Horton's Addn Block 310 Card 2
HORTON'S ADDN BLOCK 310 CARD 2.tif..,.............. HO~TON 1S ADDITION BLOCK 310.. ~~--1%~ 0 ~~~~-81/ CARD_#2.A Portion Lot B, and all lots A,K, & Land Lots J & Kand portion B 1 C- APPROVE,.., (<\ by ZA to SECOND AND OLIVE VENTURE, A joint venture-Parker Industries, Inc.; a Cal if. Corporation and THE MATRIX PARTNERS, to construct a 19-story, 39-unit condomi- nium building incJuding recreation room and two levels of parking below: (1) to observe at the closest point a 3'4" front yard on both First and Second Avenues where 15' is required; (2) to observe a 41 1811 interior side yard where 55' is required; (3) to result in 27.8'/o lot coverage where maximum 26% is permitted; (4) with elevator tower 20 1 above roof where maximum 13 1 is permitted; (5) with stair tower 10' above roof where a maximum 9' is permitted; (6) to erect retaining waJls ranging in height from 5 1611 to 14' observing a 0 1 interior side yard and a O' front yard where maximum 6 1 and 3' high walls are permitted in required Interior side and front yard; and (7) to construct a 7 1611 20 1 high spa enclosure observing a 7' interior side yard where 55' is required, at 100 block of Olive Street between First Avenue & Second Avenue, zone R-3-A. Conditions. EXT, to 7/7/82 Case 16585 3-7-80 EXTENSION OF TIME TO 3/7/85 Case 16585 3/2/84