79°

San Diego
Weather

Accessibility Tools

  • Check if your spelling is correct, or try removing filters.
  • Remove quotes around phrases to match each word individually: "blue drop" will match less than blue drop.
  • You can require or exclude terms using + and -: big +blue drop will require a match on blue while big blue -drop will exclude results that contain drop.

Metropolitan Biosolids Center Improvements

Satellite view of Metropolitan Biosolids Center Improvements
View larger image

The Metropolitan Biosolids Center (MBC) is the City’s regional biosolids facility that receives and processes solids from both the North City Water Reclamation Plant (NCWRP) and the Point Loma Wastewater Treatment Plant. The NCWRP will undergo an expansion, upgrades and improvements under Phase 1 of the Pure Water Program, increasing biosolids flows and loadings to MBC. To accommodate these increased loadings, upgrades and improvements at MBC are necessary.

Equipment on site will be replaced, and improvements will be made to several of the process areas, including the on-site pump station. Equipment replacements will be sequenced to allow the plant to remain in continuous operation during construction.

Satellite view of Metropolitan Biosolids Center Improvements

Construction Schedule

Project Started: September 2021

Anticipated Completion: 2025

Construction will primarily take place on weekdays from 6:00 a.m. to 5:00 p.m. The majority of construction activity will take place on City-owned property.

Informational Materials

Background Information

Construction Notices

Community Presentations

  • Documents will be posted when available.