FY2015: 91Construction Contracts awarded for a total value of $270,237,425.42

FY2014 Construction Contracts Awarded

FY2013 Construction Contracts Awarded

The requisite justification memo for all contracts identified below as sole-source contracts is included in the PDF document for each contract. It is available for viewing by clicking on the Contract Number for the desired project.

To comply with the requirements of Proposition A and the San Diego Sunshine Act, the contracts listed here are being made available to help ensure that the public has access to government information and policymaking information. These resources provide, in a searchable format, the text of all construction project contracts entered into by the City valued at more than $25,000, from July 1, 2014 through June 30, 2015.

To view a contract, click on the Contract Number for the desired project.

* To sort on a column, click on its heading. To sort on multiple columns, hold the Shift key while clicking.

Contract NumberContract NameAward DateAward AmountContractorNumber of BiddersContact
K-15-1300-MAC-3Otay Mesa Storm Drain Upgrade (Task #13)6/24/2015$2,660,201.00El Cajon Grading & Engineering Co., Inc.4Clementina Giordano
K-15-6435Reimbursement Agreement No. 1313870 - Project T-7 Traffic Signals Carmel Valley Rd - Clarkview & Via Abertura - Pacific Highlands Ranch6/22/2015$261,000.00Pardee HomesN/AFrank A. Romero
K-15-1235-DBI-3Mira Mesa Community Park- Expansion Phase I Design-Build Contract6/17/2015$12,400,000.00T.B. Penick & Sons, Inc.4Eleida Felix Yackel
K-15-1309-JOC-3Job Order Contract (JOC) T15 Street Lighting/Traffic Signals For Capital Improvement Projects Only6/16/2015$4,500,000.00HMS Construction, Inc.3Eleida Felix Yackel
L-15-1290-JOC-2JOC SLBE ES15 - Electrical Systems for Capital Improvement Projects Only6/15/2015*NTE
$500,000.00
CTE, Inc.3Damian Singleton
K-15-1142-DBB-3Mission Beach Boardwalk Bulkhead6/15/2015$2,174,346.68TechCom International Corp.5Clementina Giordano
K-15-1232-DBB-334th St. & 35th St. at Madison Ave. Improvements6/15/2015$523,487.94Crest Equipment, Inc.5Clementina Giordano
K-15-1104-DBB-3Sewer Pipeline Lateral Rehabilitation "Phase I-2"6/15/2015$2,794,000.00S.C. Valley Engineering, Inc.4Clementina Giordano
K-15-1319-MAC-3Catalina 12" Cast Iron Main And Catalina Sewer Main (Task #14)6/15/2015$18,367,000.00Orion Construction/Balboa Construction JV4Clementina Giordano
K-15-1301-DBB-3Slurry Seal Group 15016/9/2015$2,992,909.53American Asphalt South Inc.3Damian Singleton
K-15-6301-MAC-3AC Water and Sewer Group 1016 (Task #11)6/2/2015$3,621,320.00TC Construction Co., Inc.5Clementina Giordano
L-15-1281-JOC-2Job Order Contract- (JOC) SLBE PS15 Right of Way Pipeline5/29/2015$250,000.00Transtar Pipeline, Inc.3Eleida Felix Yackel
K-15-1337-DBB-3L1501 Citywide Traffic Loop Replacement5/28/2015$687,000.00Select Electric, Inc..3Damian Singleton
K-15-5280-DBB-3Sewer and AC Water Group5/21/2015$2,465,000.00Burtech Pipelines Incorporated2Eleida Felix Yackel
K-15-1245-JOC-3 North of I8Job Order Contract - (JOC) SP15 Street Paving #2 (North of I8)5/19/2015NTE* $20,000,000.00ATP General Engineering7Clementina Giordano
K-15-1245-JOC-3 South of I8Job Order Contract - (JOC) SP15 Street Paving #2 (South of I8)5/19/2015NTE* $20,000,000.00TC Construction Co., Inc.7Clementina Giordano
K-15-1313-DBB-3Slurry Seal Group 15025/13/2015$2,642,810.00American Asphalt South, Inc.3Damian Singleton
K-15-1351-DBB-3Asphalt Overlay Group5/12/2015$10,507,935.00ATP General Engineering Contracts6Eleida Felix Yackel
K-15-1243-DBB-3Pipeline Rehabilitation AA-15/8/2015$4,218,497.75Southwest Pipeline & Trenchless Corp.2Eleida Felix Yackel
K-15-6232-DB1-3-AElevator Modernization Projects Design-Build Contract5/7/2015$469,720.00Solpac Construction Inc. dba Solteck Pacific Construction Co.2Eleida Felix Yackel
K-15-5837-DBB-3-BPump Station 2 Rosecrans Force Main Siphon, And West Point Loma Interceptor Sewer (WPLIS) Liner Repairs5/7/2015$1,969,690.00Sancon Engineering, Inc.2Clementina Giordano
K-15-1295-DBB-3Water Group 9625/7/2015$2,149,000.00PK Mehanical Systems, Inc.4Damian Singleton
L-15-5879-DBB-1Allied Gardens Park Green Lot5/7/2015$181,071.00Delta Builders, Inc.6Damian Singleton
K-15-1308-MAC-3AC Water Group 1010 and AC Water Group 10055/6/2015$4,310,000.00Orion Construction/Balboa Construction JV4Clementina Giordano
L-15-1200-DBB-1Mobley St. (2764) Storm Drain Replacement4/22/2015$117,750.80Vailston Company, Inc.6Clementina Giordano
L-15-6135-DBB-1Sewer Pump Station 33 Wall Repairs4/17/2015$61,995.00A.B. Hashmi, Inc.3Eleida Felix Yackel
K-15-1322-JOC-3Job Order Contract- (JOC) S15 Sitework for Capital Improvement Projects Only4/16/2015$4,500,000.00Ramona Paving & Construction Corp..2Eleida Felix Yackel
K-15-1364-SLS-3-CSole-Source Construction Services For Crystal Pier Improvements4/16/2015$570,000.00John S. Meek Company, Inc.Sole SourceEleida Felix Yackel
L-15-1303-DBB-1Fairmount Ave - Columbine / Quince SR2S4/15/2015$178,123.30Just Construction, Inc.6Clementina Giordano
L-15-1274-JOC-2Job Order Contract (JOC) - SLBE SS15 Sitework4/14/2015$500,000.00Moshiri Enterprises, dba Delta Builders4Eleida Felix Yackel
K-15-1218-DBB-3-CPipeline Rehabilitation AB-14/14/2015$4,537,051.65Southwest Pipeline and Trenchless Corp.2Damian Singleton
L-15-1289-JOC-2Job Order Contract (JOC) SLBE TS15 Street Lighting/Traffic Signal for Capital Improvement Projects Only4/13/2015NTE*
$500,000.00
Southwest Traffic Signal Services, Inc.3Clementina Giordano
K-15-1310-DBB-1AC Water & Sewer Group 10044/3/2015$2,221,579.26Burtech Pipeline, Inc.6Damian Singleton
L-15-1342-DBB-1Chelsea Ave w/s East Dolphin MS DS4/2/2015$72,165.00Q3Pacific, Inc.2Eleida Felix Yackel
K-15-1214-DBB-3-CSewer and Water Group JOB 9404/1/2015$8,441,265.55TC Construction Co. Inc.4Eleida Felix Yackel
L-15-1230-DBB-1Aero Drive and Sandrock Road ADA CR Obstruction DS3/26/2015$134,975.00New Century Construction7Damian Singleton
K-15-1314-DBB-3USD Water Main Replacement - Phase I3/25/2015$781,739.10Transtar Pipeline, Inc.6Eleida Felix Yackel
K-15-6430-EMR-2Carroll Canyon Rd Storm Drain Emergency Repairs3/20/2015$250,000.00Cass Construction, Inc.1Clementina Giordano
L-15-1212-DBB-1Solola & Euclid CR Obstruction DS3/16/2015$138,773.60New Century Construction, Inc.3Clementina Giordano
L-15-1222-DBB-2Rancho Penasquitos Library HVAC3/12/2015$329,937.00Paradigm Mechanical2Eleida Felix Yackel
K-15-6267-DBB-3AC Water Group 1006 and Storm Drain Group 10063/12/2015$2,722,017.60KTA Construction, Inc.6Clementina Giordano
K-15-6221-DBB-3-APark Boulevard and San Diego High School Pedestrian Traffic Signal and Streetscape Improvements4/20/2015$764,889.00Tri-Group Construction and Development, Inc.6Damian Singleton
K-15-6285-DBB-3South Chollas Landfill Operations Yard Improvement Project3/11/2015$8,800,577.00SRM Contracting and Paving8Clementina Giordano
L-156374-DBB-2Skyline Temporary Fire Station3/4/2015$361,970.22Montgomery Construction Services, Inc.5Clementina Giordano
L-15-1242-DBB-1Group Job 13B Curb Ramps2/23/2015$139,995.00A.B. Hashmi, Inc.8Damian Singleton
K-15-5716-DBB-3University Avenue Pipeline Replacement2/20/2015$19,354,365.00Burtech Pipeline, Inc2Damian Singleton
K-15-1217-DBB-3Boundary St & Edmonton Ave SMR2/19/2015$456,466.63Pullman Engineering, Inc3Damian Singleton
K-15-6230-DBB-3FY 14 Slurry Seal Group 32/11/2015$2,520,000.00Intermountain Slurry Seal3Damian Singleton
K-15-1180-DBB-3South Mission Beach Lifeguard Station2/9/2015$3,736,169.00EC Constructors, Inc.8Damian Singleton
K-15-6020-DBB-3MYF Rehab Runway 5/23 & Taxiway G1/22/2015$4,810,519.21West Coast General Corporation6Eleida Felix Yackel
K-15-5368-DBB-3Pipeline Rehab - Phase G-2 (Laterals); K-15-5368-DBB-31/20/2015$4,106,220.00Southwest Pipeline & Trenchless Corp.4Clementina Giordano
L-15-1209-DBB-2Torrey Pines Road Improvements Phase I1/12/2015$281,917.00Tri-Group Construction and Development, Inc.4Eleida Felix Yackel
K-14-6181-MAC-3Sewer Group Job 743 (Task #06)1/9/2015$3,147,000.00Orion Construction Corp./Balboa Construction Inc. J.V.5Clementina Giordano
K-15-1234-DBB-3Los Penasquitos / Black Mountain Ranger Station1/6/2015$1,124,230.00West Coast General Corp.6Damian Singleton
K-15-6354-EMR-3"Emergency Repairs of the 16" DI Pipeline at I-15 and East Mission Bay Drive12/17/2014$750,000.00J.R. Filanc Construction Company, Inc.1Clementina Giordano
K-14-6014-DBB-3Florida Drive Median Barrier11/25/2014$707,942.00Hazard Construction Company4Eleida Felix Yackel
K-15-5875-DBB-3-CSewer Group 69111/25/2014$2,390,083.00Ortiz Corporation4Damian Singleton
K-15-6162-MAC-3Otay 1st PL University Heights11/18/2014$3,170,535.00El Cajon Grading & Engineering Co., Inc.4Clementina Giordano
K-14-1097-DBB-3Pipeline Rehab Phase F-2 (Laterals)11/10/2014$5,093,938.90Burtech Pipeline Incorporated4Eleida Felix Yackel
K-15-1196-DBB-3Sewer Group Job 79510/30/2014$649,970.50Southwest Pipeline & Trenchless, Inc4Damian Singleton
L-14-1211-DBB-2Preece Street Storm Drain Replacement10/22/2014$209,600.00Rentex Construction, Inc.10Clementina Giordano
K-14-1189-DB1-2Mission Beach Lifeguard Station Improvements Design-Build Contract10/21/2014$362,000.00Tony Cossi Construction1Damian Singleton
K-14-6148-MAC-3-CWater Group Job 948 and Water & Sewer Group Job 96310/14/2014$6,936,845.00Ortiz Corporation4Clementina Giordano
L-14-1187-DBB-1Restoration and Painting of Talmadge Acorn Streetlights10/8/2014$194,170.00CTE, Inc.2Damian Singleton
K-14-1195-DBB-3Sodium Hypochlorite at Otay Water Treatment Plant Design-Build Contract10/7/2014$2,887,600Orion Construction Corporation2Damian Singleton
PDF icon K-15-6309-EMR-2-CEmergency Repairs of the 20 Inch Pacific Beach Water Pipeline10/2/2014$400,000.00TC Construction Company, Inc.1Eleida Felix Yackel
K-14-1213Skylark Canyon Sewer Rehabilitation9/26/2014$419,900.00Wier Construction Corporation2Clementina Giordano
K-15-6229-DBB-3FY 14 - Slurry Seal Group 211/5/2014$385,680.00American Asphalt South, Inc.3Eleida Felix Yackel
L-14-1221-DBB-2Central Ave. Mini Park Phase II Skate Plaza9/25/2014$385,680.00APR Construction Inc.3Eleida Felix Yackel
K-14-5766Pipeline Rehabilitation T-19/25/2014$2,086,414.20Southwest Pipeline and Trenchless2Damian Singleton
K-14-6224Reimbursement Agreement - Project 43-21 & U-4 - Little McGonigle Ranch Road Pipeline-Phases II & V - in the Del Mar Mesa & Pacific Highlands Ranch Communities9/19/2014$4,300,000.00Pardee HomesN/AFrank Romero
K-14-1225-DBB-3Sewer Group Job 8339/8/2014$483,300.00Burtech Pipeline Incorporated2Eleida Felix Yackel
K-14-5958-DBB-3Torrey Highlands Park - Play Area Upgrades9/2/2014$626,000.00Alvand Construction8Clementina Giordano
K-14-1202Central Ave. Mini Park - Phase I8/29/2014$681,740.00APR Construction, Inc.6Clementina Giordano
L-14-5685-DBB-2Avocado Place Brow Ditch Repair Project8/29/2014$233,834.00New Century Construction8Damian Singleton
K-14-6099-DBB-3-CFY 14 Concrete Street Panel Replacement Group 28/27/2014$3,428,300.00Portillo Concrete3Damian Singleton
L-14-6198-DBB-1Museum of Man Interior Repairs8/25/2014$155,000.00Handy Industrial3Clementina Giordano
K-14-6120-DBB-3Horton Plaza Improvement Project8/19/2014$14,456,555.00Echo Pacific Construction, Inc.8Damian Singleton
K-14-6123-MACC-3Emerald Hills Standpipe Demolition (Task #9)8/18/2014$617,281.00J.R. Filanc Construction Company, Inc.4Clementina Giordano
K-14-5653-DBB-3Wegeforth Elementary School Joint Use Park Improvements8/17/2014$2,323,232.00Dick Miller, Inc.5Eleida Felix Yackel
K-14-5976-DBB-3-APoint Loma Digesters 7, N1/N2., C1/C2 Roof Coating Replacement Bubble/Blister Repair8/14/2014$721,595.00Brazos Urethane, Inc.4Damian Singleton
K-14-1172-DBB-3Pipeline Rehabilitation X-17/31/2014$513,700.00Burtech Pipeline, Inc3Damian Singleton
K-14-1013-DB1-3-BBalboa Golf Course - Concrete Improvements Design-Build Contract7/25/2014$1,486,582.00PAL General Engineering, Inc5Damian Singleton
K-14-1199-DBB-3Casa De Balboa and Museum of Man ADA Barrier Removal7/25/2014$589,700.00Atlas Development Inc4Damian Singleton
K-14-6089-DBA-3Storm Water Permanent BMP Retrofit Project Design-Build Contract7/23/2014$1,643,000.00Orion Construction2Clementina Giordano
L-14-6053-DBB-2FY'13 Slurry Seal Group VII7/22/2014$267,762.00Tri-Group Construction & Development, Inc.2Eleida Felix Yackel
K-14-4976-DBB-3-CMontgomery Middle School Joint Use Park7/21/2014$833,078.00Dick Miller, Inc.4Clementina Giordano
L-14-6056-DBB-2FY'13 Slurry Seal Group IX7/21/2014$286,940.00PAL General Engineering, Inc.5Clementina Giordano
K-14-5830-DBB-3Palm Avenue Roadway Improvements - East of Beyer Way to Del Cardo Avenue7/15/2014$1,539,554.00Tri-Group Construction & Development Inc4Damian Singleton
K-14-5963-DBB-3Poway Road Bicycle Path-Class I7/1/2014$1,330,280.00Ramona Paving & Construction Corp.12Eleida Felix Yackel
L-14-6052-DBB-2FY'13 Slurry Seal Group VI6/26/2014$248,747.00PAL General Engineering, Inc.2Clementina Giordano

* NTE - Not-to-Exceed