |
Asphalt Overlay Group 2200A |
TBD1 |
Transportation |
TBD |
$5,000,000 |
$6,000,000 |
FY22 |
Q4 |
FY23 |
Q2 |
150 |
Asphalt Overlay Group 2200B |
TBD2 |
Transportation |
TBD |
$5,000,000 |
$6,000,000 |
FY23 |
Q1 |
FY23 |
Q2 |