Minor RepairContracts FY2020

Total Amount Awarded: $0.00

The requisite justification memo for all contracts identified below as sole-source contracts is included in the PDF document for each contract. It is available for viewing by clicking on the Contract Number for the desired project.

To comply with the requirements of Proposition A and the San Diego Sunshine Act, the contracts listed here are being made available to help ensure that the public has access to government information and policymaking information. These resources provide, in a searchable format, the text of all construction project contracts entered into by the City valued at more than $25,000, from July 1, 2019 through June 30, 2020.

To view a contract, click on the Contract Number for the desired project.

 

Contract Number Contract Name Award Date Award Amount Contractor No. of Bidders Contact
PDF iconM-20-0020 Electrical Work at the Fire-Rescue Emergency Command and Data Center 05/21/2020 $25,452.01 Baker Electric N/A Rosa Riego
PDF iconM-20-0016 SDPD Headquarters Mailroom Flooring 04/07/2020 $2,132.00 Star Flooring & Remodeling N/A Taylor Cox
PDF iconM-20-0017 Industrial Wastewater Control Program Flooring Replacement 04/01/2020 $33,500.00 Star Flooring & Remodeling N/A Taylor Cox
PDF iconM-20-0014 Harbor Drive Pedestrian Bridge Elevator 03/11/2020 $30,854.68 San Diego Elevator Company, Inc. N/A Rosa Riego
PDF iconM-20-0015 City Heights Pool Repair 02/25/2020 $243,000.00 Piperin Corporation N/A Rosa Riego
PDF iconM-20-0013 101 Ash St. Asbestos Mitigation 01/27/2020 $184,450.00 Argus Pacific Contracting N/A Rosa Riego
PDF iconM-20-0011 Mid-City and Bonita Pipeline 10/10/2019 $170,100.00 Ahrens Mechanical 1 Rosa Riego
PDF iconM-19-0008 MOC 2 Breakroom, 1st and 2nd Flooring Replacement 08/29/2019 $17,042.13 Hasenin Enterprises, LLC dba Star Flooring & Remodeling 1 Rosa Riego
PDF iconM-19-0006 MBC Floor Replacement Project 08/29/2019 $39,217.24 Hasenin Enterprises, LLC dba Star Flooring & Remodeling 1 Rosa Riego
PDF iconM-19-0009 Brown Field Airport Re-Roof on Tower 07/02/2019 $27,980.31 Blue Pacific Engineering & Construction 1 Rosa Riego
PDF iconM-19-0007 Tie Down Installation Montgomery Gibbs Airport 07/02/2019 $4,855.38 Blue Pacific Engineering & Construction 1 Rosa Riego

* NTE - Not-to-Exceed