Final Environmental Documents
The following final environmental documents prepared by the City of San Diego are available to view or download. Each final document includes:
- A revised document (as necessary);
- Comments received during the public comment period; and
- A list of commenters and responses to each comment.
(Pacific Beach) 3823 Ingraham Street (a.k.a. AVA Pacific Beach) / Project No. 1059329 / Environmental Impact Report / SCH No. 2022120345
- Errata - Date 01-05-2026
- Errata - Date 10-01-2025
- Environmental Impact Report
- Finding of Fact and Statement of Overriding Considerations
- Appendix A – Notice of Preparation and Letters of Comment
- Appendix B – Noise Study
- Appendix C – Vehicle Miles Traveled Analysis
- Appendix D – Local Mobility Analysis
- Appendix E – Air Quality Technical Report
- Appendix F – Climate Action Plan Consistency Analysis
- Appendix G – Letters Responses to Service Providers
- Appendix H – Drainage Report
- Appendix I – Storm Water Quality Management Plan
- Appendix J – Waste Management Plan
- Appendix K – Public Sewer System Analysis
- Appendix L – Water System Analysis
- Appendix M – EnviroStor Search
- Appendix N – Preliminary Geotechnical Evaluation
- Appendix O – Energy Tables
Posted by Development Services Department