Final Environmental Documents
The following final environmental documents prepared by the City of San Diego are available to view or download. Each final document includes:
- A revised document (as necessary);
- Comments received during the public comment period; and
- A list of commenters and responses to each comment.
Mitigated Negative Declaration
Addendum Biological Resource Letter
Biological Resources Letter Report
Climate Action Plan Consistency Checklist
Drainage Report
Preliminary Geological Hazards Study
Preliminary Geotechnical Investigation
Response to City of San Diego LDR - Geology
Posted by Development Services Department
(Uptown) Maple Canyon Restoration Project / Project No. 517439
Mitigated Negative Declaration
Archaeological Survey
Biological Technical Report
Biological Technical Report Addendum
Climate Action Plan Consistency Checklist
Drainage Report
Drainage Study
Geotechnical Investigation Report
Posted by Development Services Department
(Pacific Highlands Ranch) Del Mar Highlands Estates / Project No. 655778
Addendum
Addendum No. 500066
Environmental Impact Report No. 94-0576
Drainage Report
Geotechnical Report Update
Sewer Study Amendment
Supplement Biology Letter
Traffic Report
Water Study Amendment
Posted by Development Services Department
(Southeastern) Sewer and Water Group 794 / Project No. 671673
Posted by Development Services Department
(Otay Mesa) Industrial Building SDP / Project No. 665589
Addendum
Environment Impact Report No. 304032
Access Analysis
Air Quality Modeling Output
Biological Technical Report
Climate Action Plan Consistency Checklist
Geotechnical Investigation
Historical Resources Survey
Preliminary Drainage Study
Storm Water Quality Management Plan
Waste Management Plan
Posted by Development Services Department
(Mid-City) 4th Corner Apartments / Project No. 661800
Errata Date 11-19-2020
Environmental Impact Report
Finding and Statement of Overriding Considerations
Appendix A: NOP and Comment Letters
Appendix B: Trip Generation, Project Information Form, Vehicle Miles Travelled
Appendix C: Air Quality Study
Appendix D: Noise Study
Appendix E: Climate Action Plan Consistency Checklist
Appendix F: Geotechnical Investigations
Appendix G: Historic Resources Technical Report
Appendix H1: Preliminary Drainage Report
Appendix H2: Preliminary Stormwater Quality Management Plan
Appendix I: Waste Management Plan
Posted by Development Services Department
(Peninsula)) Voltaire Street SDP/MV / Project No. 640598
Acoustical Analysis Report
Climate Action Plan Consistency Checklist
Geotechnical Investigation Report
Preliminary Drainage Study
Storm Water Quality Management Plan
Posted by Development Services Department
(Pacific Beach, Mission Bay & College) AC Water & Sewer Group 1036 / Project No. 658730
Posted by Development Services Department
(Skyline Paradise Hills) Sewer and Water Group 765A / Project No. 662431
Posted by Development Services Department
(Carmel Valley) Arroyo Sorrento TM / Project No. 610681
Mitigated Negative Declaration
Biological Survey Report
Climate Action Plan Consistency Checklist
Cultural Resource Survey
Preliminary Geological Investigation
Storm Water Applicability Checklist
Posted by Development Services Department
(Mission Bay Park, Linda Vista & Mission Valley) Alvaradro 2nd Pipeline Extension / Project No. 662953
Mitigated Negative Declaration No. 255100
Biological Technical Report
Cultural Resources Technical Report
Posted by Development Services Department
(San Ysidro) Beyer Park / Project No. 589554
Errata Date 10-18-2020
Mitigated Negative Declaratio
Archaeological Resources Survey
Biological Resources Report
Biological Resources Report References
Geotechnical Investigation
Noise Technical Report
Preliminary Drainage Assessment
Preliminary Drainage Study
Storm Water Quality Management Plan
Posted by Development Services Department
(Rancho Bernardo) Vardy House SDP / Project No. 644944
Mitigated Negative Declaration
Biology Report
Climate Action Plan Consistency Checklist
Cultural Resource Survey
Geotechnical Report
Storm Water Applicability Checklist
Posted by Development Services Department
(Tierrasanta) AC Water & Sewer Group 1056 / Project No. 661067
Posted by Development Services Department
(Mission Valley) Riverwalk / Project No. 581984
Errata Date 11-16-2020
Errata Date 11-12-2020
Environmental Impact Report (part 1)
Environmental Impact Report (part 2)
Environmental Impact Report (part 3)
Response to Comments (Part 1)
Response to Comments (Part 2)
Response to Comments (Part 3)
Findings and Statement of Overriding Considerations
Appendix A: Notice of Preparation and Letters of Comment
Appendix AA: MTS letter for Levi Cushman Specific Plan Rescission
Appendix B: Transcript of Public Scoping Meeting
Appendix BB: Interpretive Signage for Tribal Cultural Resources
Appendix C1: Climate Action Plan Conformance Evaluation
Appendix C2: Climate Action Plan Consistency Checklist
Appendix CC: Riverwalk Specific Plan (Part 1)
Appendix CC: Riverwalk Specific Plan (Part 2)
Appendix CC: Riverwalk Specific Plan (Part 3a)
Appendix CC: Riverwalk Specific Plan (Part 3b)
Appendix CC: Riverwalk Specific Plan (Part 4)
Appendix CC: Riverwalk Specific Plan (Part 5)
Appendix CC: Riverwalk Specific Plan (Part 6)
Appendix D: Transportation Impact Analysis
Appendix DD: Planned Land Use
Appendix EE: Construction and Health Risk Assessment
Appendix F: Air Quality Study
Appendix FF: Soils Management Plan
Appendix FF1: Department of Health Letter
Appendix G: Cultural Resources Inventory Report
Appendix H: Addendum to Class III Cultural Resource Inventory
Appendix I: Historical Resources Technical Report
Appendix J: Letters Responses to Service Providers
Appendix K: Noise Study
Appendix L1: Transportation Improvement Plan
Appendix L2: Trip Generation Tables
Appendix L3: EDU Calculation Table
Appendix M: Preliminary Geotechnical Investigation
Appendix P: Water Supply Assessment
Appendix Q: Waste Management Plan
Appendix R: Water Study
Appendix S: Sewer Study
Appendix T: Phase I Environmental Site Assessment
Appendix U: Subsurface Assessment
Appendix V: Envirofacts Search
Appendix W: Wetland Restoration Plan
Appendix Y: FAA Determination of No Hazard Letters
Appendix Z: SDCRAA Airport Land Use Commission Determination
Posted by Development Services Department
(Barrio Logan & Southeastern) AC Water and Sewer Group 1052 / Project No. 667612
Posted by Development Services Department
Lillian Lentell Cottage CDP SDP / Project No. 560771
Mitigated Negative Declaration
Bishops Soil 1994
Climate Action Plan Consistency Checklist
Historical Resource Technical Report
Monitoring Plan
Treatment Plan
Posted by Development Services Department
(Citywide) Group 160621 Underground Utility Districts (UUD) / Project No. 594590 / Final MND
Final Mitigated Negative Declaration Project No. 594590
Biology Report - UU229 Block 1H (July 2020)
Biology Report - UU906 Block 3CC1 (July 2020)
Posted by City Planning Department
(University) Costa Verde Revitalization / Project No. 477943
Environmental Impact Report (Part 1)
Environmental Impact Report (Part 2)
Findings and Statement of Overriding Considerations 10-20-2020
Appendix A: Notice of Preparation and Responses
Appendix B: Traffic Impact Analysis
Appendix B2: Traffic Supplemental Memo
Appendix C: Air Quality Technical Report
Appendix D: Climate Action Plan Consistency Chechlist
Appendix E: Accoustical Analysis Report
Appendix F: Geologic Reconnaissance Report
Appendix G1: Drainage Study
Appendix G2: Storm Water Quality Managnement Plan
Appendix H1: Water Supply Assessment
Appendix H2: Sewer Memorandum
Appendix H3: Waste Management Plan
Appendix I: Alternatives Traffic Analysis
Posted by Development Services Department
(Southeastern) Sewer Group 843 / Project No. 651025
Posted by Development Services Department