Final Environmental Documents
The following final environmental documents prepared by the City of San Diego are available to view or download. Each final document includes:
- A revised document (as necessary);
- Comments received during the public comment period; and
- A list of commenters and responses to each comment.
(Midway-Pacific Highway) Midway Rising Specific Plan / Project No. 1106734 / Subsequent Environmental Impact Report / SCH 2023120451
- Subsequent Environmental Impact Report
- CEQA Findings & Statement of Overriding Considerations
- Appendix A – Scoping Meeting Notice of Preparation and Comment Letters
- Appendix B – 2018 Midway-Pacific Highway CPU Revised Final PEIR
- Appendix D1 – Local Mobility Analysis
- Appendix D2 – Vehicle Miles Traveled Memo
- Appendix D3 – Community Plan Amendment Report
- Appendix D4 – Transportation Demand Management Plan
- Appendix D5 – Privately Owned Parcels and Effects on the Local Mobility Analysis Memorandum
- Appendix D6 – Privately Owned Parcels and Effects on the Vehicle Miles Traveled Analysis Memorandum
- Appendix D7 – Site Plan Modification Effects on the Community Plan Amendment Memorandum
- Appendix E1 – Updated Midway Rising Cultural Report
- Appendix E2 – HRTR 3220, 3240, 3250 and 3350 Sport Arena Boulevard Buildings
- Appendix E3 – Historical Resource Technical Report San Diego International Sports Arena
- Appendix F1 – Geotechnical Desktop Study Report
- Appendix F2 – Preliminary Geotechnical Investigation Report
- Appendix F3 – Addendum No. 1 to the Preliminary Geotechnical Investigation Report
- Appendix G1 – Updated Midway Rising Noise Report
- Appendix G2 – Noise Technical Report Memorandum
- Appendix H1 – Phase I Environmental Site Assessment (Part 1)
- Appendix H1 – Phase I Environmental Site Assessment (Part 2)
- Appendix H1 – Phase I Environmental Site Assessment (Part 3)
- Appendix H2 – Phase II Environmental Site Assessment
- Appendix H3 – Phase II ESA 2 – Geophys Survey and Trenching Assessment
- Appendix H4 – Asbestos and Lead-Based Paint Survey
- Appendix H5 – Off-Site Right-of-Way Soil Management Letter
- Appendix H6 – Additional Phase II Environmental Site Assessment
- Appendix I1 – Preliminary Drainage Report
- Appendix I2 – Storm Water Quality Management Plan
- Appendix J – Visual Analysis
- Appendix K1 – Air Quality Technical Report and Health Risk Assessment
- Appendix K2 – Air Quality Supplemental Memorandum
- Appendix K3 – Greenhouse Gas Impact Analysis
- Appendix L1 – Fire-Rescue Department Correspondence Letter
- Appendix L2 – Police Department Finding Letter
- Appendix L3 – San Diego Unified School District Will Serve Letter
- Appendix M1 – Public Sewer System Analysis
- Appendix M2 – Public Water System Analysis
- Appendix M3 – Water Supply Assessment and Verification Report
- Appendix M4 – Waste Management Plan
- Appendix N – Biological Resources Constraints Study
- Appendix O – Conceptual Site Plan Draft Vesting Tentative Map
Posted by Development Services Department
Utilities Undergrounding Program / Final Program Environmental Impact Report / SCH No. 2018101037
- FINAL PEIR / SCH No. 2018101037
- Appendix A_NOP_Comment Letters
- Appendix B CalEEMOD Outputs
- Appendix C-1_Part 1 Bio Mapbook_Sensitive Plants and Wildlife
- Appendix C-1_Part 2 Bio Mapbook_Sensitive Plants and Wildlife
- Appendix C-2_Bio Species Tables
- Appendix D_Cultural Resources Inventory
- Appendix E_UUP_Historic Resources Report
- Appendix F_Noise Modeling Outputs
- Appendix G_Paleontological Resources_Slipsheet_Report Confidential
Posted by City Planning Department
(La Jolla) 8303 La Jolla Shores / Project No. PRJ – 1085883 / Addendum / SCH No. 92071032
- Addendum
- Environmental Impact Report No. 92-0199
- Appendix A – Biological Survey Report
- Appendix B – Drainage Study
- Appendix C – Storm Water Quality Management Plan
- Appendix D – Geotechnical Investigation
- Appendix E – Waste Management Plan
- Appendix F – Archaeological Survey Report
Posted by Development Services Department
(Scripps Miramar Ranch) Miramar Reservoir Recreational Facilities / WBS No. B-23136 / Addendum / SCH No. 20160810168
- Addendum No. 23136
- Environmental Impact Report No. 499621 - Part 1
- Environmental Impact Report No. 499621 - Part 2
- Environmental Impact Report No. 499621 - Part 3
- Environmental Impact Report No. 499621 - Part 4
- Environmental Impact Report No. 499621 - Part 5
- Environmental Impact Report No. 499621 - Part 6
Posted by Engineering & Capital Projects
Final Program Environmental Impact Report for the Brown Field Municipal Airport Master Plan SCH No. 2019029037
- FINAL PEIR / SCH No. 2019029037
- Appendix A Notice of Preparation (NOP) and Comments on the NOP
- Appendix B Air Quality Technical Report
- Appendix C Aviation Air Quality and Noise Emissions Forecast Memorandum
- Appendix D Biological Technical Report
- Appendix E Greenhouse Gas Emissions Technical Report
- Appendix F Cultural Resources Technical Report
- Appendix G Historical Resource Technical Report
- Appendix H Hazardous Materials Technical Study
- Appendix I Transportation Impact Analysis and Local Mobility Analysis
Appendix J Mitigation Monitoring And Reporting Program
Posted by City Planning Department
(La Jolla) 1720 Torrey Pines / Project No. PRJ – 1111223 / Mitigated Negative Declaration / SCH No. 2025070372
- Mitigated Negative Declaration
- Appendix A - Archaeological Survey Report
- Appendix B - Biological Technical report
- Appendix C - Geotechnical Investigation Report
- Appendix D - Geotechnical Investigation Report Addendum
- Appendix E - Geotechnical Investigation Report Update
Posted by Development Services Department
(Pacific Beach) 3823 Ingraham Street (a.k.a. AVA Pacific Beach) / Project No. 1059329 / Environmental Impact Report / SCH No. 2022120345
- Environmental Impact Report
- Finding of Fact and Statement of Overriding Considerations
- Appendix A – Notice of Preparation and Letters of Comment
- Appendix B – Noise Study
- Appendix C – Vehicle Miles Traveled Analysis
- Appendix D – Local Mobility Analysis
- Appendix E – Air Quality Technical Report
- Appendix F – Climate Action Plan Consistency Analysis
- Appendix G – Letters Responses to Service Providers
- Appendix H – Drainage Report
- Appendix I – Storm Water Quality Management Plan
- Appendix J – Waste Management Plan
- Appendix K – Public Sewer System Analysis
- Appendix L – Water System Analysis
- Appendix M – EnviroStor Search
- Appendix N – Preliminary Geotechnical Evaluation
- Appendix O – Energy Tables
Posted by Development Services Department
(Downtown, Midway-Pacific Highway, Uptown) AC Water and Sewer Group Job 1033 / WBS Nos. 18021, 18022, 25014, 25015, 25016 / Addendum / SCH No. 2011091045
Posted by Engineering & Capital Projects
(Citywide) Final Program Environmental Impact Report for the Coastal Resilience Master Plan / SCH No. 2023050148
- Final PEIR / SCH No. 2023050148
- Appendix A: Notice of Preparation and Scoping Comments
- Appendix B: CalEEMod Results
- Appendix C: Biological Resources Technical Report
- Appendix D: Cultural Resources Technical Report
- Appendix E: Land Use Consistency Tables
Posted by City Planning Department
(La Jolla) 2072 Via Casa Alta / Project No. PRJ-0698915 / Mitigated Negative Declaration / SCH No. 2024040224
- Errata Date 6-24-2025
- Mitigated Negative Declaration
- Archaeological Survey Report
- Biology Study Report
- Drainage Study
- Geotechnical Investigation Report
- Geotechnical Investigation Report Addendum
- Storm Water Quality Management Plan
Posted by Development Services Department
(Barrio Logan) Mercado Apartments / Project No. PRJ-0696585 / Mitigated Negative Declaration / SCH No. 2025020359
Mitigated Negative Declaration
Appendix A – Air Quality Technical Report
Appendix B – Geotechnical Investigation
Appendix C – Seismic Risk Assessment
Appendix D – Storm Water Quality Management Plan
Appendix E – Climate Action Plan Checklist
Appendix F – Phase I Environmental Site Assessment Report
Appendix H – Exterior Noise Analysis Report
Appendix J – Waste Management Plan
Posted by Development Services Department
(Mira Mesa) Lusk on Lusk / Project No. PRJ – 1068155 / Addendum / SCH No. 2022090061
- Addendum No. 1068155
- Environmental Impact Report
- Appendix A – Air Quality Technical Report
- Appendix B – Environmentally Sensitive Lands Assessment
- Appendix C – Preliminary Geotechnical Investigation
- Appendix D – CAP Consistency Checklist
- Appendix E – Archaeological Resources Report Form
- Appendix F – VMT Assessment
- Appendix G – Stormwater Management Investigation
- Appendix H – Noise Technical Report
- Appendix I – Waste Management Plan
- Appendix J – Local Mobility Analysis
Posted by Development Services Department
(University) North City Water Reclamation Plant Pure Water Facility Warehouse / WBS No. B-23085 / Addendum / SCH No. 2016081016
- Addendum No. 23085
- Environmental Impact Report No. 499621- Part 1
- Environmental Impact Report No. 499621- Part 2
- Environmental Impact Report No. 499621- Part 3
- Environmental Impact Report No. 499621- Part 4
- Environmental Impact Report No. 499621- Part 5
- Environmental Impact Report No. 499621- Part 6
Posted by Engineering & Capital Projects
(Otay Mesa) Vista Santo Domingo Rezone and CPA / Project No. PRJ-1110197/ Addendum / SCH No. 2004651076
- Addendum No. 1110197
- Environmental Impact Report No. 30330/304032
- Appendix A- Air Quality and Greenhouse Gas Emission Modeling
Posted by Development Services Department
(Citywide) Stormwater Pipeline Projects / Project Nos. PRJ-0707058, PRJ-1107752, PRJ-1108649, PRJ-1123276, PRJ-1122165 / Addendum / SCH No. 2011091045
- Addendum Nos. 0707058, 1107752, 1108649, 1123276, 1122165
- Mitigated Negative Declaration No. 255100
- Biological Technical Report
- Revegetation Plan
- Water Study
Posted by City Planning Department
(La Jolla) 1821 Viking Way / Project No. PRJ-1114539 / Mitigated Negative Declaration / SCH- 2024110673
Posted by Development Services Department
(Otay Mesa) Nakano Project / Project No. 1076302 / Environmental Impact Report No. 22-001 / SCH No. 2022060260
- Environmental Impact Report
- Appendix A - Notice of Preparation and Comment Letters
- Appendix B - Environmental Policy and Consistency Analysis
- Appendix C - Air Quality Technical Report
- Appendix D - Biology Report
- Appendix E.1 - Geotechnical Investigation
- Appendix E.2 - Update to Geotechnical Investigation
- Appendix E.3 - Addendum to Geotechnical Report and Response to City of San Diego Review Comments
- Appendix E.4 - Response to City of San Diego Comments
- Appendix E.5 - Infiltration Feasibility Condition Letter
- Appendix E.6 - Response to City Comments
- Appendix F.1 - Paleontological Report
- Appendix F.2 - Paleontological Report Addendum
- Appendix G - Greenhouse Gas Emissions Analysis Technical Report
- Appendix H.1 - Phase I Environmental Site Assessment - Nakano Property
- Appendix H.2 - Phase I Environmental Site Assessment - Davies Property
- Appendix H.3 - Soil and Groundwater Sampling Report - Davies Property
- Appendix H.4 - Health Risk Assessment
- Appendix H.5 - Public Notice - Results of Site Investigations and Request for Site Closure
- Appendix H.6 - Results of Site Investigations and Request for Site Closure
- Appendix I - Fire Protection Plan
- Appendix J - Evacuation Plan
- Appendix K.1 - Historical Resources Inventory and Evaluation Report
- Appendix K.2 - Historical Resources Inventory and Evaluation Addendum
- Appendix K.3 - Native American Heritage Commission List
- Appendix L - Noise Technical Report
- Appendix M.1 - Vehicle Miles Traveled Analysis
- Appendix M.2 - Local Mobility Analysis
- Appendix N - Priority Development Project Storm Water Quality Management Plan (Part 1)
- Appendix N - Priority Development Project Storm Water Quality Management Plan (Part 2)
- Appendix N - Priority Development Project Storm Water Quality Management Plan (Part 3)
- Appendix N - Priority Development Project Storm Water Quality Management Plan (Part 4)
- Appendix O - Federal Emergency Management Agency Approval of Letter of Map Amendment
- Appendix P.1 - Public Facilities Finance Plan
- Appendix P.2 - Plan for Services
- Appendix Q - Service Letters & Responses
- Appendix R - City of San Diego Correspondence - DSD Engineering Division, Water and Sewer Section
- Appendix S - Sewer Study
- Appendix T - Water Analysis
- Appendix U - Waste Management Plan
Posted by Development Services Department
(University) 11011 Torreyana Road / PRJ – 1058759 / Subsequent Mitigated Negative Declaration / SCH No. 2019060003
- Subsequent Mitigated Negative Declaration
- Air Quality Technical Report
- Archaeological Resources Report
- Biological Technical Report
- Climate Action Plan Consistency Checklist
- Construction Noise Control Planning
- Geotechnical Investigation Report
- Hydrology and Hydraulics Study
- Phase I Environmental Site Assessment
- Traffic – Revised Local Mobility Analysis
- Traffic - WMT Analysis
- Waste Management Plan
Posted by Development Services Department
(Torrey Pines and University) Los Peñasquitos Lagoon Restoration Phase 1 / Project No. 697735 / Addendum / SCH No. 2017121036
- Addendum No. 697735
- Environmental Impact Report
- Design Plans
- Operation and Maintenance Plan
- Biological Technical Report
- Addendum to Biological Technical Report - Lagoon Marine Survey and Essential Fish Habitat Assessment
- Hydrologic and Hydraulic Report
- Hydrologic and Sediment Modeling for Freshwater Channels
- Water Quality and Hydrology Environmental Assessment Report
Posted by Engineering & Capital Projects
(North City Future Urbanizing Area (NCFUA) Framework Plan) El Camino Real Assisted Living Facility / Project No. 675732 / SCH No. 201371042
Subsequent Environmental Impact Report
Appendix A.1 - Notice of Preparation
Appendix A. 2 - Notice of Preparation Comment Letters
Appendix B - Phase I Environmental Site Assessment
Appendix C - Air Quality Modeling
Appendix D - Biological Technical Report
Appendix E - Climate Action Plan Consistency Checklist
Appendix F - Cultural Resources Inventory and Evaluation Report
Appendix G - Geotechnical Update and Storm Water Infiltration Study
Appendix H.1 - Access Analysis
Appendix L - Stormwater Quality Management Plan
Appendix M - Waste Management Plan
Appendix O - Fire Fuel Load Modeling Report
Appendix P - Construction Noise Avoidance Alternative Calculation Worksheets
Appendix Q - Emergency and Disaster Plan
Posted by Development Services Department