Architectural & Engineering (A&E) and Other Consultant Contracts FY2023
Architectural & Engineering (A&E) and Other Consultant Contracts FY2023
FY2023:A&E and Other Consultant Contracts Awarded for a total value of
FY2022: A&E and Other Consultant Contracts Awarded
FY2021: A&E and Other Consultant Contracts Awarded
FY2020: A&E and Other Consultant Contracts Awarded
FY2019: A&E and Other Consultant Contracts Awarded
FY2018: A&E and Other Consultant Contracts Awarded
FY2017: A&E and Other Consultant Contracts Awarded
FY2016 A&E and Other Consultant Contracts Awarded
FY2016 A&E and Other Consultant Contracts Awarded
FY2015 A&E and Other Consultant Contracts Awarded
FY2014 A&E and Other Consultant Contracts Awarded
FY2013 A&E and Other Consultant Contracts Awarded
The requisite justification memo for all contracts identified below as sole-source contracts is included in the PDF document for each contract. It is available for viewing by clicking on the Contract Number for the desired project.
To comply with the requirements of Proposition A and the San Diego Sunshine Act, the contracts listed here are being made available to help ensure that the public has access to government information and policymaking information. These resources provide, in a searchable format, the text of all A&E and other consultant contracts entered into by the City valued at more than $25,000, from July 1, 2018 through June 30, 2019.
To view a contract, click on the Contract Number for the desired project.
Contract Number | Contract Name | Award Date | Award Amount | Contractor | Number of Firms Interviewed | Contact |
---|---|---|---|---|---|---|
![]() | As-Needed Marine Structural Engineering | 1/26/23 | $3,000,000.00 | Moffatt & Nichol | 2 | Spencer Deane |
![]() | As-Needed Stormwater CIP Management and Engineering Design Services | 1/17/23 | $75,000,000.00 | HDR Engineering , Inc. | 3 | Cindy Crocker |
![]() | Design of San Carlos Interconnect and Transmission Pipeline | 1/13/23 | $998,968.00 | T.Y. Lin International | 4 | Spencer Deane |
![]() | EMTS NTC Lab Rmdel and NTC Lab Slar Implem | 12/10/22 | $2,411,734.00 | Sillman Wright Architects | 5 | Angelica Gil |
![]() | PUD Integrated Master Plan | 12/5/22 | $3,781,567.00 | CDM Smith, Inc | 2 | John Mendivil |
![]() | Design of Ward Canyon Neighborhood Park Phase III | 10/10/22 | $872,489.00 | KTUA Planning & Landscape Architecture | 5 | John Mendivil |
![]() | Design of Rancho Bernardo Industrial Pump Station Replacement | 11/29/22 | $2,251,320.00 | Stantec Consulting Services, Inc. | 3 | Cindy Crocker |
![]() | As-Needed Landscape Architectural Design Services | 11/21/22 | $3,000,000.00 | KTU+A Planning & Landscape Architecture | 9 | Cindy Crocker |
![]() | As-Needed Landscape Architectural Design Services | 11/21/22 | $3,000,000.00 | Schmidt Design Group, Inc. | 9 | Cindy Crocker |
![]() | As-Needed Landscape Architectural Design Services | 11/21/22 | $3,000,000.00 | Spurlock Landscape Architects | 9 | Cindy Crocker |
![]() | Design of San Carlos Reservoir Replacement | 11/18/22 | $999,768.00 | Dudek | 5 | Angelica Gil |
![]() | As-Needed Water System Operations Consultant Support | 11/9/22 | $250,000.00 | Wood Rodgers, Inc. | 5 | Angelica Gil |
![]() | La Media Improvements Siempre Viva to Truck Route | 10/12/22 | $564,935.30 | Hunsaker & Associates San Diego, Inc. | 5 | Spencer Deane |
![]() | Design of Maple Canyon Storm Drain Upgrade Phase 3 | 08/22/22 | $6,000,000.00 | Rick Engineering | 3 | John Mendivil |
![]() | As-Needed Environmental Services - Contract 5 | 7/8/22 | $4,000,000.00 | Recon Environmental, Inc. | 5 | Yazmin Lozano |