Total Awarded Value: $0.00

The requisite justification memo for all contracts identified below as sole-source contracts is included in the PDF document for each contract. It is available for viewing by clicking on the Contract Number for the desired project.

To comply with the requirements of Proposition A and the San Diego Sunshine Act, the contracts listed here are being made available to help ensure that the public has access to government information and policymaking information. These resources provide, in a searchable format, the text of all A&E and other consultant contracts entered into by the City valued at more than $25,000, from July 1, 2022 through June 30, 2023.

To view a contract, click on the Contract Number for the desired project.

 

Contract NumberContract NameAward DateAward AmountContractorNumber of Firms InterviewedContact
H2225961As-Needed Marine Structural Engineering1/26/23$3,000,000.00Moffatt & Nichol2Spencer Deane
H2326146As-Needed Stormwater Design and Engineering Services - Contract 16/27/23$3,000,000.00Harris & Associates, Inc.7Frank Romero
H2225979As-Needed Storm Water Professional Engineering Services - Contract 16/20/23$25,000,000.00Michael Baker International, Inc.4Alex Mendivil
H2225952As-Needed Civil Engineering Services - Dams - Contract 16/30/23$7,000,000.00GEI Consultants, Inc.5John Mendivil
H2326147As-Needed Stormwater Design and Engineering Services - Contract 26/27/23$3,000,000.00Wood Rodgers, Inc.7John Mendivil
H2225980As-Needed Storm Water Professional Engineering Services - Contract 26/27/23$25,000,000.00Rick Engineering Company4Cindy Crocker
H2326195Olive Grove Community Park ADA Improvements6/30/23$127,785.00Moore Iacofano & Goltsman, Inc.N/AAlex Mendivil
H2226086As-Needed Energy Consultant Services6/22/23$3,000,000.00P2S, Inc.3Cindy Crocker
H2226097As-Needed Cultural Resources Consultant - Contract 26/20/23$ 4,000,000.00Helix Environmental Planning, Inc.5Alex Mendivil
H2226103As-Needed Transportation Modeling Services6/2/23$ 1,000,000.00SANDAGN/ACindy Crocker
H2226044Feasibility Study for 5th Ave Promenade5/31/23$ 514,903.00Psomas2Cindy Crocker
H2326159Southwest Park Public Art Project5/17/23$250,000.00Beliz Iristay, DBA Turkmex Designs49Frank Romero
H2225964Design of Otay 2nd Pipeline St Replacement Ph 55/11/23$3,247,222.00Hazen & Sawyer7Frank Romero
H2326145Willie Henderson Sports Complex Public Art Project5/11/23$60,000.00James Dinh dba Studifolia3John Mendivil
H2226089Design of Colina del Sol Improvement 15/11/23$999,825.00T.Y. Lin International5Angelica Gil
H2326144Hidden Trails Park Public Art Project5/4/23$100,000.00Trevor Amery3John Mendivil
H2226035Design of Water Group 972CI4/11/23$875,150.00Michael Baker5Angelica Gil
H2326189Bridging Documents for San Carlos Library3/22/23$555,610.00domusstudio architecture3Angelica Gil
H2225982Design of Otay Raw Water Pump Station Slope Repair3/23/23$990,338.00NV5, Inc.3Spencer Deane
H2226073Design of Clay Neighborhood Park3/16/23  $508,000.00Spurlock Landscape Architects5Cindy Crocker
H2226070As-Needed Engineering Technical Services - Advanced Meter Infrastructure Program3/16/23  $3,000,000.00Jacobs Engineering Group, Inc.6Spencer Deane
H2326128As-Needed Plan Check & Inspection Services - Contract 13/02/23  $2,500,000.00NV5, Inc.3Frank Romero
H2326129As Needed Plan Check and Inspection Services3/02/23  $2,500,000.00Interwest Consulting Group Inc.3Angelica Gil
H197070C&S Engineering, Inc.2/20/23  $1,241,590.70C&S Engineering, Inc.3Angelica Gil
H2225959As-Needed Aerial Surveying - Imagery & Photography (2022) - Contract 12/14/23$250,000.00Aerotech Mapping, Inc.4John Mendivil
H2225960As-Needed Aerial Surveying - Imagery & Photography (2022)2/14/23$250,000.00Digital Mapping, Inc.4Spencer Deane
H207203Design of Skyline Hills Fire Station #512/9/23$1,242,725.00COAR Design Group5Cindy Crocker
H2226019As-Needed Stormwater CIP Management and Engineering Design Services1/17/23$75,000,000.00HDR Engineering , Inc.3Cindy Crocker
H2225981Design of San Carlos Interconnect and Transmission Pipeline1/13/23$998,968.00T.Y. Lin International4Spencer Deane
H2125840EMTS NTC Lab Rmdel and  NTC Lab Slar Implem12/10/22$2,411,734.00Sillman Wright Architects5Angelica Gil
H2125885PUD Integrated Master Plan12/5/22$3,781,567.00CDM Smith, Inc2John Mendivil
H2125832Design of Ward Canyon Neighborhood Park Phase III10/10/22$872,489.00KTUA Planning & Landscape Architecture5John Mendivil
H2125936Design of Rancho Bernardo Industrial Pump Station Replacement11/29/22$2,251,320.00Stantec Consulting Services, Inc.3Cindy Crocker
H225990As-Needed Landscape Architectural Design Services11/21/22$3,000,000.00KTU+A Planning & Landscape Architecture9Cindy Crocker
H225991As-Needed Landscape Architectural Design Services11/21/22$3,000,000.00Schmidt Design Group, Inc.9Cindy Crocker
H225992As-Needed Landscape Architectural Design Services11/21/22$3,000,000.00Spurlock Landscape Architects9Cindy Crocker
H2225997Design of San Carlos Reservoir Replacement11/18/22$999,768.00Dudek5Angelica Gil
H2226017As-Needed Water System Operations Consultant Support11/9/22$250,000.00Wood Rodgers, Inc.5Angelica Gil
H207191La Media Improvements – Siempre Viva to Truck Route10/12/22$564,935.30Hunsaker & Associates San Diego, Inc.5Spencer Deane
H2125775Design of Maple Canyon Storm Drain Upgrade Phase 38/22/22$6,000,000.00Rick Engineering3John Mendivil
H2125823As-Needed Environmental Services - Contract 57/8/22$4,000,000.00Recon Environmental, Inc.5Yazmin Lozano