Final Environmental Documents
The following final environmental documents prepared by the City of San Diego are available to view or download. Each final document includes:
- A revised document (as necessary);
- Comments received during the public comment period; and
- A list of commenters and responses to each comment.
(Rancho Penasquitos) The Junipers / Project No. 586670
- Errata Date 2-19-2021
- Environmental Impact Report Part 1
- Environmental Impact Report Part 2
- Environmental Impact Report Part 3
- Environmental Impact Report Part 4
- Environmental Impact Report Part 5
- Appendix A: Scoping Documents
- Appendix B: Transportation Impact Analysis
- Appendix C: Acoustical Analysis Report
- Appendix D: Air Quality Technical Report
- Appendix E: GHG Technical Report & CAP checklist
- Appendix F: Biological Resources Letter Report
- Appendix G1: Drainage Study
- Appendix G2: Storm Water Quality Management Plan
- Appendix H: Geotechnical Investigation
- Appendix I1: Archaeological Resources Report Form
- Appendix I2: Built Environmental Assessment
- Appendix I3: AB 52 Documentation
- Appendix J1: Water Supply Assessment
- Appendix J2: Private Water System Analysis
- Appendix J3: Sewer System Analysis
- Appendix J4: Waste Management Plan
- Appendix K1: Phase 1 Environmental Site Assessment Part 1
- Appendix K1: Phase 1 Environmental Site Assessment Part 2
- Appendix K1: Phase 1 Environmental Site Assessment Part 3
- Appendix K2: Supplemental Phase 1 ESA Part 1
- Appendix K2: Supplemental Phase 1 ESA Part 2
- Appendix K3: Asbestos and Lead-Based Paint Investigation
- Appendix K4: Wildland Five Evacuation Plan
- Appendix K5: Fire Protection Plan
- Appendix L: Paleontological Records Search
- Draft Candidate Findings of Fact
Posted by Development Services Department
- Mitigated Negative Declaration
- Addendum Biological Resource Letter
- Biological Resources Letter Report
- Climate Action Plan Consistency Checklist
- Drainage Report
- Preliminary Geological Hazards Study
- Preliminary Geotechnical Investigation
- Response to City of San Diego LDR - Geology
Posted by Development Services Department
(Barrio Logan & Southeastern) Water and Sewer Group Job 1052A / Project No. 660674
Posted by Engineering & Capital Projects
(Uptown) Maple Canyon Restoration Project / Project No. 517439
- Mitigated Negative Declaration
- Archaeological Survey
- Biological Technical Report
- Biological Technical Report Addendum
- Climate Action Plan Consistency Checklist
- Drainage Report
- Drainage Study
- Geotechnical Investigation Report
Posted by Development Services Department
(Pacific Highlands Ranch) Del Mar Highlands Estates / Project No. 655778
- Addendum
- Addendum No. 500066
- Environmental Impact Report No. 94-0576
- Drainage Report
- Geotechnical Report Update
- Sewer Study Amendment
- Supplement Biology Letter
- Traffic Report
- Water Study Amendment
Posted by Development Services Department
(Southeastern) Sewer and Water Group 794 / Project No. 671673
Posted by Development Services Department
(Otay Mesa) Industrial Building SDP / Project No. 665589
- Addendum
- Environment Impact Report No. 304032
- Access Analysis
- Air Quality Modeling Output
- Biological Technical Report
- Climate Action Plan Consistency Checklist
- Geotechnical Investigation
- Historical Resources Survey
- Preliminary Drainage Study
- Storm Water Quality Management Plan
- Waste Management Plan
Posted by Development Services Department
(Mid-City) 4th Corner Apartments / Project No. 661800
- Errata Date 11-19-2020
- Environmental Impact Report
- Finding and Statement of Overriding Considerations
- Appendix A: NOP and Comment Letters
- Appendix B: Trip Generation, Project Information Form, Vehicle Miles Travelled
- Appendix C: Air Quality Study
- Appendix D: Noise Study
- Appendix E: Climate Action Plan Consistency Checklist
- Appendix F: Geotechnical Investigations
- Appendix G: Historic Resources Technical Report
- Appendix H1: Preliminary Drainage Report
- Appendix H2: Preliminary Stormwater Quality Management Plan
- Appendix I: Waste Management Plan
Posted by Development Services Department
(Peninsula)) Voltaire Street SDP/MV / Project No. 640598
- Acoustical Analysis Report
- Climate Action Plan Consistency Checklist
- Geotechnical Investigation Report
- Preliminary Drainage Study
- Storm Water Quality Management Plan
Posted by Development Services Department
(Pacific Beach, Mission Bay & College) AC Water & Sewer Group 1036 / Project No. 658730
Posted by Development Services Department
(Skyline Paradise Hills) Sewer and Water Group 765A / Project No. 662431
Posted by Development Services Department
(Carmel Valley) Arroyo Sorrento TM / Project No. 610681
- Mitigated Negative Declaration
- Biological Survey Report
- Climate Action Plan Consistency Checklist
- Cultural Resource Survey
- Preliminary Geological Investigation
- Storm Water Applicability Checklist
Posted by Development Services Department
(Mission Bay Park, Linda Vista & Mission Valley) Alvaradro 2nd Pipeline Extension / Project No. 662953
- Mitigated Negative Declaration No. 255100
- Biological Technical Report
- Cultural Resources Technical Report
Posted by Development Services Department
(San Ysidro) Beyer Park / Project No. 589554
- Errata Date 10-18-2020
- Mitigated Negative Declaratio
- Archaeological Resources Survey
- Biological Resources Report
- Biological Resources Report References
- Geotechnical Investigation
- Noise Technical Report
- Preliminary Drainage Assessment
- Preliminary Drainage Study
- Storm Water Quality Management Plan
Posted by Development Services Department
(Rancho Bernardo) Vardy House SDP / Project No. 644944
- Mitigated Negative Declaration
- Biology Report
- Climate Action Plan Consistency Checklist
- Cultural Resource Survey
- Geotechnical Report
- Storm Water Applicability Checklist
Posted by Development Services Department
(Tierrasanta) AC Water & Sewer Group 1056 / Project No. 661067
Posted by Development Services Department
(Mission Valley) Riverwalk / Project No. 581984
- Errata Date 11-16-2020
- Errata Date 11-12-2020
- Environmental Impact Report (part 1)
- Environmental Impact Report (part 2)
- Environmental Impact Report (part 3)
- Response to Comments (Part 1)
- Response to Comments (Part 2)
- Response to Comments (Part 3)
- Findings and Statement of Overriding Considerations
- Appendix A: Notice of Preparation and Letters of Comment
- Appendix AA: MTS letter for Levi Cushman Specific Plan Rescission
- Appendix B: Transcript of Public Scoping Meeting
- Appendix BB: Interpretive Signage for Tribal Cultural Resources
- Appendix C1: Climate Action Plan Conformance Evaluation
- Appendix C2: Climate Action Plan Consistency Checklist
- Appendix CC: Riverwalk Specific Plan (Part 1)
- Appendix CC: Riverwalk Specific Plan (Part 2)
- Appendix CC: Riverwalk Specific Plan (Part 3a)
- Appendix CC: Riverwalk Specific Plan (Part 3b)
- Appendix CC: Riverwalk Specific Plan (Part 4)
- Appendix CC: Riverwalk Specific Plan (Part 5)
- Appendix CC: Riverwalk Specific Plan (Part 6)
- Appendix D: Transportation Impact Analysis
- Appendix DD: Planned Land Use
- Appendix EE: Construction and Health Risk Assessment
- Appendix F: Air Quality Study
- Appendix FF: Soils Management Plan
- Appendix FF1: Department of Health Letter
- Appendix G: Cultural Resources Inventory Report
Appendix H: Addendum to Class III Cultural Resource Inventory
- Appendix I: Historical Resources Technical Report
- Appendix J: Letters Responses to Service Providers
- Appendix K: Noise Study
- Appendix L1: Transportation Improvement Plan
- Appendix L2: Trip Generation Tables
- Appendix L3: EDU Calculation Table
- Appendix M: Preliminary Geotechnical Investigation
- Appendix P: Water Supply Assessment
- Appendix Q: Waste Management Plan
- Appendix R: Water Study
- Appendix S: Sewer Study
- Appendix T: Phase I Environmental Site Assessment
- Appendix U: Subsurface Assessment
- Appendix V: Envirofacts Search
- Appendix W: Wetland Restoration Plan
- Appendix Y: FAA Determination of No Hazard Letters
- Appendix Z: SDCRAA Airport Land Use Commission Determination
Posted by Development Services Department
(Barrio Logan & Southeastern) AC Water and Sewer Group 1052 / Project No. 667612
Posted by Development Services Department
Lillian Lentell Cottage CDP SDP / Project No. 560771
- Mitigated Negative Declaration
- Bishops Soil 1994
- Climate Action Plan Consistency Checklist
- Historical Resource Technical Report
- Monitoring Plan
- Treatment Plan
Posted by Development Services Department
(Citywide) Group 160621 Underground Utility Districts (UUD) / Project No. 594590 / Final MND
- Final Mitigated Negative Declaration Project No. 594590
- Biology Report - UU229 Block 1H (July 2020)
- Biology Report - UU906 Block 3CC1 (July 2020)
Posted by City Planning Department