Final Environmental Documents
The following final environmental documents prepared by the City of San Diego are available to view or download. Each final document includes:
- A revised document (as necessary);
- Comments received during the public comment period; and
- A list of commenters and responses to each comment.
04/13/2021
(College) College View Apartments SDP/NDP/PDP / Project No. 646497
- Mitigated Negative Declaration
- Biological Survey Report
- CAP Checklist
- Geotechnical Report
- Historical Resource Research Report
- Noise Analysis Report
- Preliminary Stormwater Design Letter
- Storm Water Quality Plan
- Waste Management Plan
Posted by Development Services Department
04/13/2021
(Kearny Mesa) Kearny Mesa Logistics Center Project / Project No. 649192
- Mitigated Negative Declaration
- Acoustical Analysis Report
- Air Quality Technical Report
- Archaeological Resources Report
- Biological Technical Report
- Preliminary Geotechnical Investigation
- Vernal Pool Monitoring and Management Plan
- Waste Management Plan
Posted by Development Services Department
04/02/2021
(Otay Mesa) La Media Road Improvement / Project No. 667298
- Addendum No. 667298
- Environmental Impact Report No. 304032
- Archaeology Report Improvements
- Archaeology Report Wetland Mitigated Area
- BUOW Focused Survey Results
- CalEEMod Construction Emissions Outputs
- CAP Consistency Checklist
- Drainage Study
- Focused Fairy Shrimp Protocol Survey
- Geotechnical Update Report
Posted by Development Services Department
04/01/2021
(College) College Area Sewer and Water Group SDP / Project No. 646068
- Mitigated Negative Declaration
- Biological Technical Report
- Climate Action Plan Consistency Checklist
- Geology Environmental Review
- Historical Resources Survey
- Preliminary Geotechnical Investigation
Posted by Development Services Department
03/29/2021
(Uptown) Kite Street Pipe Repair Project / Project No. 660539
- Addendum No. 660539
- Errata to Environmental Impact Report No. 616992
- Environmental Impact Report No. 616992
- Biological Resources Memo
- Archaeological Resources Memo
- Paleontological Resources Memo
Posted by City Planning Department
03/24/2021
(La Jolla) Bellava CDP SDP TM / Project No. 655382
- Mitigated Negative Declaration
- Climate Action Plan Consistency Checklist
- Drainage Study
- Geotechnical Investigation Report
- Storm Water Applicability Checklist
Posted by Development Services Department
03/18/2021
(North Park, Greater Golden Hill and Balboa Park) Sewer-Storm Drain Group Job 828 / Project No. 652296
- Mitigated Negative Declaration
- Archaeological Report
- Biology Resources Report
- Climate Action Plan Consistency Checklist
- Drainage Study
- Geotechnical Study
Posted by Development Services Department
02/23/2021
(Otay Mesa) Tijuana Cross Border Amendment / Project No. 597523
- Addendum No. 597523
- Environmental Impact Report No. 169653
- Alternative Access Assessment
- Climate Action Plan Checklist
- Traffic Impact Study
Posted by Development Services Department
02/17/2021
(Skyline-Paradise Hills) Lisbon Heights SDP/PDP/TM / Project No. 622368
- Mitigated Negative Declaration
- Acoustical Analysis Report
- Air Quality Assessment
- Biological Resources Letter
- Climate Action Plan Consistency Checklist
- Cultural Resources Report
- Geotechnical Investigation
- Paleontological Record
- Storm Water Quality Management Plan
- Traffic Letter
Posted by Development Services Department
02/05/2021
(Greater Golden Hill) 32nd & Broadway / Project No. 637438
- Errata Date 2-23-2021
- Mitigated Negative Declaration
- Acoustical Analysis Report
- ALUC Consistency Determination Letter
- Biological Resource Technical Report
- Climate Action Plan Consistency Checklist
- Cultural Resource Survey Phase l
- Drainage Study
- Geotechnical Investigation Report
- Health Risk Assessment
- Sewer Study
- Storm Water Quality Management Plan
- Transportation Analysis
Posted by Development Services Department
02/05/2021
(Mission Valley) Mission Valley Home Depot / Scottish Rite Redevelopment / Project No. 657591
- Addendum No. 657591
- Environmental Impact Report No. 518009
- Biological Resources Report
- CalEEMod Out file
- CAP Checklist
- Drainage Study
- Historic Architectural Building Survey
- Preliminary Geotechnical Engineering Investigation Report
- Sewer System Sizing Calculations
- Storm Water Quality Management Plan
- Traffic Impact Analysis
- Vehicle Miles Traveled Study
- Water System Sizing Calculations
Posted by Development Services Department
02/04/2021
(Otay Mesa) Lumina II Tentative Map and Neighborhood Development Permit / Project No. 625830
- Addendum No. 625830
- Addendum No. 408329 Central Village Specific Plan
- Program Environmental Impact Plan No. 30330-30432
- Appendix A: CAP Checklist
- Appendix B: Biological Resources Letter Report
- Appendix C1: Cultural Resources Survey
- Appendix C2: Historic Resources Supplemental Information Package
- Appendix D: Phase I Environmental Site Assessment
- Appendix E1: Drainage Study
- Appendix E2: Storm Water Quality Management Plan
- Appendix F: Geotechnical Report
- Appendix G: Traffic Analysis Memorandum
- Appendix H: Amendment No. 1 to Sewer Study
Posted by Development Services Department
01/26/2021
(La Jolla) 8423 El Paseo CDP SDP / Project No. 661815
- Mitigated Negative Declaration
- Climate Action Plan Consistency Checklist
- Drain Study Letter
- Preliminary Geotechnical Investigation
- Storm Water Requirements Applicability Checklist
Posted by Development Services Department
01/21/2021
(Rancho Penasquitos) The Junipers / Project No. 586670
- Errata Date 2-19-2021
- Environmental Impact Report Part 1
- Environmental Impact Report Part 2
- Environmental Impact Report Part 3
- Environmental Impact Report Part 4
- Environmental Impact Report Part 5
- Appendix A: Scoping Documents
- Appendix B: Transportation Impact Analysis
- Appendix C: Acoustical Analysis Report
- Appendix D: Air Quality Technical Report
- Appendix E: GHG Technical Report & CAP checklist
- Appendix F: Biological Resources Letter Report
- Appendix G1: Drainage Study
- Appendix G2: Storm Water Quality Management Plan
- Appendix H: Geotechnical Investigation
- Appendix I1: Archaeological Resources Report Form
- Appendix I2: Built Environmental Assessment
- Appendix I3: AB 52 Documentation
- Appendix J1: Water Supply Assessment
- Appendix J2: Private Water System Analysis
- Appendix J3: Sewer System Analysis
- Appendix J4: Waste Management Plan
- Appendix K1: Phase 1 Environmental Site Assessment Part 1
- Appendix K1: Phase 1 Environmental Site Assessment Part 2
- Appendix K1: Phase 1 Environmental Site Assessment Part 3
- Appendix K2: Supplemental Phase 1 ESA Part 1
- Appendix K2: Supplemental Phase 1 ESA Part 2
- Appendix K3: Asbestos and Lead-Based Paint Investigation
- Appendix K4: Wildland Five Evacuation Plan
- Appendix K5: Fire Protection Plan
- Appendix L: Paleontological Records Search
- Draft Candidate Findings of Fact
Posted by Development Services Department
01/14/2021
- Mitigated Negative Declaration
- Addendum Biological Resource Letter
- Biological Resources Letter Report
- Climate Action Plan Consistency Checklist
- Drainage Report
- Preliminary Geological Hazards Study
- Preliminary Geotechnical Investigation
- Response to City of San Diego LDR - Geology
Posted by Development Services Department
01/07/2021
(Barrio Logan & Southeastern) Water and Sewer Group Job 1052A / Project No. 660674
Posted by Engineering & Capital Projects
12/03/2020
(Uptown) Maple Canyon Restoration Project / Project No. 517439
- Mitigated Negative Declaration
- Archaeological Survey
- Biological Technical Report
- Biological Technical Report Addendum
- Climate Action Plan Consistency Checklist
- Drainage Report
- Drainage Study
- Geotechnical Investigation Report
Posted by Development Services Department
12/03/2020
(Pacific Highlands Ranch) Del Mar Highlands Estates / Project No. 655778
- Addendum
- Addendum No. 500066
- Environmental Impact Report No. 94-0576
- Drainage Report
- Geotechnical Report Update
- Sewer Study Amendment
- Supplement Biology Letter
- Traffic Report
- Water Study Amendment
Posted by Development Services Department
12/02/2020
(Southeastern) Sewer and Water Group 794 / Project No. 671673
Posted by Development Services Department
12/01/2020
(Otay Mesa) Industrial Building SDP / Project No. 665589
- Addendum
- Environment Impact Report No. 304032
- Access Analysis
- Air Quality Modeling Output
- Biological Technical Report
- Climate Action Plan Consistency Checklist
- Geotechnical Investigation
- Historical Resources Survey
- Preliminary Drainage Study
- Storm Water Quality Management Plan
- Waste Management Plan
Posted by Development Services Department