Parks & Recreation
Open 10 a.m. to 8 p.m. every day of the year (exception of rainy days), including holidays.
The Park de la Cruz Skate Park opened in 2018. The park is a 19,300-square-foot facility. It features a flow bowl with spine ramp, street plaza with flow features, banks and transition ramps, street plaza a-frame with gap and rail features, signature mid-city ramp feature, beginner gap, rail, stair and ledge features backyard style pool it also includes urban elements such as railings, stairs, banks and ledges. The park is equipped with existing sports lighting with additional skate park lighting with ADA companion bench seating/observation areas as well.
The project design started in January 2007 with input from the City Heights-Mid City community members, including several skate board professionals. Construction started in summer 2016 with the grand opening on January 17, 2018.
The skate park is accessible by bus via SDMTS.