Development Services
Information Bulletins provide information on fees, submittal requirements or procedures.
How to Apply for a Conditional Use Permit Marijuana Production Facility
Marijuana Production Facilities (MPF) - Application Information
Revised July 2020
How to Obtain a Public Right-of-Way Permit for Traffic Control
This informational bulletin contains the permitting requirements and fees for Public Right-of-Way Permits for traffic control.
Revised March 2022
How to Obtain Hydrant Flow Data
Hydrant flow data for the design of fire sprinkler or standpipe systems requiring hydraulic calculations.
Revised March 2022
How to Obtain a Permit for Private Underground Fire Service and Hydrants
Revised October 2016
How to Obtain a Permit for Private Utilities
Permitting procedures for the installation of private underground domestic water and sewer.
Revised January 2022
How to Obtain an Address/Address Change
How to assign a new address for new projects or to request a change to an existing address.
Revised March 2021
How to Obtain a Permit for Electrical Vehicle Charging Systems
Permitting procedures for the installation of Electric Vehicle Charging Systems (EVCS) on existing sites or buildings.
Revised January 2022
Identifies building elements that qualify for deferred submittal and establishes related submittal procedures.
Revised April 2022
Submittal requirements for partial permits used when construction of an individual structure is divided into phases.
Revised April 2022
New shell buildings and existing buildings returning to a shell configuration.
Revised March 2018