Final Environmental Documents
The following final environmental documents prepared by the City of San Diego are available to view or download. Each final document includes:
- A revised document (as necessary);
- Comments received during the public comment period; and
- A list of commenters and responses to each comment.
(Carmel Valley) Arroyo Sorrento TM / Project No. 610681
Mitigated Negative Declaration
Biological Survey Report
Climate Action Plan Consistency Checklist
Cultural Resource Survey
Preliminary Geological Investigation
Storm Water Applicability Checklist
Posted by Development Services Department
(Mission Bay Park, Linda Vista & Mission Valley) Alvaradro 2nd Pipeline Extension / Project No. 662953
Mitigated Negative Declaration No. 255100
Biological Technical Report
Cultural Resources Technical Report
Posted by Development Services Department
(San Ysidro) Beyer Park / Project No. 589554
Errata Date 10-18-2020
Mitigated Negative Declaratio
Archaeological Resources Survey
Biological Resources Report
Biological Resources Report References
Geotechnical Investigation
Noise Technical Report
Preliminary Drainage Assessment
Preliminary Drainage Study
Storm Water Quality Management Plan
Posted by Development Services Department
(Rancho Bernardo) Vardy House SDP / Project No. 644944
Mitigated Negative Declaration
Biology Report
Climate Action Plan Consistency Checklist
Cultural Resource Survey
Geotechnical Report
Storm Water Applicability Checklist
Posted by Development Services Department
(Tierrasanta) AC Water & Sewer Group 1056 / Project No. 661067
Posted by Development Services Department
(Mission Valley) Riverwalk / Project No. 581984
Errata Date 11-16-2020
Errata Date 11-12-2020
Environmental Impact Report (part 1)
Environmental Impact Report (part 2)
Environmental Impact Report (part 3)
Response to Comments (Part 1)
Response to Comments (Part 2)
Response to Comments (Part 3)
Findings and Statement of Overriding Considerations
Appendix A: Notice of Preparation and Letters of Comment
Appendix AA: MTS letter for Levi Cushman Specific Plan Rescission
Appendix B: Transcript of Public Scoping Meeting
Appendix BB: Interpretive Signage for Tribal Cultural Resources
Appendix C1: Climate Action Plan Conformance Evaluation
Appendix C2: Climate Action Plan Consistency Checklist
Appendix CC: Riverwalk Specific Plan (Part 1)
Appendix CC: Riverwalk Specific Plan (Part 2)
Appendix CC: Riverwalk Specific Plan (Part 3a)
Appendix CC: Riverwalk Specific Plan (Part 3b)
Appendix CC: Riverwalk Specific Plan (Part 4)
Appendix CC: Riverwalk Specific Plan (Part 5)
Appendix CC: Riverwalk Specific Plan (Part 6)
Appendix D: Transportation Impact Analysis
Appendix DD: Planned Land Use
Appendix EE: Construction and Health Risk Assessment
Appendix F: Air Quality Study
Appendix FF: Soils Management Plan
Appendix FF1: Department of Health Letter
Appendix G: Cultural Resources Inventory Report
Appendix H: Addendum to Class III Cultural Resource Inventory
Appendix I: Historical Resources Technical Report
Appendix J: Letters Responses to Service Providers
Appendix K: Noise Study
Appendix L1: Transportation Improvement Plan
Appendix L2: Trip Generation Tables
Appendix L3: EDU Calculation Table
Appendix M: Preliminary Geotechnical Investigation
Appendix P: Water Supply Assessment
Appendix Q: Waste Management Plan
Appendix R: Water Study
Appendix S: Sewer Study
Appendix T: Phase I Environmental Site Assessment
Appendix U: Subsurface Assessment
Appendix V: Envirofacts Search
Appendix W: Wetland Restoration Plan
Appendix Y: FAA Determination of No Hazard Letters
Appendix Z: SDCRAA Airport Land Use Commission Determination
Posted by Development Services Department
(Barrio Logan & Southeastern) AC Water and Sewer Group 1052 / Project No. 667612
Posted by Development Services Department
Lillian Lentell Cottage CDP SDP / Project No. 560771
Mitigated Negative Declaration
Bishops Soil 1994
Climate Action Plan Consistency Checklist
Historical Resource Technical Report
Monitoring Plan
Treatment Plan
Posted by Development Services Department
(Citywide) Group 160621 Underground Utility Districts (UUD) / Project No. 594590 / Final MND
Final Mitigated Negative Declaration Project No. 594590
Biology Report - UU229 Block 1H (July 2020)
Biology Report - UU906 Block 3CC1 (July 2020)
Posted by City Planning Department
(University) Costa Verde Revitalization / Project No. 477943
Environmental Impact Report (Part 1)
Environmental Impact Report (Part 2)
Findings and Statement of Overriding Considerations 10-20-2020
Appendix A: Notice of Preparation and Responses
Appendix B: Traffic Impact Analysis
Appendix B2: Traffic Supplemental Memo
Appendix C: Air Quality Technical Report
Appendix D: Climate Action Plan Consistency Chechlist
Appendix E: Accoustical Analysis Report
Appendix F: Geologic Reconnaissance Report
Appendix G1: Drainage Study
Appendix G2: Storm Water Quality Managnement Plan
Appendix H1: Water Supply Assessment
Appendix H2: Sewer Memorandum
Appendix H3: Waste Management Plan
Appendix I: Alternatives Traffic Analysis
Posted by Development Services Department
(Southeastern) Sewer Group 843 / Project No. 651025
Posted by Development Services Department
(Southeastern) Sewer and AC Water Group Job 793 / Project No. 663256
Addendum
Mitigated Negative Declaration No. 255100
100% DesignPlans
Archaeological Resoureces Report
Posted by Development Services Department
(Downtown) Tailgate Park Project
Addendum
2006 Final Environmental Impact Report (FEIR) for the Downtown Community Plan, Centre City Planned District Ordinance and 10th Amendment to the Centre City Redevelopment Plan
2007 Addendum to the 2006 FEIR for the 11th Amendment to the Redevelopment Plan for the Centre City Redevelopment Project, Amendments to the San Diego Downtown Community Plan, Centre City PDO, Marina PDO, and MMRP of the Downtown FEIR
2009 Second Addendum to the 2006 FEIR for Amendments to the San Diego Downtown Community Plan, Centre City PDO, and MMRP
2009 Third Addendum to the 2006 FEIR for Amendments to the Residential Emphasis District Amendments to the Centre City PDO
2010 Fourth Addendum to the 2006 FEIR for the San Diego Civic Center Complex Project
2013 Fifth Addendum to the 2006 FEIR for Amendments to the Centre City PDO establishing an Industrial Buffer Overlay Zone
2014 Sixth Addendum to the 2006 FEIR for Amendments to the Centre City PDO and the Tenth Amendment to the Centre City Redevelopment Plan for the India and Dates Streets Project
2016 Final Supplemental Environmental Impact Report to the 2006 FEIR for the Downtown San Diego Mobility Plan
Posted by City Planning Department
(La Jolla) Herschel Avenue / Project No. 632775
Posted by Development Services Department
(Navajo) Pipeline Rehabilitation BA-1 / Project No. 660676
Posted by Development Services Department
(North Park) Addendum to North Park Community Plan Update EIR
(North Park) Addendum to North Park Community Plan Update Environmental Impact Report (Project No. 380611/SCH No. 2013121076) for Land Use and Zoning change of 3.5 acre
Posted by City Planning Department
(Kearny Mesa) Kearny Mesa Community Plan Update / Project No. 607857 / Final Program Environmental Impact Report
(Kearny Mesa) Kearny Mesa Community Plan Update / Project No. 607857 / Final PEIR
(Kearny Mesa) Kearny Mesa Community Plan Update / Project No. 607857 / Draft PEIR
Appendix A: Notice of Preparation (NOP) and Comments on the NOP
Appendix B: Air Quality Technical Report
Appendix C: Biological Resources Report
Appendix D: Desktop Geotechnical and Geologic Hazard Evaluation
Appendix E: Greenhouse Gas Emissions Technical Report
Appendix F: Cultural Resources Constraints and Sensitivity Analyses
Appendix G: Historic Context Statement
Appendix H: Hazardous Materials Technical Study
Appendix I: Hydrology and Water Quality Technical Report
Appendix J: Noise Technical Report
Appendix K: Water and Wastewater Summary
Appendix L: Water Supply Assessment
Appendix M: Transportation Impact Study
Appendix N: Paleontological Resource Assessment
Posted by City Planning Department
(Black Mountain Ranch) Avion Property / Project No. 598173
Errata August 28, 2020
Findings of Fact and Statement of Overriding Considerations
Supplemental Environmental Impact Report
Appendix A: Black Mountain Ranch EIR Subarea I
Appendix B: NOP
Appendix C: Biological Resources Report
Appendix D-1: Historical Resources Survey Report
Appendix D-2: Cultural Test Results
Appendix E: Design Review Guideline for Avion
Appendix F: Air Quality Analysis
Appendix G: Noise Analysis
Appendix H: Traffic Memo
Appendix I:Preliminary Drainage Report
Appendix J: Storm Water Management Quality Management Plan
Appendix K: Preliminary Hydromodification Management Study
Appendix L-1: Geologic Reconnaissance
Appendix L-2: Geotechnical Investigation
Appendix L-3: Response to Geotech Comments 10-23-2018
Appendix L-4: Response to Geotech Comments 04-01-2019
Appendix M: Water System Analysis
Appendix N: Sewer System Analysis
Appendix O: Waste Management Plan
Appendix P: Phase I Environmental Assessment
Posted by Development Services Department
(Mira Mesa) 3Roots / Project No. 587128
Environmental Impact Report Part 1
Environmental Impact Report Part 2
Environmental Impact Report Part 3
Findings of Fact and Statement of Overriding Considerations
Appendix A: Notice of Preparation - Scoping Meeting Transcript-Comment Letters
Appendix B: Transportation Impact Analysis
Appendix C: Air Quality Technical Report
Appendix D: CAP Consistency Checklist
Appendix E: Acoustical Analysis Report
Appendix F: Geotechnical Reports
Appendix G: Biological Technical Report
Appendix H: Long-term Habitat Management Plant Report
Appendix I: Jurisdictional Delineation Report
Appendix J: Archaelogical Resources Report Form
Appendix K: Phase I Environmental Site Assessment Part 1
Appendix K: Phase I Environmental Site Assessment Part 2
Appendix K: Phase I Environmental Site Assessment Part 3
Appendix L: Phase II Environmental Site Assessment
Appendix M: Water Supply Assessment Report
Appendix N: Water Study
Appendix O: Sewer Study & Sewer Flow Addendum
Appendix P: Waste Management Plan
Appendix Q: Preliminary Drainage Report
Appendix R1: Preliminary Hydromodification Management Study
Appendix R2: Hydraulic Analyses
Appendix S: Storm Water Quality Management Plan Part 1
Appendix S: Storm Water Quality Management Plan Part 2
Appendix T: Master Planned Development Permit Part 1
Appendix T: Master Planned Development Permit Part 2
Appendix T: Master Planned Development Permit Part 3
Appendix T: Master Planned Development Permit Part 4
Appendix T: Master Planned Development Permit Part 5
Appendix U: Additional Center Line BRT Analysis
Posted by Development Services Department
(Old Town) Congress Street Parking / Project No. 634652
Posted by Development Services Department