77°

San Diego
Weather

Accessibility Tools

  • Check if your spelling is correct, or try removing filters.
  • Remove quotes around phrases to match each word individually: "blue drop" will match less than blue drop.
  • You can require or exclude terms using + and -: big +blue drop will require a match on blue while big blue -drop will exclude results that contain drop.

Construction Contracts FY2015

Construction Contracts FY2015

FY2023 Construction Contracts Awarded

FY2022 Construction Contracts Awarded

FY2021 Construction Contracts Awarded

FY2020 Construction Contracts Awarded

FY2019 Construction Contracts Awarded

FY2018 Construction Contracts Awarded

FY2017 Construction Contracts Awarded

FY2016 Construction Contracts Awarded

FY2015: 91 Construction Contracts awarded for a total value of $270,237,425.42

FY2014 Construction Contracts Awarded

FY2013 Construction Contracts Awarded

The requisite justification memo for all contracts identified below as sole-source contracts is included in the PDF document for each contract. It is available for viewing by clicking on the Contract Number for the desired project.

To comply with the requirements of Proposition A and the San Diego Sunshine Act, the contracts listed here are being made available to help ensure that the public has access to government information and policymaking information. These resources provide, in a searchable format, the text of all construction project contracts entered into by the City valued at more than $25,000, from July 1, 2014 through June 30, 2015.

To view a contract, click on the Contract Number for the desired project.

 

 

* To sort on a column, click on its heading. To sort on multiple columns, hold the Shift key while clicking.

Contract Number Contract Name Award Date Award Amount Contractor Number of Bidders Contact
PDF icon K-15-1300-MAC-3 Otay Mesa Storm Drain Upgrade (Task #13) 6/24/2015 $2,660,201.00 El Cajon Grading & Engineering Co., Inc. 4 Clementina Giordano
PDF icon K-15-6435 Reimbursement Agreement No. 1313870 - Project T-7 Traffic Signals Carmel Valley Rd - Clarkview & Via Abertura - Pacific Highlands Ranch 6/22/2015 $261,000.00 Pardee Homes N/A Frank A. Romero
PDF icon K-15-1235-DBI-3 Mira Mesa Community Park- Expansion Phase I Design-Build Contract 6/17/2015 $12,400,000.00 T.B. Penick & Sons, Inc. 4 Eleida Felix Yackel
PDF icon K-15-1309-JOC-3 Job Order Contract (JOC) T15 Street Lighting/Traffic Signals For Capital Improvement Projects Only 6/16/2015 $4,500,000.00 HMS Construction, Inc. 3 Eleida Felix Yackel
PDF icon L-15-1290-JOC-2 JOC SLBE ES15 - Electrical Systems for Capital Improvement Projects Only 6/15/2015 *NTE
$500,000.00
CTE, Inc. 3 Damian Singleton
PDF icon K-15-1142-DBB-3 Mission Beach Boardwalk Bulkhead 6/15/2015 $2,174,346.68 TechCom International Corp. 5 Clementina Giordano
PDF icon K-15-1232-DBB-3 34th St. & 35th St. at Madison Ave. Improvements 6/15/2015 $523,487.94 Crest Equipment, Inc. 5 Clementina Giordano
PDF icon K-15-1104-DBB-3 Sewer Pipeline Lateral Rehabilitation "Phase I-2" 6/15/2015 $2,794,000.00 S.C. Valley Engineering, Inc. 4 Clementina Giordano
PDF icon K-15-1319-MAC-3 Catalina 12" Cast Iron Main And Catalina Sewer Main (Task #14) 6/15/2015 $18,367,000.00 Orion Construction/Balboa Construction JV 4 Clementina Giordano
PDF icon K-15-1301-DBB-3 Slurry Seal Group 1501 6/9/2015 $2,992,909.53 American Asphalt South Inc. 3 Damian Singleton
PDF icon K-15-6301-MAC-3 AC Water and Sewer Group 1016 (Task #11) 6/2/2015 $3,621,320.00 TC Construction Co., Inc. 5 Clementina Giordano
PDF icon L-15-1281-JOC-2 Job Order Contract- (JOC) SLBE PS15 Right of Way Pipeline 5/29/2015 $250,000.00 Transtar Pipeline, Inc. 3 Eleida Felix Yackel
PDF icon K-15-1337-DBB-3 L1501 Citywide Traffic Loop Replacement 5/28/2015 $687,000.00 Select Electric, Inc.. 3 Damian Singleton
PDF icon K-15-5280-DBB-3 Sewer and AC Water Group 5/21/2015 $2,465,000.00 Burtech Pipelines Incorporated 2 Eleida Felix Yackel
PDF icon K-15-1245-JOC-3 North of I8 Job Order Contract - (JOC) SP15 Street Paving #2 (North of I8) 5/19/2015 NTE* $20,000,000.00 ATP General Engineering 7 Clementina Giordano
PDF icon K-15-1245-JOC-3 South of I8 Job Order Contract - (JOC) SP15 Street Paving #2 (South of I8) 5/19/2015 NTE* $20,000,000.00 TC Construction Co., Inc. 7 Clementina Giordano
PDF icon K-15-1313-DBB-3 Slurry Seal Group 1502 5/13/2015 $2,642,810.00 American Asphalt South, Inc. 3 Damian Singleton
PDF icon K-15-1351-DBB-3 Asphalt Overlay Group 5/12/2015 $10,507,935.00 ATP General Engineering Contracts 6 Eleida Felix Yackel
PDF icon K-15-1243-DBB-3 Pipeline Rehabilitation AA-1 5/8/2015 $4,218,497.75 Southwest Pipeline & Trenchless Corp. 2 Eleida Felix Yackel
PDF icon K-15-6232-DB1-3-A Elevator Modernization Projects Design-Build Contract 5/7/2015 $469,720.00 Solpac Construction Inc. dba Solteck Pacific Construction Co. 2 Eleida Felix Yackel
PDF icon K-15-5837-DBB-3-B Pump Station 2 Rosecrans Force Main Siphon, And West Point Loma Interceptor Sewer (WPLIS) Liner Repairs 5/7/2015 $1,969,690.00 Sancon Engineering, Inc. 2 Clementina Giordano
PDF icon K-15-1295-DBB-3 Water Group 962 5/7/2015 $2,149,000.00 PK Mehanical Systems, Inc. 4 Damian Singleton
PDF icon L-15-5879-DBB-1 Allied Gardens Park Green Lot 5/7/2015 $181,071.00 Delta Builders, Inc. 6 Damian Singleton
PDF icon K-15-1308-MAC-3 AC Water Group 1010 and AC Water Group 1005 5/6/2015 $4,310,000.00 Orion Construction/Balboa Construction JV 4 Clementina Giordano
PDF icon L-15-1200-DBB-1 Mobley St. (2764) Storm Drain Replacement 4/22/2015 $117,750.80 Vailston Company, Inc. 6 Clementina Giordano
PDF icon L-15-6135-DBB-1 Sewer Pump Station 33 Wall Repairs 4/17/2015 $61,995.00 A.B. Hashmi, Inc. 3 Eleida Felix Yackel
PDF icon K-15-1322-JOC-3 Job Order Contract- (JOC) S15 Sitework for Capital Improvement Projects Only 4/16/2015 $4,500,000.00 Ramona Paving & Construction Corp.. 2 Eleida Felix Yackel
PDF icon K-15-1364-SLS-3-C Sole-Source Construction Services For Crystal Pier Improvements 4/16/2015 $570,000.00 John S. Meek Company, Inc. Sole Source Eleida Felix Yackel
PDF icon L-15-1303-DBB-1 Fairmount Ave - Columbine / Quince SR2S 4/15/2015 $178,123.30 Just Construction, Inc. 6 Clementina Giordano
PDF icon L-15-1274-JOC-2 Job Order Contract (JOC) - SLBE SS15 Sitework 4/14/2015 $500,000.00 Moshiri Enterprises, dba Delta Builders 4 Eleida Felix Yackel
PDF icon K-15-1218-DBB-3-C Pipeline Rehabilitation AB-1 4/14/2015 $4,537,051.65 Southwest Pipeline and Trenchless Corp. 2 Damian Singleton
PDF icon L-15-1289-JOC-2 Job Order Contract (JOC) SLBE TS15 Street Lighting/Traffic Signal for Capital Improvement Projects Only 4/13/2015 NTE*
$500,000.00
Southwest Traffic Signal Services, Inc. 3 Clementina Giordano
PDF icon K-15-1310-DBB-1 AC Water & Sewer Group 1004 4/3/2015 $2,221,579.26 Burtech Pipeline, Inc. 6 Damian Singleton
PDF icon L-15-1342-DBB-1 Chelsea Ave w/s East Dolphin MS DS 4/2/2015 $72,165.00 Q3Pacific, Inc. 2 Eleida Felix Yackel
PDF icon K-15-1214-DBB-3-C Sewer and Water Group JOB 940 4/1/2015 $8,441,265.55 TC Construction Co. Inc. 4 Eleida Felix Yackel
PDF icon L-15-1230-DBB-1 Aero Drive and Sandrock Road ADA CR Obstruction DS 3/26/2015 $134,975.00 New Century Construction 7 Damian Singleton
PDF icon K-15-1314-DBB-3 USD Water Main Replacement - Phase I 3/25/2015 $781,739.10 Transtar Pipeline, Inc. 6 Eleida Felix Yackel
PDF icon K-15-6430-EMR-2 Carroll Canyon Rd Storm Drain Emergency Repairs 3/20/2015 $250,000.00 Cass Construction, Inc. 1 Clementina Giordano
PDF icon L-15-1212-DBB-1 Solola & Euclid CR Obstruction DS 3/16/2015 $138,773.60 New Century Construction, Inc. 3 Clementina Giordano
PDF icon L-15-1222-DBB-2 Rancho Penasquitos Library HVAC 3/12/2015 $329,937.00 Paradigm Mechanical 2 Eleida Felix Yackel
PDF icon K-15-6267-DBB-3 AC Water Group 1006 and Storm Drain Group 1006 3/12/2015 $2,722,017.60 KTA Construction, Inc. 6 Clementina Giordano
PDF icon K-15-6221-DBB-3-A Park Boulevard and San Diego High School Pedestrian Traffic Signal and Streetscape Improvements 4/20/2015 $764,889.00 Tri-Group Construction and Development, Inc. 6 Damian Singleton
PDF icon K-15-6285-DBB-3 South Chollas Landfill Operations Yard Improvement Project 3/11/2015 $8,800,577.00 SRM Contracting and Paving 8 Clementina Giordano
PDF icon L-156374-DBB-2 Skyline Temporary Fire Station 3/4/2015 $361,970.22 Montgomery Construction Services, Inc. 5 Clementina Giordano
PDF icon L-15-1242-DBB-1 Group Job 13B Curb Ramps 2/23/2015 $139,995.00 A.B. Hashmi, Inc. 8 Damian Singleton
PDF icon K-15-5716-DBB-3 University Avenue Pipeline Replacement 2/20/2015 $19,354,365.00 Burtech Pipeline, Inc 2 Damian Singleton
PDF icon K-15-1217-DBB-3 Boundary St & Edmonton Ave SMR 2/19/2015 $456,466.63 Pullman Engineering, Inc 3 Damian Singleton
PDF icon K-15-6230-DBB-3 FY 14 Slurry Seal Group 3 2/11/2015 $2,520,000.00 Intermountain Slurry Seal 3 Damian Singleton
PDF icon K-15-1180-DBB-3 South Mission Beach Lifeguard Station 2/9/2015 $3,736,169.00 EC Constructors, Inc. 8 Damian Singleton
PDF icon K-15-6020-DBB-3 MYF Rehab Runway 5/23 & Taxiway G 1/22/2015 $4,810,519.21 West Coast General Corporation 6 Eleida Felix Yackel
PDF icon K-15-5368-DBB-3 Pipeline Rehab - Phase G-2 (Laterals); K-15-5368-DBB-3 1/20/2015 $4,106,220.00 Southwest Pipeline & Trenchless Corp. 4 Clementina Giordano
PDF icon L-15-1209-DBB-2 Torrey Pines Road Improvements Phase I 1/12/2015 $281,917.00 Tri-Group Construction and Development, Inc. 4 Eleida Felix Yackel
PDF icon K-14-6181-MAC-3 Sewer Group Job 743 (Task #06) 1/9/2015 $3,147,000.00 Orion Construction Corp./Balboa Construction Inc. J.V. 5 Clementina Giordano
PDF icon K-15-1234-DBB-3 Los Penasquitos / Black Mountain Ranger Station 1/6/2015 $1,124,230.00 West Coast General Corp. 6 Damian Singleton
PDF icon K-15-6354-EMR-3 "Emergency Repairs of the 16" DI Pipeline at I-15 and East Mission Bay Drive 12/17/2014 $750,000.00 J.R. Filanc Construction Company, Inc. 1 Clementina Giordano
PDF icon K-14-6014-DBB-3 Florida Drive Median Barrier 11/25/2014 $707,942.00 Hazard Construction Company 4 Eleida Felix Yackel
PDF icon K-15-5875-DBB-3-C Sewer Group 691 11/25/2014 $2,390,083.00 Ortiz Corporation 4 Damian Singleton
PDF icon K-15-6162-MAC-3 Otay 1st PL University Heights 11/18/2014 $3,170,535.00 El Cajon Grading & Engineering Co., Inc. 4 Clementina Giordano
PDF icon K-14-1097-DBB-3 Pipeline Rehab Phase F-2 (Laterals) 11/10/2014 $5,093,938.90 Burtech Pipeline Incorporated 4 Eleida Felix Yackel
PDF icon K-15-1196-DBB-3 Sewer Group Job 795 10/30/2014 $649,970.50 Southwest Pipeline & Trenchless, Inc 4 Damian Singleton
PDF icon L-14-1211-DBB-2 Preece Street Storm Drain Replacement 10/22/2014 $209,600.00 Rentex Construction, Inc. 10 Clementina Giordano
PDF icon K-14-1189-DB1-2 Mission Beach Lifeguard Station Improvements Design-Build Contract 10/21/2014 $362,000.00 Tony Cossi Construction 1 Damian Singleton
PDF icon K-14-6148-MAC-3-C Water Group Job 948 and Water & Sewer Group Job 963 10/14/2014 $6,936,845.00 Ortiz Corporation 4 Clementina Giordano
PDF icon L-14-1187-DBB-1 Restoration and Painting of Talmadge Acorn Streetlights 10/8/2014 $194,170.00 CTE, Inc. 2 Damian Singleton
PDF icon K-14-1195-DBB-3 Sodium Hypochlorite at Otay Water Treatment Plant Design-Build Contract 10/7/2014 $2,887,600 Orion Construction Corporation 2 Damian Singleton
PDF icon K-15-6309-EMR-2-C Emergency Repairs of the 20 Inch Pacific Beach Water Pipeline 10/2/2014 $400,000.00 TC Construction Company, Inc. 1 Eleida Felix Yackel
PDF icon K-14-1213 Skylark Canyon Sewer Rehabilitation 9/26/2014 $419,900.00 Wier Construction Corporation 2 Clementina Giordano
PDF icon K-15-6229-DBB-3 FY 14 - Slurry Seal Group 2 11/5/2014 $385,680.00 American Asphalt South, Inc. 3 Eleida Felix Yackel
PDF icon L-14-1221-DBB-2 Central Ave. Mini Park Phase II Skate Plaza 9/25/2014 $385,680.00 APR Construction Inc. 3 Eleida Felix Yackel
PDF icon K-14-5766 Pipeline Rehabilitation T-1 9/25/2014 $2,086,414.20 Southwest Pipeline and Trenchless 2 Damian Singleton
PDF icon K-14-6224 Reimbursement Agreement - Project 43-21 & U-4 - Little McGonigle Ranch Road Pipeline-Phases II & V - in the Del Mar Mesa & Pacific Highlands Ranch Communities 9/19/2014 $4,300,000.00 Pardee Homes N/A Frank Romero
PDF icon K-14-1225-DBB-3 Sewer Group Job 833 9/8/2014 $483,300.00 Burtech Pipeline Incorporated 2 Eleida Felix Yackel
PDF icon K-14-5958-DBB-3 Torrey Highlands Park - Play Area Upgrades 9/2/2014 $626,000.00 Alvand Construction 8 Clementina Giordano
PDF icon K-14-1202 Central Ave. Mini Park - Phase I 8/29/2014 $681,740.00 APR Construction, Inc. 6 Clementina Giordano
PDF icon L-14-5685-DBB-2 Avocado Place Brow Ditch Repair Project 8/29/2014 $233,834.00 New Century Construction 8 Damian Singleton
PDF icon K-14-6099-DBB-3-C FY 14 Concrete Street Panel Replacement Group 2 8/27/2014 $3,428,300.00 Portillo Concrete 3 Damian Singleton
PDF icon L-14-6198-DBB-1 Museum of Man Interior Repairs 8/25/2014 $155,000.00 Handy Industrial 3 Clementina Giordano
PDF icon K-14-6120-DBB-3 Horton Plaza Improvement Project 8/19/2014 $14,456,555.00 Echo Pacific Construction, Inc. 8 Damian Singleton
PDF icon K-14-6123-MACC-3 Emerald Hills Standpipe Demolition (Task #9) 8/18/2014 $617,281.00 J.R. Filanc Construction Company, Inc. 4 Clementina Giordano
PDF icon K-14-5653-DBB-3 Wegeforth Elementary School Joint Use Park Improvements 8/17/2014 $2,323,232.00 Dick Miller, Inc. 5 Eleida Felix Yackel
PDF icon K-14-5976-DBB-3-A Point Loma Digesters 7, N1/N2., C1/C2 Roof Coating Replacement Bubble/Blister Repair 8/14/2014 $721,595.00 Brazos Urethane, Inc. 4 Damian Singleton
PDF icon K-14-1172-DBB-3 Pipeline Rehabilitation X-1 7/31/2014 $513,700.00 Burtech Pipeline, Inc 3 Damian Singleton
PDF icon K-14-1013-DB1-3-B Balboa Golf Course - Concrete Improvements Design-Build Contract 7/25/2014 $1,486,582.00 PAL General Engineering, Inc 5 Damian Singleton
PDF icon K-14-1199-DBB-3 Casa De Balboa and Museum of Man ADA Barrier Removal 7/25/2014 $589,700.00 Atlas Development Inc 4 Damian Singleton
PDF icon K-14-6089-DBA-3 Storm Water Permanent BMP Retrofit Project Design-Build Contract 7/23/2014 $1,643,000.00 Orion Construction 2 Clementina Giordano
PDF icon L-14-6053-DBB-2 FY'13 Slurry Seal Group VII 7/22/2014 $267,762.00 Tri-Group Construction & Development, Inc. 2 Eleida Felix Yackel
PDF icon K-14-4976-DBB-3-C Montgomery Middle School Joint Use Park 7/21/2014 $833,078.00 Dick Miller, Inc. 4 Clementina Giordano
PDF icon L-14-6056-DBB-2 FY'13 Slurry Seal Group IX 7/21/2014 $286,940.00 PAL General Engineering, Inc. 5 Clementina Giordano
PDF icon K-14-5830-DBB-3 Palm Avenue Roadway Improvements - East of Beyer Way to Del Cardo Avenue 7/15/2014 $1,539,554.00 Tri-Group Construction & Development Inc 4 Damian Singleton
PDF icon K-14-5963-DBB-3 Poway Road Bicycle Path-Class I 7/1/2014 $1,330,280.00 Ramona Paving & Construction Corp. 12 Eleida Felix Yackel
PDF icon L-14-6052-DBB-2 FY'13 Slurry Seal Group VI 6/26/2014 $248,747.00 PAL General Engineering, Inc. 2 Clementina Giordano

* NTE - Not-to-Exceed